Loading...
HomeMy WebLinkAboutSDP201600058 Review Comments Final Site Plan and Comps. 2018-10-02County of Albemarle Department of Community Development Memorandum To: Patricia Saternye From: Emily Cox Date: 02 Oct 2018 Subject: Daly's Rent All (SDP201600058) The major site plan amendment for Daly's Rent All has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan must be submitted and approved before final site plan can be approved. 2. Please ensure the professional seal is signed and dated. 3. Topography should at least be visually field verified within in the last year. 4. Provide top and bottom elevations of the retaining wall. 5. Ensure deed book and page are shown for all existing easements (Right-of-way, sanitary, etc). 6. Label the easement around the stormwater facility as, "SWM facility easement". 7. Ensure there is adequate travelway in front of the loading area (show dimension). 8. Parking areas shall not exceed 5% grade anywhere in any direction. Southern parking area exceeds this slope.