SHEET INDEX
SHEET 2 EROSION & SEDIMENT CONTROL PLAN
SHEET 3 STORM WATER MANAGEMENT PLAN
REVISIONS
APPROVALS I
ENGINEERING
E&SC DETAILS
LEGEND
W WATER LINE (EX. / PROP.) BOUNDARY/ RIGHT-OF-WAY LINE
WV® WMO WATER VALVE 1 METER I.F. IRON PIN FOUND
SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control,VA. DSWC PLATE. 3.05-2 SOURCE: VA. DSWC PLATE 3.07-6 FHA -6 FIRE HYDRANT I. S. IRON PIN SET
DRAINAGE SWALE DIRECTS FLOW Sherwood and Wyant
TO SEDIMENT BASIN YH YARD HYDRANT SETBACK LINE
70' MIN.
1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH BOAC BLOW -OFF ASSEMBLY EASEMENT LIMITS
UIPSLOPE ALONG THE LINE OF SS SANITARY SEWER LINE (EX. / PROP.) CENTERLINE
3" SM -2A ASPHALT TOP COURSE STAKES. COO CLEANOUT CONTOUR LINE (EX. / PROP.)
A EXISTING 6'MAX.
2°l0 2% PAVEMENT f - �_-�..,�`' MH-- MANHOLE f-3. — E-2,5075-- DEGREE / DIRECTION OF SLOPE
`'`�.�� ,.�� •.,, --. SD STORM LINE (EX. / PROP.) 479.70+ SPOT ELEVATION
DIVERSION DITCH A -J _- ,% _ Il .�'- ,--`'+ DIC STORM INLET HP HIGH POINT
AGGREGATE BASE �"�-----�. ,,f, " III/ YD® YARD DRAIN LP LOW POINT
/ •�' f.—�,',/ �^ / DSo DOWNSPOUT DITCH / SWALE
SIDE ELEVATION' _ G� ..-� �. GAS LINE (EX. / PROP.) WATER COURSE
FLOW ,. - - GVO GMO GAS VALVE / METER BM+ BENCHMARK
OHE OVERHEAD ELECTRIC (EX. / PROP.) CG -2 VDOT STD. HEADER CURB
EXISTING GROUND 4° UGE UNDERGROUND ELECTRIC (EX. / PROP.) CG -6 VDOT STD. CURB & GUTTER
iA
PPO POWER POLE CG -12 VDOT STD. HANDICAP RAMP
r LP* LIGHT POLE HC HANDICAP PARKING SYMBOL
DIP DUCTILE IRON PIPE
GUY.' GUY WIRE RCP REINFORCED CONCRETE PIPE
70' MIN. 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT EM o ELECTRIC METER CMP CORRUGATED METAL PIPE
TO STAKES AND EXTEND THE EXCAVATED SOIL. � TRANSFORMER PVC POLYVINYLCHLORIDE PIPE
ASPHALT PAVED WASHRACK 10' MIN. IT INTO THE TRENCH. OHT OVERHEAD COMMUNICATIONS (EX. / PROP.) HDPE HIGH-DENSITY POLYETHYLINE PIPE
'
PEDO UTILITY PEDESTAL F
2°l0 �,�����z �r� i ,Y,�4, l � , ;, ;�, UGT UNDERGROUND COMMUNICATIONS (EX.1 PROP.) VC VITRIFIED CLAY PIPE rFIFE FINISHED FLOOR ELEVATION
� � K s � SWMIDWM
12' MIN. EXISTING o/6-6 j j " t 'r - `
.� x / ti - r SINGLE I DOUBLE WATER METER TBR TO BE REMOVED
ter' GV D4 GATE VALVE
2 2°l0 TBT TO BE TRANSPLANTED
_ PAVEMENT a /�- GRAVEL FILTER
°l0 �'w'� `' ,,nll,li y - -K' ; RUNOFF WATER WIRE MESH TBS TO BE SAVED
#��._ � 11111
DIVERSION DITCH MIN. POSITIVE DRAINAGE _F
�1t' MIN
WIDTH AT DESIGN WATER TO SEDIMENT
ELEVATION IS 4.0' I TRAPPING DEVICE
PLAN VIEW
MUST EXTEND FULL WIDTH
OF INGRESS AND EGRESS
OPERATION
MIN.
NOTE: A MINIMUM WATER TRAP OF 1" IS REQUIRED
WITH A MINIMUM WASH HOSE DIA. OF 1.5"
SECTION A—A
SET 1Y2" WATER HYDRANT WITH
FROST PROOF HYDRANT 3'
ABOVE GRADE AND 4' OFF
EDGE OF PAVEMENT
ALBEMARLE COUNTY CONSTRUCTION ENTRANCE
SECTION
E-001
N.T.S.
FLO/ C_
W J
SHEET FLOW INSTALLATION
(PERSPECTIVE VIEW)
POINTS A SHOULD BE HIGHER THAN POINT B.
DRAINAGEWAY INSTALLATION
(FRONT ELEVATION)
CONSTl[2UCTION OF A SILK' FENCE
(VVITHOUT WIRE SUPPORT)
E-028
N.T.S.
�4} 40
�. .. N
_
DEPTH)
•
. i
-- '� mll IIIII
till
• .•_....,_._.�,•_,.,.�.:._-; �„_—,�.�-..._
!��«"ii�ils'�r/rr f11< •�s.ar+�+��`fii►",�,
—'llllll�llllll IIIIIWITH SEDIMENTLi
9F
•�•.�� ry •_�:.-.�.►�1,.;.,..�;a.►y .�.�1._..
IT
SEDIMENT A'
CONCRETE GUTTER 12'
CURB INLET
_I
WIRE MESH
SPECIFIC APPLICATION
G
SEDIMENTFILTERED
SPECIFIC APPLICATION
THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS
WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE
INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED
AREAS.
. GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE.
GRAVEL CURB INLET SEDIMENT FILTER
SECTION
E-012
N.T.S.
THIS METHOD OF INLET PROTECTION IS APPLICABLE
WHERE HEAVY CONCENTRATED FLOWS ARE EXPECTED
BUT NOT WHERE PONDING AROUND THE STRUCTURE
MIGHT CAUSE EXCESSIVE INCONVENIENCE OR DAMAGE
TO ADJACENT STRUCTURES AND UNPROTECTED AREAS.
GRAVEL SHALL BE VDOT #3, #357 OR 95 COARSE AGGREGATE.
GRAVEL & WIRE MESH DROP INLET SEDIMENT
FILTER
SECTION
E-013
N.T.S.
►Ian Franklin PE, LL(
Civil and Site Plan Engineering
427 Cranberry Lane Crozet, VA 22932
434-531-5544
alan@alanfranklinpe.com
4���R'V I H 0p,
Ian ranklin
Lic. No. 35326
G
SsJoNAL
ISSUED:
SCALE:
REVISIONS:
um
•
APPROVED
by the Albemarle County
Cornmunity,Develnpment Department
Date
File
SHEET
OF 3
EROSION &, SEDIMENT CONTROL PLAN NOTES:
1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION
CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR
TO THE FINAL INSPECTION.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO
MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND
VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN
CLEARING.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL
TIMES.
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS
(INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A
SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING
AUTHORITY.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES
NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.
7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND
DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH
RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS
OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA.
11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS
ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS.
12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE
SECTION 5.1.28.
13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF
ALBEMARLE.
14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE
HOURS OF 7:00 AM TO 9:00 PM.
15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT,
OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS,
AND DAMAGE TO ANY PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE.
16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT
STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY
THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY.
17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE,
AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50150 MIX OF ANNUAL RYE GRASS AND CEREAL
WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF
GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY
THE COUNTY EROSION CONTROL INSPECTOR.
18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL
GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL.
FERTILIZER SHALL BE APPLIED AT 1000LBSIACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING
SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYE
GRASS OR KENTUCKY BLUEGRASS. STRAW MULCH 1S TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT
TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR.
19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR
CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN
50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN
NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DIKES WHICH ARE COLLECTING
SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY.
20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL
SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY
EROSION CONTROL INSPECTOR.
POLLUTION PREVENTION PLAN NOTES
POTENTIAL POLLUTANT SOURCES
• THE POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THE LAND DISTURBANCE OF THE SITE, AS ILLUSTRATED
BY THE DISTURBANCE AREA, CONSISTS OF MINOR MAINTENANCE AND EQUIPMENT FUELING OPERATIONS. THESE
ACTIVITIES SHALL BE LIMITED TO THE SPECIFIC AREA SHOWN ON THIS PLAN. IN ADDITION, THERE WILL BE
FERTILIZER, SEED, AND STRAW TEMPORARILY STORED AND UTILIZED FOR BOTH TEMPORARY AND PERMANENT
SEEDING OPERATIONS.
• THERE WILL BE A PORTA-JOHN, A DUMPSTER FOR SOLID WASTES, A FREIGHT CONTAINER FOR STORAGE
MATERIALS, AND AN ABOVE GROUND CONCRETE WASH-OUT AREA LOCATED IN THE PROPOSED CONSTRUCTION
STAGING AREA AS SHOWN ON THE PLAN. ALL MATERIAL DELIVERY AND STORAGE SHALL OCCUR IN THE
CONSTRUCTION STAGING AREA. ALL VEHICLE, MATERIAL, AND EQUIPMENT WASHING SHALL OCCUR IN THE
STAGING AREA ORAT THE WASH RACK. THE CONTRACTOR SHALL ENSURE THAT THE DRAINAGE AREA FROM THESEE
ACTIVITIES FLOWS TO SEDIMENT TRAPPING DEVICES.
RECEIVING WATERS
• RUNOFF FROM THIS SITE DRAINS TO MANMADE STORM DRAIN SYSTEMS THAT FORM TRIBUTARIES OF MEADOW
DISTURBED AREA IS .7 ACRES. PROPOSED SEDIMENT
CREEK SEVERAL PARCELS DOWNSTREAM. THE PROPOSED STURB 9 8 AC S OS
BASINS, INLET PROTECTION ON EXISTING AND PROPOSED SITE DROP INLETS, AND SILT FENCE WILL ADEQUATELY
PROTECT AGAINST SILTATION DOWNSTREAM.
STORMWATER MANAGEMENT
• THIS SITE HAS BEEN DESIGNED IN ACCORDANCE WITH 4VAC25-870-93 PART 11-C. SEE THE WPONSMP PLAN FOR
SPECIFICS RELATING TO STORM WATER QUALITY AND QUANTITY COMPLIANCE.
INSTALLATION & MAINTENANCE
• ALL EROSION CONTROL MEASURES ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK, THIRD EDITION 1992.
• ALL LAND DISTURBING ACTIVITIES SHALL BE IN ACCORDANCE WITH VIRGINIA EROSION AND SEDIMENT CONTROL
LAW AND REGULATIONS 4VAC25-840.
• EXISTING VEGETATION SHALL BE PRESERVED TO MAXIMUM EXTENT PRACTICAL AND DISTURBED PORTIONS OF THE
SITE SHALL BE STABILIZED AS QUICKLY AS POSSIBLE.
• IF PERIODIC INSPECTIONS OR OTHER INFORMATION INDICATED THE NEED FOR MODIFYING OR PROVIDING
ADDITIONAL EROSION CONTROL MEASURES, THE OPERATOR MUST REPLACE OR MODIFY THE MEASURES AS SOON
AS POSSIBLE, AS WELL AS UPDATE THE SWPPP.
• ALL CONSTRUCTION MATERIALS AND DEBRIS SHALL BE STORED WITHIN THE LIMITS OF DISTURBANCE.
• ANY LITTER EXPOSED TO STORMWATER SHALL BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN
STORMWATER DISCHARGES. THE CONSTRUCTION SITE SHALL BE MONITORED DAILY TO CONTROL LITTER.
• TEMPORARY PORTA-JOHNS SHALL BE UTILIZED DURING CONSTRUCTION AND SHALL IBE LOCATED WITHIN THE
DISTURBED AREA.
• ALL POLLUTION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED IN AN EFFECTIVE OPERATING CONDITION
IN ACCORDANCE WITH GOOD ENGINEERING PRACTICE AND, WHERE APPLICABLE, MANUFACTURER
RECOMMENDATIONS. IF SITE INSPECTIONS IDENTIFY CONTROL MEASURES ARE NOT OPERATING EFFECTIVELY,
MAINTENANCE SHALL BE PERFORMED AS SOON AS POSSIBLE TO MAINTAIN CONTINUED EFFECTIVENESS OF THE
STORMWATER CONTROLS.
• IN THE EVENT THAT ADDITIONAL AREAS ARE BEING UTILIZED FOR CONTAMINATE DISPOSAL, NOT SPECIFICALLY
CONTROLLED BY AN APPROVED EROSION CONTROL MEASURE, THE PLAN SHALL BE IMMEDIATELY REVISED TO
REFLECT ALL CURRENT, POTENTIAL POLLUTANT LOCATIONS, AS WELL AS SPECIFY ANY ADDITIONAL MEASURES
NECESSARY FOR ASSURANCE OF THE PROPER MAINTENANCE AND APPLICABLE SPILL PREVENTION CONTROL.
SPILL PREVENTION INFORMATION
• ALL FUELING AREAS MUST PROVIDE A MEANSU OF SECONDARY CONTAINMENT IN CASE OF FUEL LEAKS OR SPILLS.
THIS COULD INCLUDE THE USE OF SPILL BUCKETS AND/OR FUEL SPILL MATTING, OR ANY TYPE OF DEVICE THAT
TRAPS AND CONTAINS THE FUEL AND WHICH CAN BE REMOVED FROM THE SITE AND TAKEN TO AN APPROVED
DISPOSAL LOCATION.
• THE CONCRETE WASHOUT AREA MUST BE LOCATED UPSTREAM OF A SEDIMENT TRAP OR BASIN.
• A SILT FENCE OR BERM MUST BE INSTALLED AROUND EACH PORTA-POTTY AND SOLID WASTE DUMPSTER AREA TO
PREVENT AND'OR LIMIT ENVIRONMENTAL IMPACTS.
CONSTRUCTION SEQUENCE:
1. UTILIZE EXISTING PAVED ENTRANCE FOR CONSTRUCTION ENTRANCE.
2. INSTALL SILT FENCE AT LOWER PERIMETER OF BANK SITE.
3. UTILIZE EXISTING PAVED AREAS FOR PARKING, LAYDOWN, EQUIPMENT STORAGE, CONTRACTOR
TRAILER, AND OTHER POLLUTION PROTECTION MEASURES.
4. INSTALL AND MAINTAIN INLET PROTECTION ON EXISTING STORM STRUCTURES.
5. PROTECT EXISTING BIO -FILTER FROM SEDIMENT LADEN RUN-OFF FROM BANK SITE BY ANY
MEANS NECESSARY.
6. RE-ESTABLISH TURF VEGETATION ON ALL DISTURBED, NON -PAVED AREAS.
ESC LEGEND: SOIL DATA
CONSTRUCTION ENTRANCE 8C3 - BRADDOCK CLAY LOAM, 7 TO 15 PERCENT SLOPES,
CE SEVERELY ERODED
3.02 VA E&SC STD. 81 B - THURMONT LOAM, 2 TO 7 PERCENT SLOPES
SILT FENCE 88 - UDORTHENTS,LOAMY
SF
3.05 VA E&SC STD.
IP INLET PROTECTION
3.07 VA E&SC STD.
TO TOP SOILING
3.30 VA E&SC STD.
TS TEMPORARY SEEDING
3.31 VA E&SC STD.
PS PERMANENT SEEDING
3.32 VA E&SC STD.
MU MULCHING
3.35 VA E&SC STD.
!C)
DUST CONTROL
3.39 VA E&SC STD.
PROJECT LIMITS
34,000 SF
(0.78 ACRES)
r�.
,AYLAND 5=4) _- �TE RIM= ?02:82_ AD
- -INV IN= 693.62
INV t`�IJT- _693.52
/ 'r
_.Y
/ 1414 I
�_..__
vo PLUG SILT NCE 061` ! - _ __ ,,, ...
702 SF - - �% / +, - _
- - 70 - w..- -- NEW PRIVATE
-- _
1
I IV{I
-,_ JL
IP CURB INLET -
PROTECTION,
CONSTRUCTION
STAGING AREA
20' ACSA EASEMENT
SILT FENCE,
TYP
SF-- -
0 10` 20'
40'
80' fool
Alan Franklin PE, LLC
Civil and Site Plan Engineering
427 Cranberry Lane Crozet, VA 22932
434-531-5544
alan@alanfranklinpe.com
�;'p\;T H 0r
i
.C)
Alan G. Franklin
Lic. No. 35326 w
1'O ^R!+
.ONAL
Q
Q Z
w �
wU�Z
EL Q �
� > O
U) w
0Wm01
a
2
U
m
ISSUED:
SCALE:
REVISION
SHEET
06-21-18
1R=20
0 15, 30, 60,
V v, !j!� i
;<
TMP 56A2-1-37
Now or Formerly
ANITA D. WASHINGTON
D.B. 604 PG. 094
Zoned: C-1
Comp. Plan: CT 4
Urban Center
Use: Urban
RATIONAL METHOD WORKSHEET Pyojecli Biichwood Place
Date-, 11/2/2006
FROM APPROVED PLANS Designer: AGF
Watershed ID: Post -Development to Bio -Retention
Drainage Area: 3.64 Acres
c -factor: 0,79. (see worksheet)
tc: 5.95 mins. (see worksheet)
Q(2): 14.19 cfs (prior to detention)
Q(10): '18.30 cfs (prior to detention)
Time of Concentration Worksheet Weighted c -factor Worksheet
Overland Flow Time
cove'l
Source: Seelye Chart as modified in VDCT
Drainage Manual (Fig. L Impervious (m
1.6.1.1 on Page 1-13E)
PeNous LanM
Notes:
5.9
1) Length of overland flow always - 200 ft
50
2) Calculate a separate Ta for each ground cover condition along the flow path
Enter Length of Strip (ft)
sample "C" values: ALLOWABLE IMPERVIOUS
383 Enter Slope (% or ft/ 1 00ft)
0.22 Dense 9(assAREA FROM APPROVED PLANS
0x90 Enter Rational Method "C" wlue
t1, 28 Average grass
0, 36 Poor grass
Result Tc (minutes)
0.48 Bare soil
0,90 Pavement
2
TMP 56A2 -3_B-1
T 56A2 -3-B-8
CL
Now or Formerly
Now or Formerly
Q)
FLORENCE D. MASSIE
TMP 56A2 -3-B-7
JONATHAN ORD.B.
335 PG214
Now or Formerly
CAROL
TMP 56A2 -3-B-9
Zoned. R-2
TIVIP 56A2 -1-38A
I WAVERLY H. DAVIS
QUESENBERRY
Now or Formerly
Comp. Plan- CT 1 & 2
Now or Formerly
A W.B. 116 PG. 178
D.B. 1736 PG. 734
I BETSY CLAYTON
Urban Edge
FLORENCE D. MASSIE
Zoned: R-2
Zoned- R-2
DENOME e
Use: Urban
D.B. 420 PG. 077
0 15, 30, 60,
V v, !j!� i
;<
TMP 56A2-1-37
Now or Formerly
ANITA D. WASHINGTON
D.B. 604 PG. 094
Zoned: C-1
Comp. Plan: CT 4
Urban Center
Use: Urban
RATIONAL METHOD WORKSHEET Pyojecli Biichwood Place
Date-, 11/2/2006
FROM APPROVED PLANS Designer: AGF
Watershed ID: Post -Development to Bio -Retention
Drainage Area: 3.64 Acres
c -factor: 0,79. (see worksheet)
tc: 5.95 mins. (see worksheet)
Q(2): 14.19 cfs (prior to detention)
Q(10): '18.30 cfs (prior to detention)
Time of Concentration Worksheet Weighted c -factor Worksheet
Overland Flow Time
cove'l
Source: Seelye Chart as modified in VDCT
Drainage Manual (Fig. L Impervious (m
1.6.1.1 on Page 1-13E)
PeNous LanM
Notes:
5.9
1) Length of overland flow always - 200 ft
50
2) Calculate a separate Ta for each ground cover condition along the flow path
Enter Length of Strip (ft)
sample "C" values: ALLOWABLE IMPERVIOUS
383 Enter Slope (% or ft/ 1 00ft)
0.22 Dense 9(assAREA FROM APPROVED PLANS
0x90 Enter Rational Method "C" wlue
t1, 28 Average grass
0, 36 Poor grass
Result Tc (minutes)
0.48 Bare soil
0,90 Pavement
Shallow Concentrated Flow Time
Source: SCS Velocity Graph as published in Virginia Erosion and
Sediment Control Handbook, Third Edition (Plate 5-2 on Page V-12)
Notes:
1) Not intended for wel(-defined channels - see channel flow caiculation
2) Calculate a separate Tc for each ground cover condition along the flow path
265.00 Enter Length of Flow (ft)
�300 Enter Slope (% orfl/100ft)
1.59 Result Tc (minutes) IF UNPAVED
Result To (minutes) IF PAVED
Pipe Flow Time
Assumes 10 ft1s velocity in pipe
77T-_
Enter Length of Flow in Pipe (ft)
Result To (minutes)
Rainfall Intensity (Albemarle County, Virginia)
5
5.9
5.7
10
5,9
6,4
25
5.9
7.1
50
5.9
77
100
5.9
8.3
Intensities derived from NOAA Atlas -14 Rainfall Precipitation Frequency Data
114
W"R_` SHEET
RA NAME
L, THOD 1: Birchwood Phice
Date: 11/2/2 006
FROM APPROVED PLANS Designer: AGF
Watershed ID: Post -Development bypassing Bio -Retention
Drainage Area: 0.30 Acres
c -factor: 0,50 (see worksheet)
tc: 13.62 mins. (see worksheet)
Q 2), 0.54 ofs
0(10): 0.71 cls
Time of Concentration Worksheet
Overland Flow Time
116
Source: Seelye Chart as modified in VDOT
Drainage Manual (Fig.
1-5.1.1 on Page 1-13E)
4.7
Notes' -
13.6
1) Length of overland flowalways - 200 ft
50
2) Calculate a separate Tc for each ground cover condition along the flow path
50.00 Enter Length of Strip (ft)
Sample "C" values:
0.33 Enter Slope (% or lt/100ft)
0,22 Dense grass
0,28 Enter Rational Method "C" value
0.28 Average grass
0-36 Poor grass
Result Tc (minutes)
0.48 Bete soil
0.90 Pavement
Rainfall Intensity (Albermarle County, Virginia)
5
116
4.2
10
13,6
4.7
25
13.6
5.3
50
13.6
5.7
100
13.6
6-2
Intensities derived from NOAH Atlas -14 Rainfall Precipitation Frequency Data
Weighted c -factor Worksheet
TOTAL POST -DEVELOPMENT RUN-OFj
Q2 =2.41 + 0.54 2.95 cfs
Q10=3.15+0.71 3.86 cfs
DETENTION COMPLIANCE
Project Area (acres)
=
18
(roughly equal to lits of disturbance}
Area Detained (acres)
=
3.6
Percent Capture
=
96%
(should be betvv een 80% arsd 120%)
2
<
CL
CL
Q)
:3
0
0
Remarks
Detained Areas
Post A (Bic*Retention Basi
3,64 1
3,87
1 118.30
1 315
wins to Parrot Creek
Un -detained Areas
Post 8 (Errbankmant Slope)
0.30
nia,
0,71 n/a Drains to Rarrot Creek
x"
Vjc7
<
77
X, xx
pos-
Tv
<
fJ
a"
H,
SWM PLAN ANALYSIS
120' 150,
THE HATCHED AREA REPRESENTS EXISTING AND PROPOSED
IMPERVIOUS AREA TREATED BY THE EXISTING BIO -FILTER AFTER PHASE
1 OF BIRCHWOOD PLACE IN COMPLETE. THE EXISTING BIO -FILTER WAS
DESIGNED TO TREAT 2.70 ACRES OF IMPERVIOUS AREA WITHIN ITS 3.64
ACRE WATERSHED. AFTER COMPLETION OF THE PHASE 1 (UVA CREDIT
UNION) IMPROVEMENTS, THE TOTAL IMPERVIOUS AREA WITHIN THE
BIO -FILTER WATERSHED WILL BE 2.00 ACRES. 0.70 ACRES OF
IMPERVIOUS AREA WILL BE AVAILABLE TO THE PHASE 2, FUTURE MIXED
USE DEVELOPMENT AT THE REAR OF THE SITE, WHICH WOULD BE
ADEQUATE BASED ON THE CURRENTLY APPROVED SITE PLAN.
Alan Franklin PE, LLC
Civil and Site Plan Engineering
427 Cranberry Lane Crozet, VA 22932
434-531-5544
alan@alanfranklinpe.com
efol o
1W
a 7
Alan G. Franklin
Lic. No. 35326
10 4j,
<11
LIS
/0NAL
ISSUED:
SCALE:
REVISIONS:
I SHEET
06-21-18
1 H = 30'1
nommmmmt