HomeMy WebLinkAboutSDP198300041 Plan - Approved 1984-06-05R111rl Y` t`rl
74( OF ALSIZ41�1
ARG
DEPARTMENT of PLANNING and COMMUNITY DEVELOPMENT
401 McIntire Road
Charlottesville, Va. 22901-4696
804 296-8823
September 27, 1983
County West Limited Partnership
P. O. Box 2424
Charlottesville, VA 22902
RE: I.B.M. Office Building Site Plan
(TM 60, part of parcel 47)
Dear Sirs:
The Albemarle County Planning Commission, at its meeting on September 27,
1983, approved the above noted site plan subject to the following conditions:
1. A building permit will not be issued until the following conditions
have been met:
a. Virginia Department of Highways & Transportation entrance
permit;
b. County Engineer approval of stormwater detention plans and
grading and drainage plans, including analysis of downstream
drainage structures under Rt -250 and the railroad;
C. Soil erosion and sedimentation permit;
d. Plat to be recorded showing Virginia Department of Highways
and Transportation drainage easement;
e. Final Service Authority approval of water and sewer connections.
2. A certificate of occupancy will not be issued until the following
condition have been met:
a. Final Fire Officer approval.
In order to expedite the completion of the above items, please have
the appropriate agency or department notify Linda Thompson (296-5832)
in the Inspections Department, in writing, that the applicable con-
ditions have been met.
County West Limited. Partnership
page 2
Please note that the Zoning Ordinance requires that construction be
commenced within eighteen (18) months of the date of approval or the.
approval will be void.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Mary Joy Scala
Planner
MJS/jcw
cc: Planning staff
Mr. Timothy Lindstrom
Mr. Robert Vaughn
Mr. Richard Shank
Mr. Dan Roosevelt (Rt. 601)
Mr. Maynard Elrod
Mr. Lou Rossi
Mr. Ira Cortez
/,-
MULWFAMILY
STAR%IfI&a
PLAN~ _
is aubdduringdinWit
approval. of c ty enq i nee r
and VDH 8kT
edge of existing pavements
G
paved ditch 'approxomteay 1 $5ofron proposed* urb/gutter) �.
2 ,.♦ r ew povemero; aqg ego e bow no.
'v 2" of bltucr-indu sus `rete f
`�--/ ofYDH 19�e o!'Fr
t>Y
�. raino a
10 dedicated d g
easement
END WALL'
VDH aT tio• 44 sib
561.5 at inlet on, pooftio
�MIIMFF� 1w�M. � s iy R.
virgtn ne. Index
r
le c Q u n I situ' plan
t,
f
2 foundation plan
1 �c o ule 3 first floor plan
4 second finer plan
PARCEL 52
8x8 M.J. tee o
5. roof plan, f finish, door schedule
6 exterior, elevations
7 .exterior elevations
y *:
8 building section, stair sections
9 wail sections
10 wall sect ions, det4.i 1 s
11 stair, elevator sections
`� rf 12 restroom elevations, fixtures.
Sl second floor framing
l ` S2 roof framing
El f irst and second f loor electrical
Mi -IMS mechanical, plumbing layout
vicinity
PARCEL C. 53
existing 1.814c ve t O%NER
OHN Yet HLILV'EY
CHARLES N 04OLVEY
new 18ipE� MARQRE-f +4 WRIGHT
e RV SINGLE FA M s1 Y
.%.
neer drop inlet typ D! 3A
top 4.0
env 57 t�'S-._
- point -A- to be 4- o.aove point b .
1
SATE SIZE 1.89ACRE 100%
Ai fl$ rViUn _mQ ArnC tRO,.
tv
i.,
';'fir' x .:I �'�•`;•�
stamp
richord shank
associates,pc. F#
architects ,
5I0 east main street
chariot esviIle, virg nia
22901 804-295-0131
Al
x
IBM office buifdVhg
2400 old ivy road
c-harlottes0l+e, vi rginia
rw
commission•L ;f4 -1r" y `•l�
All ROVED
AMWTRATIVELY
�iti�'�fI dtl�-�aa rle
x,
FEBRUARY 28,1984
DECEMBER 2 J983
NOVEMBER 14,1983
SEPTEMBER 14,`83
revisions AUGUST 31, 1963
kvv�d
�..�
/illt,4 , V*_*tl_"�•
ti
• i
F
i
,date: At2st 16,16, 1983
site plan