Loading...
HomeMy WebLinkAboutWPO201800005 SWPPP and Erosion Control Inspection WPO VSMP 2018-09-18CompliantN Noticely El Wavle ap Under SIMO ❑ Re4nspeof m fee) ❑ SWPPP INSPECTION Project Name: J9 i in ei M V /WO/"S File Number: W pt90?01&P6 VS DEQ General Permit Number Q Z County Inspector. 19 f� rl Inspection Date: - Z J - h? Time: . Fbr Warnings or Akft s, DATE TO COMPLY BY Initial contrnis ❑ Clewing ❑ Rough c3rading)9 Construction Finish Grading ❑ StabNi o&m ❑ rmn convmon 0 C mmenWNotes Posting at the The coverage letter and SWPPP book location must be posted in a prominent place at site entrance V the entrance to the job' site, available to the public on request. awrrr - l no complete document must be available for inspection on•site available for review Coverage / A current coverage letter (expiration date of 2019) must be included Regrstratlon A registration statement must be Included that goes with the coverage letter. The Statement acreage disturbed must be accurate. PPP plan A copy of the pollution prevention plan and a Copy of the current DEQ permit code must be included in the SWPPP. The plan must be marked to show location of measures. Inspection 1///, Reports must be upto-date, Informative, documenting Problems, and occurring at reportsrequired Intervals. Rain events and Inspections for rain events must be noted. must be followed up with corrective actions where netmsary ruwng / Fueling stations must be contained, and spill prevention and deanup kits in place station Washouts A lined sump area must be provided for any concrete_ washout. Washout faciities for paint, grouts, etc. are also needed. Trash and Trash and debris must be cleaned up so that it does not leave the job site. Any debris contaminates must be protected from becoming runoff during rains (cover dumpsters). Trash is not to be buried on -site. Sanitation facilities must be provided and maintained, and protected from spills, away from inlets. Erosion and Sediment Control and Stormwater Management Per Plans and Standards Compliant M Notice to Comply[ Stop Work ff Bond Insp [ Waming ❑ Under NTC [ Under SWO ❑ Re -inspection (fee) [ Erosion Control Inspection Report Project Name: Oa m BP Number. V PO 20je 0 me's Location Contractor County Inspector: �mq p ,�� Inspection Date:Lot # For Warnings or Notices, DATE TO COMPLYBY Agreement # Initial controls ❑ Clearing ❑ Rough Grading Construction Finish Grading ❑ Stabilization ❑ swm converslon [] CommmentsAVotes-�-------�--- -- yes A ---� Silt, safety, tree fence - - � ----- - Diversions, � Berms, j ditches .t, culvert I Aection Stream i f work, crossings-. Traps, w Basins i Stabilization Entrances Ltmi#s I Washout Disposal Solid Waste Disposal Sanitary Waste Fuel/Ofl — Storage SWPPP r---npliance �-'ermit----- - -- Posting