Loading...
HomeMy WebLinkAboutWPO201800011 Action Letter 2018-10-16AML Co W1bnt! Notice to amply ❑ MP WorkEJ eondhap❑ RPUnder SWO ❑ Re4nspecftn iliae) ❑ SWPPP INSPECTION Project Name: j f4 7-r ,r A I / 1 _ File Number. o DEG General Permit NumberYAJUOLOX G=* Inspector. Pry Inspection Date: -5 I Time: Fbr W®mings or Notices, DATE TO COI i1PL Y BY Initial controls ❑ Clearhg ❑ Rough Grading Construction ❑ Finish Grading ❑ SUblbation ❑ own conversion r- N. I (omfl 9nf sANOetes Posting at the The coverage letter and SWPPP book location must be posted in a prominent place at ' site entrance the entrance to the jolt site, available to the public on request. SWPPP The complete document must be available for Inspection on -she available for review Coverage A current coverage letter (expiration date of 2019) must be included letter I V/j Registration V1'j A registration statement must be Included that goes with the coverage letter. The Statement I acreage disturbed must be accurate. PPP plan A copy of the pollution prevention plan and a copy of the current DEQ permit code must be Included in the SWPPP. The plan must be marked to show location of measures. lnspec ion Reports must be up-to-date, informative, documenting problems, and occurring at reports required intervals. Rain events and Inspections for rain events must be noted. Inspects orre reporw,AA es Pf inspections must be followed up with corrective actions where necessary station Washouts Trash debris Erosion and Sediment Control and Stormwater Management Per plans and Standards must A lined sump area must be provide paint, grouts, etc. are also needed. and spill prevention and cleanup kits in any concrete washout. Washout Trash and debris must be cleaned up so that It does not leave the job site. Any contaminates must be protected from becoming runoff during rains (cover dumpsters). Trash is not to be buried on:ske. from inlets. must be and away Compliant EJ Notice to Comply E Stop Work E] Bond Insp L: Warning EJ Under JVTC Under SWO ED Re -inspection (fee) Erosion Control Inspection Report Project Name: old T/bq' BP Number: \)v P69 �0/traqip Location Contractor L a County Inspector: Inspection Date: Lot# For Wamings or Notices, DATE TO COMPLY BY _Agreement # Initial controls [:] Clearing LJ Rough Grading Construction Finish Grading ❑ Stabilization E] swm conversion El A I F VIEW- -NE Silt, safety, tree fence 'Diversions,_ -__ Berms, ditches j Inlet, culvert protection Stream work, -cr.Oss1q9s Traps, Basins Stabilization Entrances Disposal Disposal Sanitary Waste Storage "§wP—P 15 Compliance Permit t - — - Posting