Loading...
HomeMy WebLinkAboutWPO201800046 Correspondence WPO VSMP 2018-07-31 Pre-con meeting Sheet • Ask for Cards • Talk about "First Steps" ( Only E&S controls and Tree Protection allowed) °rt'15 11A0-54- r-W-ed`pm' ts • Reinspection Fees = Warnings, NTC and SWO in that order with reinspection fees of $250. With each reinspection (Mud in the roadway will have a NTC issued without a warning) • Albemarle County ordinance with 3:1 slopes. Slopes that are greater than 3:1 will have to have ground cover applied. • Use of top soil is required for permanent stabilization. • Use Buckwheat seed for topsoil stockpile stabilization Review the 9 month County ordinance which gives the operator 6 months of major grading prior to contacting the County Engineer for a 3 month extension • Pass out plans: 1 for Owner, 1 for Developer and 2 for the County's use —Make sure they are stamped PreCon Meeting Sheet VSMP-SWPPP • Make sure the SWPPP book is available at all times/ Post SWPPP doc at Construction Entrance —Contact list (site Operator with Phone # and location of SWPPP book), Gen Permit and Reg Statement signature sheet • E&S plan with Narrative • Cuts and fill logs/Activity log-record of the grading operations during construction with location, dates for start of grading and stabilization • Full list of all potential chemical pollutants sources that will be on site (Fuel, oil, concrete additives, pesticides, herbicides...etc.) with MSDS clean up procedures outlined. • A listing of all subcontractors with their potential chemical pollutants and MSDS clean up methods will also have to be included • The SWPPP plan will also show where on site are the current locations of the protected Concrete washout area, Port-a-john and the Chemical storage area, updated as these areas are moved • Site inspections (Impaired waterways) once every 4 days or once every 5 and 48 hours after a storm event (anything over ")Time/date, record amount of rainfall (if any), deficiencies and corrective measures made, condition of Concrete washout/Chemical Storage/Port-a-john ...all inspection items are listed in your VPDES General Permit for Stormwater Discharge.