Loading...
HomeMy WebLinkAboutSP201600022 Action Letter Special Use Permit 2012-09-14 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 • Fax(434)972-4126 September 14, 2012 • Paul Huddleston 1 Boars Head Pointe, Suite 123 Charlottesville,Va. 22903 RE: SP201200009 Southwood Boys & Girls Club Expansion TAX MAP/PARCEL: 090A10000001 D0 Dear Mr. Huddleston: • On September 5, 2012, the Albemarle County Board of Supervisors took action on SP #201200009 to allow the expansion of the existing Community Center on approximately 1 acre on the above noted Tax Map Parcel number in the Scottsville District. This special use permit was approved based on the following conditions: 1. Development shall be in general accord with the concept plan titled Southwood Boys and Girls Club Expansion, dated April 13, 2012 (hereafter"Concept Plan"), as determined by the pirector of Planning and the Zoning Administrator. To be in general accord with the Concept Plan, the proposed building and existing building renovation - and use shall reflect the following major elements within the site essential to the design of the site, as shown on the Concept Plan: • Location of buildings, uses, and structures, inclusive of the minimum setback for the new structure from Bitternut Lane must be fifteen (15)feet; • Location of parking areas; and • • , Location.of outdoor play area Minor modifications to the plan which do not conflict with the elements above may be made to ensure compliance with the Zoning Ordinance; and 2. The parking study is based on a maximum of one hundred twenty (120) children. There shall be no more than one hundred twenty (120) children at any one time served at this location.of the Boys and Girls Club. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: 0 • compliance with conditions of the SPECIAL USE PERMIT; • approval of and compliance with a SITE PLAN amendment; and • approval_of a ZONING COMPLIANCE CLEARANCE. • In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty-four(24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above-noted action, please do not hesitate to contact Rebecca Ragsdale at 296-5832. Sincerely, ZVeri-21A45 David Benish Chief of Planning Services Email CC: Rebecca Ragsdale File