Loading...
HomeMy WebLinkAboutWPO201800026 Bond Estimates 2018-10-02Protect Name: VSMP/WPO #201800026 Plans for Caliber Collision WPO file number: WP0201800026 TMP(s): 07700-00-00-011 FO Date Estimate Completed: 10/02/18 Stormwater Management Plan Bond Estimate Item Item Number 1 permanent diversion or ditch 2 earthwork for trap/basin(bioretention) 3 height of dam at toe 0 ft cut at high side 0 ft 4 height of fill at face 0 ft cut at face 0 ft 5 length of dam 0 ft length of cut 0 ft 6 top width 0 ft width of cut 0 ft 7 (area above transition) 0 sf (area below transition 0 sf 8 (total width of dam) 0 ft (total width of cut) 0 ft 9 (height below transition) 0 ft (depth below transitioi 0 ft 10 (area below transition) 0 sf (area above transition 0 sf 11 *Earthwork complete w/ ESCP (TRAP) (total fill volume) _qcy (total cut volume) -cy 12 length of spillway 0 ft (TOAL CY estimate) 0 cy 13 width of spillway 0 ft (spillway stone tons) 0 tons 14 structures for basin (DETENTION POND) 15 riser height ft 16 *Calculated /Included w/ ESCP (TRAP) riser diameter in (riser unit price) $0.00 17 barrel length ft base plate or fdn 18 barrel diameter in (barrel unit price) $0.00 19 outfall -pipe end section 20 NA standard manhole frame top (not inlet) 21 NA manhole structure (per ft. rise) 22 NA trees 23 NA shrubs 24 NA seedlings 25 NA underdrain (LF) 26 NA biofilter soil mix (CY) - 1693 sf x 2' depth 27 trash rack/ anti vortex devices 28 Maintenance Access road (LF) 29 rip -rap, placed depth ft length I ft 30 width (tons) 31 NA rip -rap, placed (sediment forebay Vol. -ref bioretention detail) depth ft length ft 32 width (tons) 33 NA 4" depth choker stone (biofilter) depth ft length ft 34 width (tons) 35 NA biofilter 28" stone depth; see bio-retention schedule, C8 depth ft length I ft 36 width (tons) 0 37 survey and layout (price per 0.1 mi.) acres 0.25 basins 1 38 mobilization 39 as -built drawings (per facility) 40 materials testing (per facility) 41 compaction testing (per dam) J. Anderson, 10/2/18 W P0201800026_S W M_bond_est Caliber Collision 100218 No. Unit Unit Cost installed 0 ft $13.00 $0.00 $13.00 $0.00 $50.00 $0.00 $0.00 $200 $0 $0.00 0 each $500.00 $0.00 0 each $500.00 $0.00 0 ft $450.00 $0.00 ea $150.00 $0.00 ea $50.00 $0.00 ea $5.00 $0.00 ft $5.00 $0.00 cy $38.00 $0.00 1 ea $1,500.00 $1,500.00 ft $50.00 $0.00 $60.00 $0.00 $60.00 $0.00 $25.00 $0.00 Use VDOT 21A ROAD Plan per unit, $35 $35.00 $0.00 Cost $625.00 $500.00 1 ea $2,000.00 $2,000.00 ea $2,000.00 $0.00 0 ea $5,000.00 $0.00 cost sum $4,625.00 proj mgmt $0.00 contingency $462.50 Total $5,090 10/2/2018