Loading...
HomeMy WebLinkAboutFDP201800015 Review Comments Floodplain Development Permit 2018-09-21s400*0& TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. 1001 Boulders Parkway P 804.200.6500 Suite 300 F 804.560.1016 Richmond, VA 23225 www.timmons.com MEMORANDUM, TO: Mr. Frank Pohl, PE, CFM FROM: Sheila Reeves, PE, CFM �lZII2 DATE: September21, 2018 01 RE: Woolen Mills Flood Study — Response to Comments Comments for the Woolen Mills Flood Study were provided via email on August 29, 2018. The comments are provided below in bold font with the response immediately following. Please let me know if you have any further comments on the submittal. 1) Clearly show/identify all proposed development to occur within the floodplain/floodway on the Floodplain Workmap Exhibit (e.g. stormwater piping and structures are missing, contours do not entirely match the VSMP plan, identify proposed guardrail/lighting/rain garden, mill/overlay of parking areas or travelways, sanitary sewer, etc.). The FDP not only confirms a no -rise condition but also confirms all proposed activities/improvements are in compliance with the County ordinance. All proposed work should be clearly shown on this plan. All layers of the site layout, utility layout (except annotation), and grading plan are now turned on within the Workmap. 2) It is difficult to follow the mapped (effective) floodplain limits. Please make use another line type that is bold. I have changed the line type and increase the width of the line to make the effective limits for the floodplain and the floodway stand out. 3) Please make sure all conditions are shown, as it appears some of the lines disappear. I have reorganized layering to try to improve visibility of the lines. 4) Callout the mapped floodway on both sides of the stream and make the line bold so it is easier to see. Revised. 5) The 100 YR floodplain proposed conditions (no backwater mapped) line appears to stop at contour 316. Please continue this line along with the existing conditions line. The proposed conditions (no backwater) now is visible and mapped to the first cross section along Moores Creek. CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING 1 GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES 6) For the section of parking area located within the floodway, add a note on the Exhibit and VSMP plans stating that this area will be milled and overlaid and no grading/fill will occur. Regrading of parking lot within the floodway is not permitted [18-30.3]. Note has been added to the plan. 7) One other clarification, in section 4 of the report, 'Results', first sentence, should "...with the backwater condition..." be "without the backwater condition"? You then state 'therefore, the regulatory base flood elevations will not change as a result of the proposed improvements." Can you give me a call to discuss? We have discussed this comment via phone, and I have revised the Results section of the narrative to clarify this statement.