HomeMy WebLinkAboutSDP201800050 Review Comments Final Site Plan and Comps. 2018-10-05Cameron Langille
From: Alexander Morrison <amorrison@serviceauthority.org>
Sent: Friday, October 05, 2018 7:05 AM
To: Cameron Langille
Subject: Brookhill
Cameron,
I will not be able to attend the meeting this morning. Right now the Block 4 approval is contingent on some water
modeling updates to confirm internal loop water main sizes. The main items that need to be addressed are modeling
with fixed head reservoirs (the report submitted matches the report with pumps so I think they didn't update the runs in
the report) as well as modeling a fire flow of 1,500 GPM with an adjacent node at 750 GPM for a sprinkler system.
Currently they are modeling a fire flow of 2,500 GPM which greatly exceeds the required fire flow.
I am awaiting 1 more signature internally on the Polo Grounds road plan. Once I obtain that I will be able to recommend
approval of that plan.
Road 113 and Ice Rink 3A are under review and comments will be sent shortly. Modeling will need to dictate water main
sizes for these 2 plans.
Let me know if you need anything else.
Alexander J. Morrison, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434-977-4511 Ext. 116
(C) 434-981-5577
(F) 434-979-0698