Loading...
HomeMy WebLinkAboutWPO201800026 Bond Estimates 2018-10-02 (2)Project Name: VSMP/WPO #201800026 Plans for Caliber Collision WPO file number: WP0201800026 TMP(s): 07700-00-00-011 FO Date Estimate Completed: 10/02/18 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stablizalion (PS, TS) Eacres $5,000.00 $9,500.00 silt fence (SF) ft $5.00 $6,300.00 safety fence (SAF) - south property line ft $5.00 $1,250.00 diversion (DD, FD, RWD) ft $13.00 $8,021.00 earthwork for trap/basin direct entry: Drawing 4 height of dam at toe ct at high sideOft ft provided Vol.: ±19,597 C.F. height of fill at faceOft ft cut at faceft length of damft length of outft lop width ft width of cut (area above transition) 0 sf (area below transitior 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition' 0 ft (depth below transitic 0 ft (area below transition) 0 sf (area above transitim 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 Cy length of spillway =ft (TOAL CY estimate) 0 Cy 725.82 cy $13.00 $9,435.66 width of spillway It (spillway stone tons) 5.8 tons $50.00 $290.00 structures for basin riser ht.: total of Str. 8,7,6 (riser, 5' square) riser height It riser diameterMin in (riser unit price) $150.00 $3,000.00 length: total, Str. 8 to outfall /ES NIC barrel lengthft base plate or No $200.00 $200 barrel diameter (barrel unit price) $50.00 $9,200.00 barrel collars $200.00 $0 baffle length Mft $50.00 $0 silt fence inlet protection (IP) ■ $00.00 $0.00 stone inlet protection (IP) $2200.00 $400.00 outlet protection ( length ft width It $0.00 $0.00 channel (SCC, matted) length ft width ft $0.00 check dam depth in channel ro, ft channel width Oft $135.00 $270.00 construction entrance (CE) $2,500.00 $0.00 wash rack $2,000.00 $2,000.00 paved construction entrance $3,500.00 $3,500.00 rip -rap, placed depth 1.5 ft length _ft Drawing 19, structure #1, Class At dry width 4.5 (tons) 1.74656 tons $60.00 $104.79 rip -rap, placed depth 1.5 ft length _ft Drawing 19, structure #3, Class At dry width 4.5 (tons) 1.74656 tons $60.00 $104.79 rip -rap, placed depth 2.5 ft length _ft Drawing 19, structure #9, Class I dry width 9.5 (tons) 10.2422 tons $60.00 $614.53 rip -rap, placed depth 0.25 ft length _ft Drawing 19, flume outlet, Class At dry width 5.0 (tons) 0.35938 tons $60.00 $21.56 survey and layout (price per 0.1 mi.) acres IIIM traps and basins $625.00 mobilization $2,500.00 stream crossing (computed independently) $0.00 cost sum $57,337.34 contingency $5,733.73 WPO201800026_ESC_bond _esl Caliber Collision 100218.xlsx Total $63,080 10/2/2018