Loading...
HomeMy WebLinkAboutFDP201800019 Review Comments Floodplain Development Permit 2018-09-17Frank Pohl From: Frank Pohl Sent: Monday, September 17, 2018 2:39 PM To: 'Jonathan Showalter' Subject: RE: Planning Application Review for FDP201800019 Lighthouse Instruments - FDP. Attachments: Lighthouse Industries.pdf I forgot to include this attachment. Frank V. Pohl, PE, CFM County Engineer 401 McIntire Road Charlottesville, VA 22902 434-296-5832 (ext. 7914) From: Frank Pohl Sent: Monday, September 17, 2018 1:37 PM To: 'Jonathan Showalter' <Jonathan.Showalter@timmons.com> Subject: Planning Application Review for FDP201800019 Lighthouse Instruments - FDP. Jonathan, Mr. Veale did not provide any contact information for the FDP application received on Friday. Can you pass this along to him for me please? Please confirm. Thanks, Frank The Review for the following application has been completed: Application Number = FDP201800019 Reviewer = Frank Pohl Review Status = Denied Completed Date = 09/17/2018 This email was sent from County View Production. Engineering Comments: - Refer to Albemarle County Design Standards Manual for permitting requirements. - Provide a set of drawings showing: • All proposed development/work to occur within the floodplain, including grading (existing/proposed), improvements, etc.. • Flood Hazard Overlay District information (limits of floodplain, floodway, flood elevations, FIRM panel #, and the flood zone). - Remove the County Engineer's (CE) name from the application. Instead, state that what you are proposing meets the floodplain regulations and why, not that the CE said it was okay. - Submit a no -rise certification. 1 - Provide a contact phone number as required on the application (or email address).