Loading...
HomeMy WebLinkAboutWPO201300032 Approval - County 2018-10-03COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project: Plan preparer Owner or rep.: Received date: (Rev. 1) (Rev. 2) (Rev. 3) (Rev. 4) Date of comments: (Rev. 1) (Rev. 2) (Rev. 3) (Rev. 4) Reviewer: VSMP Plan review Amendment Cascadia Blocks 4-7, Final ESC and SWM Plan Amendment Jimmy Taggart, PE; Dustin Greene, EIT—Roudabush, Gale & Associates, Inc. [JTaggart&roudabush.com; dareene&roudabush.com ] 172 S. Pantops Drive, Charlottesville, VA 22911 Cascadia Development LLC [ 170 S. Pantops Drive, Charlottesville, VA 22911 ] Charlie Armstrong (carmstrong(asouthern-development.com ) 24 May 2018 (ref. RMS) 24 Jul 2018 (ref. RMS) 23 Aug 2018 17 Sep 2018 3 Oct 2018 (.PDF) 6 Jul 2018 (email; denied) 24 Jul 2018 (email; denied) 24 Aug 2018 2 Oct 2018 3 Oct 2018 Approved [ESC stabilization plantings or ESC Plan bond required.] John Anderson SWPPP, ESOP, Mitigation Plans not reviewed with this correspondence —NA (SWM Plan Amendment) WP0201300032 —Amendment to: eliminate biofilter #2; construct grass swales; plant steep slopes A. Stormwater Pollution Prevention Plan (SWPPP) —NA B. VSMP: SWPPP: Stormwater Management Plan (WP0201600009) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved. PLEASE NOTE: 383 seedling plants require ESC Plan bond, but given relatively modest bond amount ($2, 006.50; $5/seedling tube + 10% contingency), and since this is the ideal time to plant, Applicant may instead indicate intent to plant 383 seedling tubes to satisfy WPO erosion stabilization requirement. Please notify Albemarle whether Applicant would like to proceed immediately with 383 seedling plantings (within 14-days), or whether Applicant prefers to immediately coordinate ESC Plan bond (incl. bond estimate fee) with Albemarle /CDD (Ana Kilmer). Link to bond estimate request form: hgps://www.google.com/url?q=hgps://www.albemarle.orc/upload/images/forms_center/dgpartrnents/Communi!y Deve lament/forms/bonds/Bond_Request _ to Establish a Bond.pdf&sa=U&ved=0ahUKEwi- 2LfB 1 erdAhUlhOAKHXIWC18OFegEMAA&client=internal-uds- cse&cx=013641561590022973988:g3cwj srdbli&usg=AOvVaw2TI_ArYgA9W1i5GIwselGi Please submit two (2) full-size plan sets with revised date of 10.3.18, with PE -seal, original signature for stamped approval. Submit to CDD, with cover stating, `Not for review, for Approval,' to my Attention. Engineering Review Comments Page 2 of 3 1. SW 1: Delete second paragraph of text in cloud revision block; sentence beginning "Biofilter #2 is being removed with this VSMP Amendment..." Do not edit or replace with similar text; sentence is ambiguous, unnecessary and somewhat confusing. (Rev. 3) Addressed. 2. Copy Erosion Stabilization Area legend from SW 16 to SW13A and SW 15, to clarify that symbol indicates areas of erosion stabilization; recommend lower right-hand corner placement, each sheet. (Rev. 3) Addressed. 3. SW13A: Revise match line sheet reference, or include sheet SW1313. (Rev. 3) Addressed. SW15 4. If biofilter #1 planting plan, dimensions, materials, etc. have changed, include narrative description of design revision to biofilter #1, and enclose with cloud revision. (Rev. 3) Addressed. 5. If culvert B is new with plan Amendment, provide culvert B profile in cloud revision. (Rev. 3) Addressed. Applicant response: `The developer has provided a rip rap channel all the way down to the edge of the creek with a pedestrian bridge.' 6. Since culvert A inlet is a sag low point where grass swale #1 and #2 meet, provide grate inlet, since inlet appears to be flush with point of intersection of these swales (grate inlet design warranted). (Rev. 3) Partially addressed. Applicant response, in part, `...ES-1 has been added to help direct flow into and through culvert A.' As follow-up, ES-1 does not appear to be shown on plans. Provide ES-1 in plan view; add label /leader line. Feel free to contact reviewer, if review error. (Rev. 3) Addressed. 7. Reference to VDOT Al check dam in grass swale profile is misleading. Check dams are constructed above -grade to check flow, while this feature is shown below grade with label reading `toe protection.' If feature is a check dam, revise profile to show check dam rising above level of bottom of swale, immediately downslope of gabion baskets. If this is a subgrade non -erodible measure to prevent scour, revise label, and delete reference to check dam. In either case, provide detail to guide construction, installation, and inspection of this measure (multiple proposed). (Rev. 3) Addressed. Applicant response: `Grass swales #1 and #2 have already been built. We will provide as-builts at the end of the project.' 8. Calculate V2_year, Max, grass swales #1 and #2. Provide and specify soil stabilization blanket, as /if needed. (Rev. 3) Addressed. 9. Retaining wall, Max. Ht. =2' is proposed. Provide retaining wall plan /profile views and detail, including block dimensions, subgrade design, drainage, etc., to guide construction and inspection. (Rev. 3) Addressed. Applicant response: `The developer has graded out the 2' retaining wall. Grass swales #1 and #2 have already been built. We will provide as-builts at the end of the project.' 10. Provide deed book -page reference for `Var. Width Trail, SWM Access & Maintenance, and Stream Buffer Mitigation Easement' shown in Grassed Swale and Outfall detail. (Rev. 3) Not addressed. Provide bk.-pg. reference for recorded easements. Comment response and plan revision reference bk. 4565-pg 413, a recorded SWM Maintenance /BMP Facilities Maintenance Agreement. Easements shown on WPO201300032 were likely recorded with subdivision plat for these blocks. Please provide bk.-pg. reference for plat showing easements for these blocks, as initially requested. (Rev. 3) Addressed. Land Records: BK 4823 /PG 163. it. SWM Maintenance Agreement and Deed of Dedication with Easement plat for grassed swales must be recorded prior to Amendment approval. (Rev. 3) Addressed. 12. Label height of gabion basket in Grass Swale detail. (Rev. 3) Addressed. Applicant response: `Grass swales #1 and #2 have already been built. We will provide as-builts at the end of the project.' 13. Provide gabion basket detail. (Rev. 3) Addressed. Applicant response: `Grass swales #1 and 42 have already been built. We will provide as-builts at the end of the project.' 14. Culvert A profile references detail 6/SW 13 (riprap outlet protection); SW 13 and detail 6 do not appear to be included with Amendment. Provide riprap detail with L X W X D dimensions, as well as class of riprap stone. (Rev. 3) Addressed. Applicant response: `Approved rip rap dimensions have been shown on SW15. We will provide as-builts at the end of the project.' Engineering Review Comments Page 3 of 3 15. Section A -A references 3' weir, swale #2; elsewhere, weir calculation lists weir length = 2'. Please reconcile. (Rev. 3) Addressed. 16. SW 16: Provide bare root seedling or whips quantity (count), at 1,210 per acre. Provide estimate of area to be planted (ft2). (Rev. 3) Partially addressed. As follow-up, SW 16 planting information is inconsistent and incorrect (see photo image, belwT). Table B (and rev. plans) indicate whips at 1,210 per acre. Revised plans indicate 6' x 6' spacing (36 SF grid; this is accurate); plans also reference 400sf spacing, which is inaccurate. Plans propose 61.1 seedlings/whips, which is too few. Revise plant count, per Table B, DCR Riparian Buffer Guidance Manual. SW 16 makes ref. to 24,450 SF Area to be Planted; Mitigation Area Required, 49,742 SF; Mitigation Areas Provided, 51,150 SF. These multiple references are unclear. Recommend call to discuss. Also, please clarif y that Ernst Seed Mix 181 is to be applied to Erosion Stabilization Areas, rather than `provided on slopes.' Clari that Erosion Stabilization Area totals 24,450 SF, if this is the case. Ref. Table B, DCR Riparian Buffer Guide. Please Note: An ESC Plan bond is required, but Applicant may plant 383 seedling plants, as shown on plan sheet SW 16, to avoid bond requirement. Albemarle requests Applicant notify CDD whether plantings will be installed within 14-days, or whether Applicant will post an ESC plan bond for 383 seedling plants. A Mitigation Plan bond is r-eqiiir-ed, but eannot be ealeulated until plan4 eetmt is resolved,Lplans revised, eansistent with Riparian Buffer- Guidance Manual, Table B. Please call if any questions. (Rev. 3) Addressed. 17. SW18: Revise leader line location, Grass Swale #2. (Rev. 3) Addressed. 18. SW 18: Provide cloud revisions for revisions. (Rev. 3) Addressed. C. VSMP: SWPPP: Erosion Control Plan (WP02016-00009) —NA D. Mitigation Plan (WP02016-00009) —NA Process: Easement at BK 4823 /PG 163 appears adequate to cover grass swales #1 and 42. From Land Records: \t rt auP 14-a �sa OPEN SPACE a rRr Ra A25a X 59 y r \�, � t uun�ac Marx ror 7e � � It a uuNt ss arsr Ac �tg \ t ww varnu 7.n srq�� uWEMTrawrcx rai rs '�ey�E' t arssAc 1 , \i Aar 74 a 1Sr AC 0.117 AC ti � 3 . wr a.rsA Ac t a VSMP Plan Amendment is approved. Please feel free to call if any questions. Thank you. 434.296-5832 —x3069 WP0201300032_Cascadia blocks 4-7—VSMP_Amendment 100318rev4 Approval