Loading...
HomeMy WebLinkAboutSP201600021 Review Comments Special Use Permit 2017-02-08Short Review Comments Report for: SP201600021 SubApplication Type: Tommy Shull's Wrecker & Repair New Special Use Permit Date Completed:09/26/2016 Reviewer:Francis MacCall CDD Admin Zoning Review Review Status:QC OK Reviews Comments: Division: Date Completed:11/14/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments:Applicant's engineer informed me that community meeting notices were sent out on 10/12 to all of the addresses included in the notification spreadsheet. The community meeting will be held on 10/26 at 6pm at the Monticello Fire Station. Division: Date Completed:10/20/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments: Division: Date Completed:10/26/2016 Reviewer:Amelia McCulley CDD Zoning Review Status:Requested Changes Reviews Comments: Division: Date Completed:10/12/2016 Reviewer:Matthew Wentland CDD Engineering Review Status:No Objection Reviews Comments: Division: Date Completed:10/18/2016 Reviewer:Adam Moore VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:11/08/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:See Recommendations Reviews Comments:At its November 7, 2016 meeting, the ARB recommended no objection to the Special Use Permit with the following conditions: 1. Replace the chain link fence and gate with a solid fence and gate. Provide details of the design on the plan for review. 2. Indicate on the plan the maximum height of parts storage. Heights taller than a standard automobile would not be appropriate. 3. Add evergreen trees along the north/northeastern property line to help screen the vehicles awaiting repair. Division: Date Completed:11/14/2016 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Division: Page:1 of 2 County of Albemarle Printed On:October 31, 2018 Review Status:No Objection Reviews Comments:Based on SP dated 9/15/16. No comments or objections. Date Completed:11/14/2016 Reviewer:Alexander Morrison ACSA Review Status:No Objection Reviews Comments: Division: Date Completed:12/13/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Planning Commission Approval Reviews Comments: Division: Date Completed:02/08/2017 Reviewer:Johnathan Newberry CDD Planning Review Status:Approved Reviews Comments:Approved by the Board of Supervisors. Division: Page:2 of 2 County of Albemarle Printed On:October 31, 2018 fir✓ of V 57 f� N 679) COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 December 5, 2016 Clint Shifflett, P.E. Timmons Group 608 Preston Avenue, Ste. 200 Charlottesville,VA 22911 clint.shifflett@timmons.com RE: SP201600021 Tommy Shulls Wrecker and Repair Dear Clint: County and State staff have reviewed the initial submittal for the request to establish an "Automobile, truck repair shop" use as permitted under Section 26.2 "General commercial use" [via Section 24.2.1(2)] on Tax Map and Parcel number 09000-00-00-035Q0. Available comments from each reviewer are provided below or attached to this letter. A public hearing date has been scheduled with the Planning Commission meeting on September 13, 2016 at 6pm. However,there are some outstanding comments that should be addressed as soon as possible. Planning The meeting held on October 26th at the Monticello Fire Rescue Station satisfied the requirements for a community meeting as described in Section 33.4 of the Zoning Ordinance. Initial comments on how your proposal generally relates to the Comprehensive Plan are provided below. Additional comments on conformity with the Comprehensive Plan will be provided to the Planning Commission and Board of Supervisors as part of the staff report. Comprehensive Plan This parcel is located in Neighborhood 4 of the Southern and Western Neighborhoods Master Plan and is designated for"Office/R&D/Flex/Light Industrial" uses. More specifically, it is located within the "area between Rt. 20 South and Avon Street Extended," which is considered a "priority area" as discussed on page 68 of the master plan.This area aims to provide for light industrial uses and employment. 1 1/400, Because automobile repair is considered a commercial use under the Zoning Ordinance, this proposal falls within the "secondary land use" category of this designation (see page 34 of the S+W Master Plan).This means the proposal will be considered consistent with the Comprehensive Plan to the extent that it is compatible with nearby and adjoining uses. At the proposed scale, staff believes this proposal is consistent with the Comprehensive Plan. Neighborhood Model Projects located within the Development Areas are typically reviewed for consistency with each of the Neighborhood Model Principles found in the Comprehensive Plan (see Objective 2 in the Development Areas chapter). A preliminary analysis of particularly relevant principles is provided below: Principle 2—Mixture of Uses There is a recognized shortage of land zoned Light Industry (LI) in the County. In 2013, the Board adopted new regulations in the Zoning Ordinance to protect industrially- zoned land.These provisions aimed to prevent offices and commercial uses from occupying land that could otherwise serve industrial users. Although this proposal is considered a commercial use, it will operate concurrently with an existing industrial use. By creating a mixture of uses,there can be more efficient use of the land, which supports other land use goals such as relieving pressure to develop land outside of the Development Area. Principle 10—Redevelopment No significant development is included in this proposal, but "redevelopment"can also be viewed as the overall maximization of a site's potential. Allowing automobile repair as an additional use on the property will increase the utilization of existing development and infrastructure within the Development Areas. As stated in this section of the Comprehensive Plan on page 8.24, care must be given to ensure that the additional use will complement rather than distract from other existing nearby uses. The Planning Division also comments on the conceptual plan and other requirements of County Code. These comments are provided below. Conceptual Plan As we've discussed,to be as efficient as possible,we can aim to use the same plan to serve as the conceptual plan for the special use permit and the letter of revision for the site plan amendment. With this in mind, here are some comments and questions that need to be addressed prior to a public hearing with the Planning Commission.These comments are based on the plan dated 9-15-16, last revised 11-4-16 per County Comments: 1. Section 4.12.16(e)—Please provide bumper blocks for the customer and employee parking against the building or provide an equivalent measure. 2. Section 4.12.19(c)—Are you planning to provide an enclosure for the dumpster? If so, we'll need to confirm it is exempt from the rear setbacks as provided in Section 4.20(b). 3. Section 5.1.31—Thanks for your preliminary comment response letter based on comments from the Zoning Administrator. We will need her feedback on your 2 `411S 'tiro" comments as soon as possible, especially with regard to the parts storage at the back of the site. 4. Section 35.2.2—Please provide a parking schedule for all of the proposed uses on the site. 5. Section 32.7.9.6—Please provide dimensions and show the limits of the mulched planting bed containing the two Burford Holly plantings. 6. Section 32.7.9.8—Please provide a canopy schedule to confirm compliance with this section. Engineering—Matt Wentland,434-296-5832,ext. 3458, mwentland@albemarle.org No objection. VDOT—Adam Moore, adam.moore@vdot.virginia.gov Please see attached comments. Fire/Rescue—Robbie Gilmer,434-296-5833, rgilmer@albemarle.org No objection. Entrance Corridor—Margaret Maliszewski, 296-5832,ext. 3276, MMaliszewski@albemarle.org Comments were provided in conjunction with the ARB meeting on November 7th. Zoning—Amelia McCulley,434-296-5832,ext. 3229,amcculle@albemarle.org Please see attached comments. Inspections—Jay Schlothauer,434-296-5832,ext. 3228, ischloth@albemarle.org No objection. Action after Receipt of Comments After you have read this letter, please take one of the actions identified on "Action After Receipt of Comment Letter"which is attached. Resubmittal If you choose to resubmit, please use the attached form as a coversheet.There is no fee for the first resubmittal. Notification and Advertisement Fees Prior to scheduling a public hearing with the Planning Commission, payment of the following fees for newspaper advertisements and notification of adjoining owners are required: $121.00= Cost for newspaper advertisement $215.00 Cost for notification of adjoining owners (minimum $200+actual postage/$1 per owner after 50 adjoining owners) $336.00 Total amount due prior to Planning Commission public hearing 3 1/41.010H 11411I) Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing is needed: $121.00=Cost for newspaper advertisement $121.00 Additional amount due prior to Board of Supervisors public hearing $457.00 Total amount for all notifications Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Feel free to contact me if you have questions. I can be reached at inewberry@albemarle.org or 434-296-5832, ext. 3270. Sincerely, a .4 • rkitmAP4/750"' CC: Tommy Shull shullstowing@gmail.com J.T. Newberry Senior Planner Enclosed: Action After Receipt of Comment Letter Planning Division Resubmittal Form Zoning Division Comments Inspections Division Comments 4 DEPARTMENT OF COMMUNITY DEVELOPMENT pF A ,70111 Oft ��RGIN�P ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the top of your materials. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter,you need to request an indefinite deferral. Please provide a written request and state your justification for requesting the deferral. (Indefinite deferral means that you intend to resubmit/request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. After outstanding issues have been resolved and/or when you are ready to request a public hearing, staff will set your public hearing date for the Planning Commission in accordance with the Planning Commission's published schedule and as mutually agreed by you and the County. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date. 5 (WO 4410) By no later than twenty-one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment letter will contain the actual fees you need to pay. Payment for an additional newspaper advertisement is also required twenty-two (22) days prior to the Board of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Public Hearings form. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time,you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is made within 10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees may be paid in cash or by check and must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. 6 ,r.r- r► Sol *ftiol Johnathan Newberry From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Monday, November 14, 2016 10:53 AM To: Johnathan Newberry Subject: SP201600021:Tommy Shull's Wrecker& Repair JT, I have reviewed the above referenced special use permit and have no comments. I hereby recommend approval of SP201600021. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 1 ;7-111 Qit y2 ®�� 1 r t (f v1,I COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 December 5, 2016 Clint Shifflett, P.E. Timmons Group 608 Preston Avenue, Ste. 200 Charlottesville, VA 22911 clint.shifflett@timmons.com RE: SP201600021 Tommy Shulls Wrecker and Repair Dear Clint: County and State staff have reviewed the initial submittal for the request to establish an "Automobile, truck repair shop" use as permitted under Section 26.2 "General commercial use" [via Section 24.2.1(2)] on Tax Map and Parcel number 09000-00-00-035Q0. Available comments from each reviewer are provided below or attached to this letter. A public hearing date has been scheduled with the Planning Commission meeting on September 13, 2016 at 6pm. However, there are some outstanding comments that should be addressed as soon as possible. Planning The meeting held on October 26th at the Monticello Fire Rescue Station satisfied the requirements for a community meeting as described in Section 33.4 of the Zoning Ordinance. Initial comments on how your proposal generally relates to the Comprehensive Plan are provided below. Additional comments on conformity with the Comprehensive Plan will be provided to the Planning Commission and Board of Supervisors as part of the staff report. Comprehensive Plan This parcel is located in Neighborhood 4 of the Southern and Western Neighborhoods Master Plan and is designated for "Office/R&D/Flex/Light Industrial" uses. More specifically, it is located within the "area between Rt. 20 South and Avon Street Extended," which is considered a "priority area" as discussed on page 68 of the master plan. This area aims to provide for light industrial uses and employment. 1 arr %lee *111009 Because automobile repair is considered a commercial use under the Zoning Ordinance, this proposal falls within the "secondary land use" category of this designation (see page 34 of the S+W Master Plan).This means the proposal will be considered consistent with the Comprehensive Plan to the extent that it is compatible with nearby and adjoining uses. At the proposed scale, staff believes this proposal is consistent with the Comprehensive Plan. Neighborhood Model Projects located within the Development Areas are typically reviewed for consistency with each of the Neighborhood Model Principles found in the Comprehensive Plan (see Objective 2 in the Development Areas chapter). A preliminary analysis of particularly relevant principles is provided below: Principle 2—Mixture of Uses There is a recognized shortage of land zoned Light Industry (LI) in the County. In 2013, the Board adopted new regulations in the Zoning Ordinance to protect industrially- zoned land.These provisions aimed to prevent offices and commercial uses from occupying land that could otherwise serve industrial users. r ntl with considered a commercial use, it will operateconcurrently proposal is concur Although this p ro p an existing industrial use. By creating a mixture of uses, there can be more efficient use of the land, which supports other land use goals such as relieving pressure to develop land outside of the Development Area. Principle 10—Redevelopment No significant development is included in this proposal, but "redevelopment" can also be viewed as the overall maximization of a site's potential. Allowing automobile repair as an additional use on the property will increase the utilization of existing development and infrastructure within the Development Areas. As stated in this section of the Comprehensive Plan on page 8.24, care must be given to ensure that the additional use will complement rather than distract from other existing nearby uses. The Planning Division also comments on the conceptual plan and other requirements of County Code. These comments are provided below. Conceptual Plan As we've discussed, to be as efficient as possible,we can aim to use the same plan to serve as the conceptual plan for the special use permit and the letter of revision for the site plan amendment. With this in mind, here are some comments and questions that need to be addressed prior to a public hearing with the Planning Commission.These comments are based on the plan dated 9-15-16, last revised 11-4-16 per County Comments: 1. Section 4.12.16(e)— Please provide bumper blocks for the customer and employee parking against the building or provide an equivalent measure. 2. Section 4.12.19(c)—Are you planning to provide an enclosure for the dumpster? If so, we'll need to confirm it is exempt from the rear setbacks as provided in Section 4.20(b). 3. Section 5.1.31—Thanks for your preliminary comment response letter based on comments from the Zoning Administrator. We will need her feedback on your 2 comments as soon as possible, especially with regard to the parts storage at the back of the site. 4. Section 35.2.2—Please provide a parking schedule for all of the proposed uses on the site. 5. Section 32.7.9.6—Please provide dimensions and show the limits of the mulched planting bed containing the two Burford Holly plantings. 6. Section 32.7.9.8—Please provide a canopy schedule to confirm compliance with this section. Engineering— Matt Wentland,434-296-5832, ext. 3458, mwentland@albemarle.org No objection. VDOT—Adam Moore, adam.moore@vdot.virginia.gov Please see attached comments. Fire/Rescue— Robbie Gilmer, 434-296-5833, rgilmer@albemarle.org No objection. Entrance Corridor—Margaret Maliszewski, 296-5832, ext. 3276, MMaliszewski@albemarle.org Comments were provided in conjunction with the ARB meeting on November 7th Zoning—Amelia McCulley, 434-296-5832, ext. 3229, amcculle@albemarle.org Please see attached comments. Inspections—Jay Schlothauer, 434-296-5832,ext. 3228, ischloth@albemarle.org No objection. Action after Receipt of Comments After you have read this letter, please take one of the actions identified on "Action After Receipt of Comment Letter" which is attached. Resubmittal If you choose to resubmit, please use the attached form as a coversheet. There is no fee for the first resubmittal. Notification and Advertisement Fees Prior to scheduling a public hearing with the Planning Commission, payment of the following fees for newspaper advertisements and notification of adjoining owners are required: $121.00= Cost for newspaper advertisement $215.00 Cost for notification of adjoining owners (minimum $200+ actual postage/$1 per owner after 50 adjoining owners) $336.00 Total amount due prior to Planning Commission public hearing 3 'fir' Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing is needed: $121.00= Cost for newspaper advertisement $121.00 Additional amount due prior to Board of Supervisors public hearing $457.00 Total amount for all notifications Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Feel free to contact me if you have questions. I can be reached at inewberry@albemarle.org or 434-296-5832, ext. 3270. Sincerely, a .4 rksow-(6-7-. CC: Tommy Shull shullstowing@gmail.com J.T. Newberry Senior Planner Enclosed: Action After Receipt of Comment Letter Planning Division Resubmittal Form Zoning Division Comments Inspections Division Comments 4 4 -0,. DEPARTMENT OF COMMUNITY DEVELOPMENT of AL4v, 40 ih T 11641r. ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the top of your materials. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter, you need to request an indefinite deferral. Please provide a written request and state your justification for requesting the deferral. (Indefinite deferral means that you intend to resubmit/request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. After outstanding issues have been resolved and/or when you are ready to request a public hearing, staff will set your public hearing date for the Planning Commission in accordance with the Planning Commission's published schedule and as mutually agreed by you and the County. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date. 5 • rr+ By no later than twenty-one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment letter will contain the actual fees you need to pay. Payment for an additional newspaper advertisement is also required twenty-two (22) days prior to the Board of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Public Hearings form. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is made within 10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees may be paid in cash or by check and must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. 6 Johnathan Newberry From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Monday, November 14, 2016 10:53 AM To: Johnathan Newberry Subject: SP201600021:Tommy Shull's Wrecker& Repair JT, I have reviewed the above referenced special use permit and have no comments. I hereby recommend approval of SP201600021. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 1 Q C/®-,:m 'VW" County of Albemarle Department of Community Development Memorandum To: J.T. Newberry, Senior Planner From: Amelia G. McCulley, Zoning Administrator Date: October 26, 2016 Subject: SP 2016-021 Shull's Auto Repair (initial submittal) I have reviewed the initial submittal and have the following comments: 1. Please ask the applicant to address the criteria from Zoning Ordinance §26.3 relating to guidelines for a special use permit in an industrial district. 2. Please ask the applicant to review the performance standards within §5.1.31. a. §5.1.31 (a) requires all parts, materials and equipment to be located within an enclosed building. The proposed plan shows temporary part storage in the rear of the property. b. §5.1.31 (b) requires that vehicles awaiting repair not be visible from the adjoining residential district. If this standard cannot be met, the applicant should either find a means to address it or submit a special exception to be processed with the special use permit. An assessment will need to be made as to whether the property to the rear is adequately screened. If not, it may be necessary to obtain an easement on the adjoining property to provide sufficient screening. 3. Please explain the diagonal hatching on the rear vehicle storage area. 4. Please explain the reference to the secondary garage door. Isn't this door discontinued because it's in conflict with parking and the exhaust vent? 5. Prior to this use beginning, the engineer's report must address all aspects of the body shop work as well as the mechanical repairs. A paint booth typically requires DEQ approval. 6. The applicant is advised to follow-up on inspections and any other outstanding information relating to the building permit for creating an indoor paint spray room. I can find no record of inspections since the preliminary zoning inspection in August. (B2016-1505AC). 7. The applicant is advised to follow-up on any outstanding information relating to the zoning clearance application. It appears to still be pending. (CLE2015-0157). For the current towing and body shop use to be in compliance, this clearance should address that use and be pursued by the applicant until approved. Niel r' (a f , COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper.Vaginia 22701 Charles A.Kilpatrick, P.E. Commissioner October 18, 2016 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: J.T. Newberry Re: SP-2016-00021-Tommy Shull's Wrecker& Repair Dear Mr. Newberry: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section has reviewed the Special Use Permit for Tommy Shull's Wrecker& Repair, dated September 15, 2016 as submitted by Timmons Group and find it to be generally acceptable. Land use 1. Please show the distance to the nearest entrances to the North and South. As route 742 is a collector, a spacing exception may be required. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at(434) 422-9399 for information pertaining to this process. If you have further questions, please contact Willis C. Bedsaul at 434-422-9866. tiSincerei . 40,,,,,_____, Adam J. M re, P.E. Area Land Use Engineer VDOT- Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING �IRGINl� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 To: Donna Shull(shullstowinq.dhs(&gmail.com) CC: Tommy Shull(shullstowinq(&gmail.com) From: J.T. Newberry, Planning Division Date: 8/14/15 Subject: Mandatory Pre-application Meeting for TMP 09000-00-00-035Q0 on 8/3/15 This meeting satisfies the requirement for a pre-application meeting prior to submittal of a special use permit. The purposes of the meeting are found in Section 33.4 of the Zoning Ordinance and are italicized below followed by staff comment: (i)provide the applicant and the county a common understanding of the proposed project; Based on our past meetings and discussions, you are proposing to add"auto repair"to the existing towing and body shop uses at 1815 Avon Street Extended. Auto repair is a use that requires a special use permit in our industrial districts as a general commercial use. Specifically, this request falls under the following sections of the Zoning Ordinance: 1. Section 26.2-"General commercial use" (via Section 24.2.1(2)"Automobile, truck repair shops") 2. Section 26.3- Independent office and general commercial uses; additional factors when considering special use permits Also,Avon Street Extended is one of the County's Entrance Corridors and therefore your proposal may require an additional special use permit under Section 26.2 for"Outdoor storage, display and/or sales" (this requirement is also found in Section 30.6.3(a)(2)(b)). The determination as to whether a second special use permit is required will be made once the visibility of the vehicles associated with the auto repair use is determined. (Please keep in mind, however,that visibility of vehicles is also regulated by Section 5.1.31 or Section 5.1.32. Therefore,visibility will be an important impact to address regardless of whether a second special use permit is required.) (ii)inform the applicant about the proposed project's consistency with the comprehensive plan, other relevant policies, and county regulations; This parcel is located in Neighborhood 4 of the Southern and Western Neighborhoods Master Plan and is designated for"Office/R&D/Flex/Light Industrial"uses. Further development in this area is expected, especially with respect to light industrial uses. The Land Use Guidelines for this designation recommends commercial uses that are supportive of the primary use where they are deemed to be compatible with adjoining uses.At the proposed scale, staff believes adding an auto repair use to this site would be consistent with the Comprehensive Plan. In addition to consistency with the Comprehensive Plan and the other factors listed in Section 33.8(a),the proposal must also comply with the supplemental regulations found in Section 5.1.31 (Section 5.1.32 already applies to the existing towing use), as well as the factors listed in Section 26.3. Staff believes it is possible for this proposal to comply with these sections by following the design criteria for screening fencing(attached below)and by including statements in the application narrative to address each factor (a-f)from Section 26.3. (iii)broadly identify the planning,zoning and other issues raised by the application that need to be addressed by the applicant; Please see the comments below from Amelia McCulley, Zoning Administrator. The list of current zoning 1 NNW. NNW violations is listed under number five of her letter.We recommend addressing these violations prior to submitting your application for a special use permit. She has listed the relevant staff members and specific actions needed to legally establish the existing towing and body shop uses. Please work with each staff person to complete these steps. I recommend working with Margaret,Glenn, Stewart and Lisa before pursuing a site plan amendment in case there are site changes that need to be reflected on the as-built site plan. Once you're ready to pursue an amendment, please contact me with a list of all of the existing and proposed site changes. In our pre-app meeting,we discussed the site changes listed below. Each of these changes would be required to be shown on an as-built plan: • Moving the existing fence; • Adding an accessory structure for evidence storage; • Adding a dumpster. I also recommend that staff schedule a site visit with to confirm that all of the exterior changes have been appropriately noted. Once all of the changes have been identified, staff can determine whether a minor site plan amendment or letter of revision is needed to amend the existing site plan. Lastly, if you plan to use the existing 1973 site plan as a base for your amendment, please be sure to obtain permission from the person or firm that originally prepared it. Another issue discussed in our meeting related to paving the parking lot.The County Engineer mentioned that a Virginia Stormwater Management Program(or VSMP)plan would be required to formalize water treatment if the lot is paved. I highly recommend that you speak with Engineering staff to get more details about what would be required for this plan prior to paving the lot. Finally,we notified you that this parcel is on a list managed by DEQ as having a leaky underground storage tank.You can find out more about this program contacting DEQ directly. (iv)inform the applicant about the applicable procedure; As with all special use permit applications, you will be expected to host a community meeting to discuss your proposal with the public prior to meeting with the Planning Commission. I've attached some guidelines to hosting a community meeting at the bottom of this document. A complete application is made once we have received the following two items: 1. A completed special use permit application with fee. a. Please note that the property owner(shown as Montague Dixon II or Barbara H Dixon in our Real Estate records)is required to sign the application. 2. The enclosed special use permit checklist along with any necessary supporting materials. a. The column on the checklist titled"Provided with Application (Applicant)"should be completed by the applicant and the signed checklist should be included as a coversheet to the other application materials. The next deadline to submit a completed application is Monday, September 21st. The full submittal schedule may be found here. If you have any further questions, please contact J.T. Newberry(ext. 3270). Sincerely, a,4. 1\u,t7. J.T.Newberry Planner 2 SPECIAL USE PERMIT CHECKLIST for A Tommy Shull's Wrecker and Repair, Inc. 09000-00-00-035Q0 3 --» Project Name/Tax Map Parcel Number After the mandatory pre-application meeting,county staff will mark this checklist kIRGINo appropriately so that it is clear to the applicant the information from Section 33.4(c)that must be submitted with the official application PLANNER INITIALS JTN Required for Provided with application? application (County Staff) (Applicant) SECTION 33.4(c) XX NOTE to staff: if providing additional comments are provided within the checklist boxes, please distinguish those comments with different color print AND italic/underlined print YES NO or some other method that can be distinguished when copied with a black and white copier/printer. x A narrative of the project proposal,including its public need or benefit; x A narrative of the proposed project's consistency with the comprehensive plan, including the land use plan and the master plan for the applicable development area; please also include statements to address letters a-f of Section 26.3"Additional factors when considering special use permits." x A narrative of the proposed project's impacts on public facilities and public infrastructure. x A narrative of the proposed project's impacts on environmental features. x A narrative of the proffers proposed to address impacts from the proposed project. x One or more maps showing the proposed project's regional context and existing natural and manmade physical conditions; A conceptual plan showing,as applicable: x 1)the street network,including circulation within the project and connections to existing and proposed or planned streets within and outside of the project; - sestionskifeoletien ;Dimensions and scale will be an important part of your conceptual plan. Provide as many dimensions as possible,especially when showing required parking areas(one parking spot is 9'wide x 18'long),accessory structures,the length and height of screening/fences,etc. The existing site plan(last revised 7/16/1973)uses a 1"=20'scale if you were able to obtain permission to modify it from the person/firm that originally prepared it. SPECIAL USE PERMIT CHECKLIST 04/2013 Page 1 of 2 rrrr vor+` x 3)the general location of pedestrian and bicycle facilities; x 4)building envelopes; x 5)parking envelopes; x 6)public spaces and amenities; x 7)areas to be designated as conservation and/or preservation areas; x 8)conceptual stormwater detention facility locations; x 9)conceptual grading; x Other special studies or documentation,if applicable,and any other information identified as necessary by the county on the pre-application comment form. No special studies are required to make application. However,following an initial review of your conceptual plan,staff may ask for additional documentation such as a parking study to demonstrate there is enough parking for all the existing and proposed uses or an exhibit to show compliance with supplemental regulations in Section 5.1.31 and 5.1.32 and ARB guidelines. Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. Read and Sign I hereby state that,to the best of my knowledge,the official application submitted contains all information marked on this checklist as required for application. Signature of person completing this checklist Date Print Name Daytime phone number of Signatory I SPECIAL USE PERMIT CHECKLIST 04/2013 Page 2 of 2 pF ALI?, IRcm1 County of Albemarle Department of Community Development Memorandum To: Johnathan Newberry, Planner From: Amelia McCulley, Zoning Administrator Division: Zoning Date: August 12, 2015 Subject: Mandatory Preapplication Meeting Comments for Shull Wrecker and Repair (8/3/2015){TM 90 Parcel 35Q zoned Ll} The following comments are provided as input from the Zoning Division regarding the above noted mandatory pre-application meeting. 1. Proposal— Towing and auto body business is permitted by-right. Independent auto repair requires a special use permit. SP for Auto Repair in LI (§27.2)and possibly for Outdoor Storage in an Entrance Corridor(§30.6.3.a (2) (b)) a. Required parking for use— 1 space per employee +2 per service stall (per lift). We heard there are 6-8 employees and 2 lifts(service stalls). This results in 12 required parking spaces. Other parking (such as repair vehicles) is separate from this number and should be shown. They don't have to be delineated individually but the area must be designated on the plan and on the property (with signage, etc.). b. A building addition was not proposed and therefore not discussed. The proposal to pave the lot in the future was mentioned and the County Engineer indicated that this initiates compliance with Virginia Stormwater Regulations. c. Supplementary Regulation Section as applicable-See Sections 5.1.31 and 5.1.32. Please ask the applicant to review these regulations thoroughly to determine if they can comply or if additional special exceptions are necessary. 2. Special exceptions are likely required and should be submitted with the Special Use Permit. This relates to the requirement in both supplementary regulations that vehicles tosoe vire awaiting repair shall not be visible from public roads or adjoining residential properties. The applicant is advised that they should consider input from the Architectural Review Board and/or Design Planner in order to put their special exception to this requirement in the best possible light. We heard from the Design Planner in the preapp that the current fencing and screening is not sufficient to address the view from Avon Street. 3. Application Plan for ZMAs or Concept Plan for SPs. a. A Concept Plan is needed —The plan should be to-scale. We recommend that you use the existing site plan as the base plan. (The plan submitted for the preapp doesn't provide sufficient accuracy for us to review and administer.) Include as much detail as possible applicable to the proposed use; specifically 4. Process—regarding completeness of the application a. Provide a completed application. Make sure all boxes are checked and you have provided the information noted on the application by that checkbox. i. SP Application link http://www.albemarle.orq/upload/imaqes/forms center/departments/Com munity Development/forms/Special Use Permit Applications/Special U se Permit Application.pdf b. The ZMA or SP checklist is needed. It will need to be the copy of the checklist provided to you with the mandatory comments not one filled out only by you. c. Provide a recorded plat of the property with the Deed Book &Page#. d. Please note that all real estate taxes, nuisance charges, stormwater management utility fees, and any other charges that constitute a lien on the subject property, which are owed to the County of Albemarle must be paid prior to accepting the application. e. The appropriate signature of the owner, the owner's agent, or a contract purchaser. If either the owner's agent or a contract purchaser signs the application then include the owner's written consent that the agent or contract purchaser may file the application on their behalf. 5. Current Zoning Violations It appears that there are multiple zoning violations on this property that need resolution as soon as possible and prior to the special use permit approval: a. Commencing a business use without an approved zoning clearance(§31.5); b. Operating an industrial use without a certified engineer's report(§4.14.5); c. Erecting a sign without a sign permit(§4.15.4); d. Erecting a building (portable Police storage building)without a building permit (§31.2) or approved site plan amendment; e. Modifying a site without an approved site plan amendment(parking, dumpster changes, etc) (§32.4.3.9). 2IPage We understand that this business is also operating from a site within Bob Snow's industrial park. We have not investigated that site for compliance. I recommend that you take the necessary actions to bring the current use into compliance prior to submitting the special use permit(s). The Code Compliance Officer assigned to this case is Lisa Green. Please keep her informed as to your status, to avoid legal action. Necessary actions and relevant staff for assistance include the following: 1. Submit sign permits for all new signs. (Stewart Wright and Margaret Maliszewski) 2. Submit and pursue approval for a site plan amendment which reflects the as- built conditions. (Johnathan Newberry) 3. Submit an engineer's report, to include verification of compliance with applicable state requirements. This includes DEQ approval for a paint booth, etc. (Glenn Brooks) 4. Submit and pursue approval for a building permit for the new Police storage building. (Stewart Wright) 5. Once the site plan and building permits are approved, we can issue the zoning clearance (Stewart Wright) 6. Cease advertising and doing mechanical repair that is not accessory to body work. (Lisa Green) 3IPage — — COUNTY-WIDE CERTIFICATE OF APPROPRIATENESS Safety fencing DESIGN CRITERIA Height No taller than required for safety. Materials • No chain link.No chain link with vinyl slats. • Vinyl is generally not appropriate for the EC. It may be considered in situations where it is located at a distance from the EC if the surface is not shiny or reflective.Planting along the fence may be considered a mitigating factor for vinyl fencing,if the planting will have immediate impact. Colors Colors should be dark;for example,black or Charleston No shiny,reflective finishes. green. Style Styles should be similar to those examples previously approved by the ARB.(See 10/31/08 memo.) COUNTY-WIDE CERTIFICATE OF APPROPRIATENESS Screening fencing DESIGN CRITERIA Height Height should be as low as possible while maintaining full screening. Size/Scale Lengths of 80' or more Length of fence should be must provide variation by mitigated through surface using changes in height, relief,either in detail or different material massing. combinations,projections forward or back,piers, other similar features,or a combination of these. Structure Design Minimize the place of the Detailing should be used to Ornamental screening fence structure in the mitigate surface and texture. fences may be approved on landscape. Design and a case-by-case basis. detailing should be simple. Fences along pedestrian routes should be scaled and detailed relative to human size. Materials Possible fence materials No chain link with or without Metal panel fencing will include wood,wood vinyl slats.No barbed wire, likely require planting composite,stone,brick, razor wire or similar devices. along the fence for decorative concrete block, Length and visibility of fence mitigation. metal panels,or a will be considered in combination of these determining appropriate fence materials. material. Fence material should match or complement the materials found on the building and/or adjoining structures or landscape. Fence materials should have a proven track record %tad 01.10 of durability and longevity relative to color retention and overall appearance. Colors Color should be neutral— No shiny,reflective finishes. for example: gray,brown, Flat finishes are required. or black.A white screening fence will rarely be appropriate. Planting Planting should be used in Placement of planting shall be Fences longer than 40' shall masses to mitigate the sufficient to allow for proper include one evergreen tree visual impact of the length plant growth. or 3 shrubs for each 40-foot of the fence. section or portion thereof planted on the public side. Location Areas requiring screening should be placed behind buildings,as viewed from the EC. If buildings are not available for screening, areas and features to be screened should be located as far from the EC as possible. Locating screening fences along pedestrian paths should be limited. (1104 rd' pF ALki /� 9 ^+�1114; COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 MEMORANDUM TO: Amelia McCulley,Zoning Administrator FROM: Margaret Maliszewski,Principal Planner RE: EC-Appropriate Security Fencing DATE: October 31,2008 At its September 15,2008 meeting,the ARB identified three types of security fencing considered appropriate for the Entrance Corridors.The action memo from that meeting reads as follows: Security Fencing: Examples Regarding appropriate security fencing types for the Entrance Corridors,it was the consensus of the ARB that the following fencing types are acceptable: 1. The vertical pickets at Rio Road near the Fashion Square Mall entrance, 2. The security fence approved for CTS,which is similar to the Scott Stadium colonnade,but it must have a top rail, 3. The metal picket fence at HTC. All must be in dark colors;for example,black or Charleston green. We have gathered some additional information on these fences for your information. Please see the following pages. fir/` Nod 1. Rio Road Fence The Rio Road fence runs along the south side of Rio Road East,east of Hillsdale Drive. It was installed in the last year or two. I do not have a spec for this fence.Although the style fence is considered appropriate,the color of the fence is not considered appropriate for the EC.This fence,and all other security fencing for the ECs,should be a dark color;for example,black or"Charleston Green". I iitt • IlfflhIIIIIIlIIRhIIIlIIIIIIlIIIIIIIIIIIIIIIIIIIIIiilIiff;1u 4 rr Fence on south side of Rio Road East,located east of Hillsdale Drive. Nave (a 2. CTS and Scott Stadium Fences The Scott Stadium fence is an Omega Fence Systems Inc.product. Following are a photo of the Scott Stadium fence and two pages from the Omega catalog. 1104-fi rr1i! •! 1111 IIIIP1••1�i���� 1►► : 1 ��a!!. rig 11�111 �►� '111P0011.4 rrrrr ��, q $$ �;: .,.,.:. ...„, #11111 sop rl►. 40:-. Mir ` t• . .. IS , , ., !*4 4111Ptiii 10.000 ,,,,'',,,,f'. . di hi.- ' -A11 -111 .q „go .files f r'1'''I:"I 1:'41 1111411%ii I 1 In 1111I'4i iblirliPli"*11 141 '1 101104110.111117 iill n IN's. � � M 1 �jr � �' ;; rttrrr�;e=' n1RLI �r��a1r1�s r► � • 1 • .la*.L,00.7_ r.l/;,.....,;_oda_ ...�vii, Jo ipliI`' i maciii. iiiii � �,1 14ii&'i1IF li 1�IIli i ileil l'411E4 i`$i 11111111111 1� ,►1,1111 am lwtf r 1"11�'�' 18! Scott Stadium fence. '4311110, T.PAW*Pa ." •Sea...2.1,6....mu...W. \ \ ' ..1/ ................, are ,.....„.„...;"' .4.11.0.1weri ma.,...dr..,........i..ALA I 1.0 AI.ft•ftt...... ee `......„,_..... ...." .... .„,,,, ft.0............0..ft .... - i \ . •,..,,mu can,so,......1.1.11 1.1...I 1....,....ft,.. .o.' . Changing ....1..110,m... „,.. *ft e• . V the Face . , f . '`....... I ' I cft•Lk........1.lii.N.ft•aft.........ft 110'tft..•Sm.&pr.... ...........m.awl Yaw..........1.1..wm.led.......•r..... ..118, . .101 mom.. \ % • ,.. - I,*'awe ilitIrl.11,-.14 0•101.11/61.0.11e,tam IN ' 1 \ \\)./.. W.................ASTI 111!.... I j1/4 • agrilmucd bp &anis&bill•Cp-Soc . PO 116•11.12Ke ... 1210 6-10•110.21.4td -' Rxhonentl,Vi I ye r n•23224 Topa 32/P42400B2e3x DO,11. 1 . • I ta.J.C.i.*Cs 117.3.15 • , . .• ' OMFGA ::', ';',1;: '"?, • ..- S X ........,.. ...-•...- ' . OMEGA ........ I. • „,. Omega fence catalog(Scott Stadium). ; . - A..... . •, ;.,‘:'''I i'•2 ..,. ban:- . ''•',,11 '.' ' Is '....,, , , 2 1 II ..-, , t,:.4,!,if, .-.. . t ...ft v..10•0.•only -.2o • ,iti ...... ant ft ttttt...W. • '• ,41 , I ; ® ...ft II • 61643 641:10 41.414.0.44. 0.111,•...........1ft....1,..fti is.I tftel. • .. .1 *1......,......ft.I urtiftftenft.At•.•••••• ftwo.ftftaatt....f.........ft 11........ft nftl..... IM1.11.1114.1,Va. j"- Vona.•••,...................••.........ft,.rd.1.........4 ft..................ftl .*I......1 6......•.•J......rm.1,*•f.....•-•—•..•••.1,..1,.' 1....4 ..L.... - -,-., 1....b... ••• 1,',''1....1 r'41....• ', 1' 4141.4 li ',.1.44 dl.4 .. r 1 . ,.;.r.,.:-:{t..—...t.#41;,..tr...44 ..-41.1r:...,.:1;:.:414: • F. • , '`.`:7.-"r`I'"--Itr4**1-''''`'''`.'H"`"."e4`.1••=•••.1-4 ',.. pm an*....Aft..4.....p......ftlrfte 41741: Vit Oates*llystoaro...1•••••••••litt ismenopnlegot Omega fence catalog(Scott Stadium). armor. w .+r The CTS fence is a fence that has been approved by the ARB but it has not yet been constructed. Following are a number of details taken from the CTS drawings submitted to the ARB for review. —UPON n. SIN R. _ f 4.� ��—l�t_r __ �^ ' i DROP 8/A • CONCAR '..7..". 6•N c PO51, FOUNDATION • 015.1,40441455 • '—r"7. • DOUBLE SWING GATE INSTALLATION DETAILS CTS fence detail. I . 3•SQUARE POST— ALLOW Y FROM BOTTOM OF SETTING TO THE GROUND 4 BRACKETS REQUIRED FOR 8' Z•_8• HIGH FENCE 18-DIA CONC POST ANCHOR. 3.-0•DEEP 104 j• FENCE INSTALLATION DETAILS CTS fence detail. A... PRESSED STEEL CAP, GALVANIZED ♦ DOUBLE WIRE ELITE PANEL 4/4/4 GAUGE MIN DISTANCE BETWEEN \/ GALVANIZED WIRE POST AND PANEL 3/4' MAX DISTANCE BETWEEN I POST AND PANEL: 2 1/4' � \ ,� � 110 ,1144, ItH ALL PARTS TO BE Z' POLYESTER POWDER COATED EXCEPT NUTS AND BOLTS Ii. '�� rfl nih UNIVERSAL BRACKET KIT, INSTALL FLUSH WITH HORIZONTAL WIRES W/NO GAP 3'X 3'GALVALUME STEEL TUBE POST OUTSIDE FACE ISOMETRIC VIEW CTS fence detail. II 0411°11.1111r" Co COLUA 12 Da..STEEL G•LVANLEED0-. .0 RETAIN. ,/.•TACK:1� I rxw.rri— GNAW*1101.1% ..SNE/1 AND PIN 5/it'ain' GALVANIZED t+waZED UNIVERAL BRACKET KIT DROP BAR CTS fence details. (1) 0 . 3. Hollvmead Town Center fence Our research indicates that the fence located along the west side of the Target building in the Hollymead Town Center is a style called "Majestic"from a line called"Aegis Plus"produced by a manufacturer named"Ameristar". (This information comes from Dan Tuckwiller with the Long Fence Company.)There are several fences by other manufacturers that are very similar to this one. Ameristar's web address is: www.ameristarfence.com The"Majestic"page from their catalog can be found at this link:http://www.ameristarfence.com/Architectural%20Brochure.pdf y fi so Hollymead Town Center fence,west of Target. Detail of HTC fence. 1111111 II s - a Copies of two Aegis catalog pages follow. AEGIS pLus TM COMMERCIAL ORNAMENTAL FENCE Aegis Plus Rails:Double-walled channel 1-1/2"Sq.x.150"(effective wall thickness) Aegis Plus Pickets: 3/4"x 3/4"x 16 Ga. r7 ._,„. _._•.., FORERUNNER". IU MUMMl}4141 % i / y lj I %vi —FORERUNNER"'RAIL Double-walled"U"-Channel specially formed high strength architectural shape. 640 ,„, Al ______... INTERNAL RETAINING ROD ( Variable pitch connection system IVa ..,„, for ease of installation,high angle unsightly ility and elimination of Mir' unsigexternal fasteners. (` i1F10 STAINI.FSSS7'EEL SECURITY FASTENER ��' One way action secures rail INLESS STEEL STAIand NLESS ,,,,,,,,, i Illr- PANEI,IIRACKET normal tools. Spatially designed two- pilloint connection ensures ...„.40:1 O fixity of rail ends for increased strength. STRENGTH •SECURITY •VALUE •QUALITY •APPEARANCE Page 7-I t iic.ii,c 1:.01.05 . Aegis catalog page(HTC). I Nor' .4411P. w /s Ni r e. 0 _ _— --i- Cl. •a,. ...: i: .fl �� ��_ .._._.. , y r w- • _ 111111111111.1.0M11 _ s 1i+ • MI _-- - NI ll IN • — U : • 1 '� Vis® ■ ,n .c • —ill = a c el ) U CS ac p. 63 (n y M 1`.y I / • . N I. N N 5553 I x * —II z r, 'Towcio p. c, 6 N '" E 17 a ._-- E 3 pa Ezra " EzOA : ry c - Z o N - U V N Ch A h *N .VM IV �ot . 3 : P,' I co N W .. E Ti c U Aegis catalog page(HTC).