Loading...
HomeMy WebLinkAboutWPO201800038 Other 2018-09-25Surface Water Impact Certification Statement of Basis I understand that any surface water or wetland impacts associated with this project, including any subsequent modifications or additions thereto, may require specific authorization from DEQ under the Virginia Water Protection Permit Program before any such impacts are taken. I also understand that impacting surface waters including wetlands without a permit, when such a permit is required, may subject the project proponent to enforcement action for violations of State Law and/or Regulation. As such, I have used due diligence in assessing the presence of surface waters, including wetlands, on the project site to ensure that no unauthorized impacts are associated with the proposed project. This assessment included the following (please check all that apply): 0 USACE Confirmed Jurisdictional Determination Q On-site evaluation by a qualified wetland professional NRCS Soil Maps 0 National Wetland Inventory Maps USGS Topographic Maps 0 Other (please specify) NWI Map shows R4SBC (Riverine, intermittent, streambed, seasonally flooded). Based on this review, I hereby certify that: E:1 No surface waters or wetlands exist on the property. 0✓ Surface waters or wetlands exist on the property but no impacts to those regulated areas will occur as a result of this project. 0 Surface waters or wetlands will be impacted but those impacts are exempted from permit requirements per 9 VAC 25-210-60. Please cite specific exemption: No impact; this natural -method stream restoration project is anticipated to enhance aquatic /wetland values. Surface waters or wetlands will be impacted and have been permitted by the DEQ and/or the AUSACE. Copies of these permits are attached. Printed Name and Title Date Surface Water Impact Certification Statement of Basis I understand that any surface water or wetland impacts associated with this project, including any subsequent modifications or additions thereto, may require specific authorization from DEQ under the Virginia Water Protection Permit Program before any such impacts are taken. I also understand that impacting surface waters including wetlands without a permit, when such a permit is required, may subject the project proponent to enforcement action for violations of State Law and/or Regulation. As such, I have used due diligence in assessing the presence of surface waters, including wetlands, on the project site to ensure that no unauthorized impacts are associated with the proposed project. This assessment included the following (please check all that apply): 0 USACE Confirmed Jurisdictional Determination 0 On-site evaluation by a qualified wetland professional 0 NRCS Soil Maps 0 National Wetland Inventory Maps 0 USGS Topographic Maps 0 Other (please specify) NWI Map: offsite R4SBC (Riverine, intermittent, streambed, seasonally flooded). Based on this review, I hereby certify that: 0 No surface waters or wetlands exist on the property. 0✓ Surface waters or wetlands exist on the property but no impacts to those regulated areas will occur as a result of this project. 0 Surface waters or wetlands will be impacted but those impacts are exempted from permit requirements per 9 VAC 25-210-60. Please cite specific exemption: Project consists of restoration of a failed stormwater management facility > 0.1 Mi. from R4SBC resource. 0 Surface waters or wetlands will be impacted and have been permitted by the DEQ and/or the U,SACE. Copies of these permits are attached. 7 4 r Date Printed Name and Title Surface Water Impact Certification Statement of Basis I understand that any surface water or wetland impacts associated with this project, including any subsequent modifications or additions thereto, may require specific authorization from DEQ under the Virginia Water Protection Permit Program before any such impacts are taken. I also understand that impacting surface waters including wetlands without a permit, when such a permit is required, may subject the project proponent to enforcement action for violations of State Law and/or Regulation. As such, I have used due diligence in assessing the presence of surface waters, including wetlands, on the project site to ensure that no unauthorized impacts are associated with the proposed project. This assessment included the fallowing (please check all that apply): F-71 USACE Confirmed Jurisdictional Determination F_ On-site evaluation by a qualified wetland professional 0 NRCS Soil Maps 0 National Wetland Inventory Maps 0 USGS Topographic Maps 0 Other (please specify) NWI Map /JD show R4SBC (Riverine, intermittent, streambed, seasonally flooded). Based on this review, I hereby certify that: 0 No surface waters or wetlands exist on the property. 0 Surface waters or wetlands exist on the property but no impacts to those regulated areas will occur as a result of this project. E] Surface waters or wetlands will be impacted but those impacts are exempted from permit requirements per 9 VAC 25-210-60. Please cite specific exemption: Temp. impact; natural -method stream restoration project is anticipated to enhance aquatic /wetland values. 0 Surface waters or wetlands will be impacted and have been permitted by the DEQ and/or the I USACE. Copies of these permits are attached. 4< Z irature Date Printed Name and Title COUNTY OF ALBEMARLE 401 McIntire Road Charlottesville, Virginia 22902-4596 FROM: Muhammad I. Khan Caroline Hsiao-Hua Chou 844 Chapel Hill Road Charlottesville, VA 22901 RE: Stream Restoration on Parcel ID 061 Z0-01-00-00400 Dear County of Albemarle: As the owners (the "Owners") of Albemarle County Parcel ID 061ZO-01-00-00400 (the "Property"), we hereby grant permission to the County of Albemarle, its employees, agents, contractors, and assigns (collectively, the "County") to enter upon the Property to enable the installation of stream restoration improvements by the County. We hereby make this Property available to the County as is. Further, the County, its employees, agents and contractors enter the Owners' Property at their own risk for the term of the installation. This Right -of -Entry shall expire upon completion of installation. OWNERS Muhammad L Khan Date: Caroline Hsiao-Hua Chou Date: 1-5-1 �l Witness: Witness: J" •�-- Wetland S"`iies and Soluda"I'l a DAIEV1 company December 28, 2017 Via Email: janderson2galbemarle.org John Anderson, P.E. County of Albemarle Project Management Division 401 McIntire Road Charlottesville, VA 22902 Re: Jurisdictional Determination (NAO-2017-02165) Waters of the U.S. (Including Wetlands) Delineation Chapel Hills Stream Restoration (f 4 acres) Albemarle County, Virginia WSSI #30057.01 Dear Anderson: Enclosed is a copy of the U.S. Army Corps of Engineers' Jurisdictional Determination (JD) (NAO-2017-02165) confirming the wetland delineation prepared by Wetland Studies and Solutions, Inc. This JD is valid for a period of five years from the date that it was issued (December 27, 2017). Please note that this JD is only the U.S. Army Corps of Engineers verification of the wetland delineation and does not constitute authorization to impact any waters of the U.S. on the site. If you have any questions, please contact me Omoore@wetlandstudies.com; 703-679-5708). Sincerely, WETLAND ST DIES AND SOLUTIONS, INC. an Moore ssociate Environmental Scientist Enclosure cc: Blake Abplanalp, Chief of Project Management (w/enc.) 5300 Wellington Branch Drive • Suite 100 • Gainesville, VA 20155 • Phone 703.679.5708 • FaxJ T 9.5601 ejmoore@wandstudies.com • www.wetlandstudies.com V i 1 I�� I Li.•.•.••:1�r„��i:�.l� f �, . i,^CT k'ki''=*�'�I