HomeMy WebLinkAboutCLE201800155 Certified Engineer's Report 2018-10-23 (2)AI,h�,1
�IRGIN�P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
MEMORANDUM
TO: Zoning Clearance or Home Occupation Applicant
FROM: Zoning Division
RE: Request for Approval of Letter of Performance Standards or
Certified Engineer's Report
Proposed Business/Use: T)ECi
rs�6�v L' gu•2 VtYvT1rt-Sac
Address: _�� C� _64,14'D" 11 S T. C A,(tZ p77j-SV1U_,(VR Z21)01-Z
Re CLE (Zoning Clearance Number): �
HO (Home Occupation Number):
Contact Person: /�'�Af7 YU-6 TDN1
Phone Number: Z � 90(�
Fax Number:
Date Faxed to Applicant:
Please return this form along with all required documentation to the Zoning Division upon
completion.
Thank you.
To be completed by staff:
Approved:
Comments:
CER Packet Revised 2/11/09
Certified Engineer's Reports
According to Zoning Ordinance section 18-4.14.8, Albemarle County requires a
certified engineer's report prior to issuing a zoning compliance clearance or
home occupation permit for uses of an industrial character. The certified
engineer's report must be reviewed by the County Engineer (or designee).
A certified engineers report shall consist of;
Type 1: For uses which will have no discharge, noise, vibration, smell, lighting,
emissions, impulses or radiation beyond a normal office or residential use,
and will not store any hazardous materials, a letter from the owner with the
following information will suffice as a certified engineer's report;
1. a description of the business and the physical process involved.
2. a description of any machinery and operations.
3. a statement or explanation for meeting each of the performance
standards of section 18-4.14; noise, vibration, glare, air pollution, water
pollution, radioactivity, electrical interference.
Examples of type 1 uses might be offices or warehouse storage of clothes or
home occupations for wood workers. An example letter is available.
Type 2: For uses which will have any discharge, noise, vibration, smell, lighting,
emission, impulse or radiation which might reasonable be expected to exceed
the performance standards of 18-4.14.4 at any time, or which have any permit
requirements from DEQ, EPA, Health Department or other local, state or
federal agency, a full certified engineers report is required. This report must
contain a signed and dated seal from a professional engineer. It must contain
copies of any local, state or federal permits. It must contain plans and
descriptions of physical and operational measures to meet all of the
performance standards, with actual supporting measurements and data
where applicable. Examples of type 2 uses might be a contractor's office and
storage yard or equipment repair shop, or a manufacturer of electrical
components.
CER Packet Revised 2/11/09