HomeMy WebLinkAboutWPO201800054 Action Letter 2018-09-25CwVfi" 0--, Akdke f.awWy C
SYAP Hb* ❑ Bond 678p
Wffnfng ❑ [Ni*NTC
Under SIND ❑ R"Veiadidvr pbe) [
SWPPP INSPECTION _
Project Name: Re Number. VJ 000
DEQ General Permit Number: f
inapeator: kopec don Date: - ` ! Time:
For Wamings or Abftes, DATE TO CMM 8y
tnplaf raontrnts ❑ cieaft ❑ MWO Grading 0 Cortsbudffl 0 Rnish &Bdingg ❑ Simon ❑ own CMvensim p
i. Yes lb I cbmMer"woles,
at theThe coverage Mar and SWPPP book location must be posm in a prominent place at
sate entrance A I the entrance io the joli she. avalable to the public on request.
=1,= M
how
f A current coverage letter (expiration date of 2018) must be included
Regftadon A registration statement must be included that goes with the coverage letter. The
Stalement acreage disturbed must be accurate.
PPP A olhraorr.verHion_ lean and Y. fftswow DEQ ti imde must
be included in.dw SWPPP. The .plan must be marked to,show kK atlon of measures.
Inspection Reports must be up4o-date, infbinnahm, documenting Pr�obi s. and ooarning at
report I A required intervals. Rain events and inspections for rain everts must be noted.
onSPOCODnj P f J l ResWts of inspections must be folloMred up with con, ed*e artiOns where necessary
rued / Fueling stations must be contained, and sell prevention and dearurp kits in place
station V .
Washout A lined sump area must be provided for any concrete washout. Washout Nooities for
paint, gra, etc. are also needed.
Trash and Trash and debris must be cleaned up so that it does not leave the job ske. Any
debris contaminates must be protected from becoming runoff during rains (cover dumpsters).
Trash is not to be burled on -elle.
brosion and
Sediment
Control and
stormwater
Management
per pians and
Standards
must be
from inlets.
A co r !s
Lje- beep rVN
and
away