HomeMy WebLinkAboutWPO200400091 Plan - E&S Erosion Control Plan 2005-06-13Revlewi ed and Approved by t o CONSTRUCTION OF A SILT FENCEidem. ;eig WIRE SUPPORT) , u (WITHOUT _ + ''> - > ♦ 2. EXCAVATE A 4 x 4 TRENCHcc gnatu co �r 1. SET THE STAKES UPSLOPE ALONG THE LINE OF Co STAKES. C"D co �® iii � ♦,, A MAX �— i - /-_...../ \ —' i -..._i `--_— (� z � iii.. 1 1♦ / / —._- :,�-�—_ CQ 10 4 DA—PRE DA—POST GO ®U % ,' / , 15 Acres. 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT TO STAKES AND EXTEND THE EXCAVATED SOIL. CD DO ® �. i I PLAN VIEW IT INTO THE TRENCH. P L T H g� ,!�:.:,s /. .. , , A �\ , s ' : />` ; . ' � � � - — --- __ /' T — __' •': �-- �CERTIFICATE TM TH Y R. MILLER No. M..".a""..i_ntain constant elevation SECTION SECTION A—A along top of berm. . 'J C J0542 (5 s NAL � Revisions: PARKING EXISTING CHANNEL NN—EL50 NO. DESCRIPTION DATE .::..... PARKING ! ! T, - , , — — — Proposed Pipe III—III—III—I I_I 1-1 I \�\ Comments 4 6 05 i or Ditch FILTER CLOTH KEY IN 6" — 9"; RECOMMENDED FOR ENTIRE PERIMETER FILTER CLOTH. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) 2 Engr Comments 5724/05 NOTES: 3' 1. P, GROUTED RIPRAP, APRON LINING MAY BE RIPRA BASKET, OR CONCRETE. GABION B A A ,.. � B !� 2 d —15 a w ......... a� CD ... OF/7 V Q O Pre Develo went Draina a Divides 2 Post—Develo went Draina a Divides 3 Ener Dissipating Outlet Protection POINT A SHOULD BE HIGHER THAN POINT B. O z 1 of 2 SCALE: 1" = 100' 1�12SCALE: 1° 100' 1�12Not To Scale z DRAINAGEWAY INSTALLATION o (FRONT ELEVATION) Genera Erosion 8c Sediment Centro Notes: TEMPORARY SEEDING SPECIFICATIONS: ES -1: Unless otherwise indicated, all vegetative and structural erosion and sediment control practices 4 Silt Fence Detail February16 through April 30: 9 P Will be constructed and maintained according to the minimum standards and specifications Of the 70 Min � 3" SM -2A Asphalt Existing - - �11 Not To Scale Use Annual R e rass at 60 to 100 lbs acre. Y g Virginia Erosions and Sediment Control Handbook and Virginia regulations VR 625-02-00 1% Slope Pavement Cf) Cn Compacted Soil May 1 through August 31: Use German Millet at 50 lbs/acre. ES -2: The approving authority must be notified one week to the -construction conference a a m 7D plan prior pre September 1 through February 15: p g Y one week prior to the commencement of land disturbing activity, and one week prior to final inspection. 6" 21A Aggregate Base Filter Cloth z oo — T<77 ....... Use a 50/50 Mix of Annual Rye and Winter Rye at 50 to 100 lbs/acre. Existing SECTION VIEW ............................... Flow o v Grade PERMANENT SEEDING SPECIFICATIONS: ES -3: All erosions and sediment control measures are to be placed prior to or as a first step in the Existing � February 16 through April 30: Kentucky 31 Fescue — 128 lbs/acre; Red Top Grass Crownvetch when slopes are greater than 3: 1.CD 2 lbs/acre; Annual Rye 20 lbs/acre. Add 20 lbs/acre clearing. P vement , c 4.5' MIN May 1 through August 15: Kentucky31 Fescue — 128 lbs acre; Red To Grass — P 3:1. 2 lbs acre; Foxtail Millet 20 lbs acre. Add 20 lbs acre — / i ES -4: A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. f * ust extend full 7 Tem or Diversion Dike � Q °J N Crownvetch when slopes are greater than width of ingress PLAN VIEW 1 of 2 Not To Scale o Cn August 16 through October 31: ES -5: Prior to commencing land disturbing activities in areas other than indicated on these plans and egress operation Kentucky 31 Fescue — 128 lbs/acre; Red Top Grass — Crownvetch when slopes are greater than 3:1. 2 lbs/acre; Annual Rye — 20 Ibs/acre. Add 20 lbs/acre (including but not limited to, off—site barrow or waste areas) the contractor shall submlt a NOTE: A minimum water tap of 1" must be installed with a minimum 1" 0 o d supplementary oscop approval ltar erosion control plan t0 the owner for review and a l b ' the lin authority. y plan approving auy ballcock shutoff valve supplying a wash hose with a diameter of 1.5" for adequate constant Wash waster must be carried away from the paved WIRE SCREEN CONCRETE BLOCK November 1 through February 15: pressure. Kentucky 31 Fescue — 128 lbs/acre; Red Top Grass — 2 lbs/acre; Winter Rye — 20 lbs/acre. Add 20 lbs/acre construction entrance to an approved settling area to remove sediment. All Crownvetch when slopes are greater than 3:1. ES -6: The contractor IS responsible for installation of any additional erosion control measures as sediment shall be prevented from entering storm drains, ditches, or watercourses. MULCHING SPECIFICATIONS: necessary to prevent erosion and sedimentation as determined by the plan approving authority. Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. ES -7: All disturbed areas are to drain to approved sediment control measures at all times during land r6 Paved Construction Entrance disturbing activities and during site development until final stabilization is achieved. 1 of 2 Not To Scale ES -8: During dewater'Ing operations, water will be pumped into an approved filtering device. -- CD ELEV = 564.5 ES -9: The contractor shall inspect all erosion control measures periodically and after each _-- *GRAVEL FILTER DESGIN HIGH WATER (25 -YR. STORM ELEV.) runoff -producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the _ __ — _ - --"^ T 563.3 erasion control devices shall be madeimmediate) y 74 CD, EMERGENCY SPILLWAY 0.5' DRY STORAGEELEV ELEV: 563.0 WEIR CREST = 561. 90 Erosion Notes: 1) All Entrances except the approved construction entrance shall be blocked In such a manner as t0 ��c WIRE SCREEN RUNOFF WATER FILTERED WATER WITH SEDIMENT OVERFLOW VOLUME = 495 cu ds Y DEWATERING not allow access t0 the site.E="WET STORAGE DEVICE II=III III—III-111=III III -11 W VOLUME = 495 cu yds ELEV = 559.30 Inv = 557.0 2) The developer shall reserve the right to install, maintain, remove and/or convert to permanent SITE DROP INLET GRATE SEDIMENT CLEANOUT POINT structure all erosion and sediment control measures required by this plan regardless of the sale of any o�D RD SEDIMENT WITH ELEVATION = 557.5 15—24%RGP�^@ 2.0% �Invlot. . R SPECIFIC APPLICATION C—) BOTTOM ELEV: 555.0 1 P C W/FES RTE 250 q THIS METHOD OF INLET PROTECTION IS APPLICABLE P 3) A video camera Inspection is required for all storm sewers and culverts that are deemed inaccessible WHERE HEAVY FLOWS ARE EXPECTED, AND WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT r5_TeMporary TemporarySediment Basin Detail t0 VDOT Inspections and are to be accepted Into VDOT's maintenance and program and Ownership. The EXCESSIVE PONDING AROUND THE STRUCTURE. 1 of 2 Not To sale video inspection shall be conducted in accordance with VDOT's video 'inspection procedure and with a VICINITY MAP *GRAVEL SHALL BE VDOT #3, #357, OR #5 COARSE AGGREGATE. Sheet N0: VDOT and/or county Inspector present. In addition, If high-density polyethylene (HDPE) pipe or pipe system, the contractor and a representative from the pipe manufacturer should hold apre-construction " = 2000 SCALE: 1 ' 8 Block and Gravel Inlet Protection' meeting for installation. 1 of 2 Not To Scale. J11: 70' EROSION NOTES 1. All entrances except for the approved construction entrance shall be blocked in such a manner as to not allow entrance to the site. 2. Due to recent grading activity on Parcel 49C, additional erosion measures may be required in the southwest corner of this project. 3. Contractor shall be responsible for disposing of all debris removed from this site in an approval disposal facility. SEQUENCE OF CONSTRUCTION 1. No Clearing or grubbing of the site, other than that necessary for installation of the sediment basin, diversion dikes, and silt fence, shall be allowed until the County's Erosion Control Inspector has determined that perimeter sediment control measures are properly installed. The diversion dike and silt fence shall not be breached, removed, relocated or otherwise disturbed without the permission of the County's Erosion Control Inspector. 2. Install Sediment Basin per phase I detail. 3. Install remaining erosion control measures. 4. Upon adequate stabilization of the building and parking areas not affected by the sediment basin, the basin may be backfilled as shown on this sheet. 5. The parking lot adjacnet to the sediment basin may be completed at this time. 6. After County Inpsector has determined that site has been stabilized the Sediment Basin shall be converted to a BMP facility and the water quality swale may be installed at this time. �co cc co W co co z CD 6 W CQ CD ^J •N O Q) E y] C 0 CDL CID U TH OF TIMOTHY R. MILLER n CERTIFICATE No. 30542 o�FSs/ONAL Revisions: NO. DESCRIPTION DATE 1 En r Comments 4/6/07 2 Enqr Comments 5/24/0 N W � a CNQ o � z O z U � UnUn � ::503 _-D >. m CO -p N � � U N U O CD CC V) Q ai N � C/J 0� Q O O r�rT y� 77v,, 4J W Q U N r r�- n Sheet No: