HomeMy WebLinkAboutFDP201800019 Review Comments Floodplain Development Permit 2018-09-17Frank Pohl
From: Frank Pohl
Sent: Monday, September 17, 2018 2:39 PM
To: 'Jonathan Showalter'
Subject: RE: Planning Application Review for FDP201800019 Lighthouse Instruments - FDP.
Attachments: Lighthouse Industries.pdf
I forgot to include this attachment.
Frank V. Pohl, PE, CFM
County Engineer
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 (ext. 7914)
From: Frank Pohl
Sent: Monday, September 17, 2018 1:37 PM
To: 'Jonathan Showalter' <Jonathan.Showalter@timmons.com>
Subject: Planning Application Review for FDP201800019 Lighthouse Instruments - FDP.
Jonathan,
Mr. Veale did not provide any contact information for the FDP application received on Friday. Can you pass this along to
him for me please? Please confirm.
Thanks,
Frank
The Review for the following application has been completed:
Application Number = FDP201800019
Reviewer = Frank Pohl
Review Status = Denied
Completed Date = 09/17/2018
This email was sent from County View Production.
Engineering Comments:
- Refer to Albemarle County Design Standards Manual for permitting requirements.
- Provide a set of drawings showing:
• All proposed development/work to occur within the floodplain, including grading (existing/proposed),
improvements, etc..
• Flood Hazard Overlay District information (limits of floodplain, floodway, flood elevations, FIRM panel #,
and the flood zone).
- Remove the County Engineer's (CE) name from the application. Instead, state that what you are proposing meets the
floodplain regulations and why, not that the CE said it was okay.
- Submit a no -rise certification.
1
- Provide a contact phone number as required on the application (or email address).