Loading...
HomeMy WebLinkAboutARB201800119 Action Letter 2018-10-01COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 2%-5832 . -_- _ _ Fax (43 AN 972-4126 October 1, 2018 Scott Collins Collins Engineering 200 Garrett Street, Suite K Charlottesville, VA 22902 RE: ARB -2018-119: Microaire Initial Site Plan Dear Scott, At its meeting on Monday, October 1, 2018, the Albemarle County Architectural Review Board unanimously voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2),(3) and (5) and recommended conditions of initial plan approval: None. • Regarding recommendations on the plan as it relates to the guidelines: None. Regarding conditions to be satisfied prior to issuance of a grading permit: None. • Regarding the final site plan submittal: A Certificate of Appropriateness is required prior to Final Site Plan approval. Address the following issues in addition to all items on the ARB Final Site Plan checklist. 1. Proposed architectural designs are required with the final ARB site plan submittal. 2. Show the locations of proposed rooftop mechanical equipment on the architectural plans and elevations to confirm the lack of visibility from the EC. 3. Provide a photometric plan and all related details with the final site plan submittal. Show that relocated poles and fixtures meet ordinance requirements and EC guidelines. 4. Revise the landscape plan to provide large shade trees, 31/Z" caliper at planting, 35' on center, the full length of the EC frontage. Provide interspersed ornamentals, using a mix of new and existing trees to establish and integrated, orderly appearance. Locate evergreen shrubs to provide a consistent screen along the parking lot. 5. Provide trees along pedestrian ways where parking lot trees are not already provided. 6. Provide perimeter parking lot and interior parking lot trees as outlined in the EC guidelines. Revise the plan to clearly show this planting for both the current and future parking areas. 7. Provide evergreen shrubs to form a consistent screen along the EC side of the parking lot. S. Coordinate the number of cherry trees and holly shown on the plan and listed in the legend. 9. Throughout the plan set indicate a single, accurate building area for the proposed addition. 10. Identify existing trees to be removed on the existing conditions/demolition plan. 11. If approval of the future parking area is desired with the current site plan, revise the plan to show all details for the future parking area. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemarle.org/ARB. Please be certain that your ARB submittal addresses the above -noted issues. If you have any questions concerning any of the above, please feel free to contact me. Sincerely, Margaret Maliszewski Chief of Planning/Resource Management cc: 1641 Edlich Drive Realty LLC 3590 Grand Forks Blvd Charlottesville VA 22911 File