HomeMy WebLinkAboutWPO201700077 Review Comments WPO VSMP 2018-10-15 •
• • 608 Preston Avenue
Suite 200 P 434.295.5624 •
TI M M O N S GROUP Charlottesville, VA 22903 F 434.295.8317
YOUR VISION ACHIEVED THROUGH OURS. www.tinmons.com
October 15, 2018
Matt Wentland, P.E.
County of Albemarle
Dept. of Community Dev.
401 McIntire Rd
Charlottesville, VA 22902-4596
RE: Woolen Mills Redevelopment—WP0201700077 - Comment Response Letter
Dear Mr. Wentland:
We have reviewed all of your comments from August 29, 2018 and made the necessary
revisions. Please find our responses to the comments below in bold lettering.
Comments dated 08/29/2018 by Matt Wentland:
A. Stormwater Pollution Prevention Plan (SWPPP)
1. Please provide signed copies of the registration statement and the certification.
(Rev. 1) Comment partially addressed. Please provide a copy of the signed
Certification. (Rev. 2) Comment not addressed. (Rev. 3) Comment
addressed.
Acknowledged.
B. Pollution Prevention Plan (PPP)
1. The PPP appears to be acceptable at this time
Acknowledged.
C. Stormwater Management Plan (SWMP)
1. Please submit a Floodplain Development Permit application (Link). (Rev. 1) Response
noted. (Rev. 2) Comment not addressed. (Rev. 3) FDP is currently under review.
Acknowledged
2. The 4:361-bs 4.14Ibs of nutrient credits will need to be purchased prior to plan approval.
We recommend waiting until site plan comments have been issued to ensure that no
major changes to the site design are required. (Rev. 1) Response noted. (Rev. 2)
Please contact Ana Kilmer prior to purchasing credits.
Acknowledged. Ana Kilmer has been contacted and developer has been made
aware of requirements. (Rev. 3) Response noted.
4.14Ibs of nutrient credits were purchased on September 27, 2018. Copy attached.
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
3. The VRRM worksheet was difficult to read. Please provide a larger copy(or email me
the excel file). (Rev. 1) Comment addressed.
Acknowledged.
4. Add a note to the plans and calculations stating the total drainage area of Moore's Creek
at each outfall versus the drainage to that outfall to show Channel Protection compliance
(1% rule). Entering a floodplain does not provide compliance under 9VAC25-870-66.B.4.
(Rev. 1) Comment addressed.
Acknowledged.
5. Provide more detailed depictions of the proposed outfalls showing how the endwalls and
riprap will be set into the bank and verification from the Army Corps (Vini Pero)that they
are acceptable. (Rev. 1) Comment not addressed. Per emails with Timmons, the
next submittal should address this. (Rev. 2) Comment addressed.
Acknowledged.
D. Erosion and Sediment Control Plan (ESCP)
1. To prevent erosion, the sediment basin outfall should not release the flow at the top of
the slope. If possible, the proposed permanent storm pipe should be installed first and
used as the basin's outlet. (Rev. 1) Comment addressed.
Acknowledged.
2. (Rev. 2 comment) Show the proposed Level Spreader on the plans. Provide a
detail/narrative on the plans stating that the basin will be tied into the storm system as
soon as possible per email to Andrew on 6/7/18. (Rev. 3) Comment addressed
Acknowledged.
E. Mitigation Plan
1. Provide a planting plan for the mitigation. Please refer to the Mitigation Plan checklist
here. (Rev. 1) Comment addressed.
Acknowledged.
We have included hard copies of the plans and calculations for your review. If you have
any questions or comments, please feel free to give me a call at 434.327.1690.
Sincerely,
Andrew Allison
Project Engineer
Chesapeake Bay Nutrient l {Frust,LLC
SOO
5735 S.Laburnum Ave.
' Richmond,Virginia 23231
Exhibit A
CHESAPEAKE BAY NUTRIENT LAND TRUST,LLC—OAK GROVE
AFFIDAVIT OF PHOSPHORUS CREDIT SALE
CHESAPEAKE BAY NUTRIENT LAND TRUST, LLC, a Virginia limited
liability company(the"Company"),hereby certifies the following:
1. Pursuant to that certain Purchase and Sale Agreement dated August 1,2018(the
"Agreement"),between the Company(as Seller)and Woolen Mills,LLC("Purchaser"),the
Company,for the benefit of the Purchaser,agreed to sell 4.14 pounds of nonpoint source
phosphorus Credits to Purchaser and retire the associated ratio of nonpoint source nitrogen
Credits at the credit generating facility in the amount of 10.06 pounds of nitrogen Credits;
2. The Company and the Purchaser,as of the date hereof,have closed the transaction
contemplated by the Agreement and the Company has sold to Purchaser the phosphorus
Credits;
3. The credits shall apply to Woolen Mills Redevelopment—WPO-2017-00077.
WITNESS the following signature:
CHESAPEAKE BAY NUTRIENT LAND TRUST, LLC,
a Vir ' is li ite- li•,•i r, company
By:
�t
Manager
Date: r.401.e.47,94114_„11.--- Golf zoe
•l
Sworn to and subscribed before me this 27 day of S cT TE, c14-. , 2018, by
11 iteArr L. Fzn,-As , Manager, on behalf of Chesapeake Bay Nutrient
Land Trust,LLC, a Virginia limited liability company.
My commission expires: MAt.c.f{ 3/, Zd i t City/County of: tk,..ter i w
J a. g41
Notary Public
Project Description:Woolen Mills Redevelopment—WPO-2017-00077 SCOTT A.REED
Project Tax Map Parcel ID:07800-00-00-021B0 NOTARI1?tJBIIC
Permittee:Woolen Mills,LLC RECOMMONWONW AEALTHLTH #,958837
OF VIRGINIA
Project 8-Digit HUC: 02080204 COMMISSION EXPIRES MARCH 31,2021
Oak Grove Nutrient Facility 8-Digit HUC: 02080203
Phosphorus Credits:4.14 pounds
Associated Nitrogen Credits: 10.06 pounds
Chesapeake Bay Nutrient Land Trust,LLC
Oak Grove 1 9/27/2018
Purchase and Sale Agreement
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project title:
Project file number:
Plan preparer:
Owner or rep.:
Plan received date:
(Rev. 1)
(Rev. 2)
(Rev. 3)
Date of comments:
(Rev. 1)
(Rev. 2)
(Rev. 3)
Reviewers:
VSMP Permit Plan Review
Woolen Mills Redevelopment
WP0201700077
Timmons Group [CRAIG.KOTARSKI@TIMMONS.COM]
Brian Roy [brianhroy@gmail.com]
4 December 2017
9 March 2018
23 May 2018
15 August 2018
20 December 2017
17 April 2018
8 June 2018
29 August 2018
Matt Wentland
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The VSMP application content requirements can be
found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary.
Please provide signed copies of the registration statement and the certification. (Rev. 1) Comment
partially addressed. Please provide a copy of the signed Certification. (Rev. 2) Comment not
addressed. (Rev. 3) Comment addressed.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. The PPP appears to be acceptable at this time.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. Please submit a Floodplain Development Permit application (Link). (Rev. 1) Response noted.
(Rev. 2) Comment not addressed. (Rev. 3) FDP is currently under review.
2. The 4.351bs 4.14lbs of nutrient credits will need to be purchased prior to plan approval. We
recommend waiting until site plan comments have been issued to ensure that no major changes to
Engineering Review Comments
Page 2 of 3
the site design are required. (Rev. 1) Response noted. (Rev. 2) Please contact Ana Kilmer prior
to purchasing credits. (Rev. 3) Response noted.
3. The VRRM worksheet was difficult to read. Please provide a larger copy (or email me the excel
file). (Rev. 1) Comment addressed.
4. Add a note to the plans and calculations stating the total drainage area of Moore's Creek at each
outfall versus the drainage to that outfall to show Channel Protection compliance (1% rule).
Entering a floodplain does not provide compliance under 9VAC25-870-66.B.4. (Rev. 1)
Comment addressed.
5. Provide more detailed depictions of the proposed outfalls showing how the endwalls and riprap
will be set into the bank and verification from the Army Corps (Vini Pero) that they are acceptable.
(Rev. 1) Comment not addressed. Per emails with Timmons, the next submittal should
address this. (Rev. 2) Comment addressed.
D. Erosion and Sediment Control Plan (ESOP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. To prevent erosion, the sediment basin outfall should not release the flow at the top of the slope. If
possible, the proposed permanent storm pipe should be installed first and used as the basin's
outlet. (Rev. 1) Comment addressed.
2. (Rev. 2 comment) Show the proposed Level Spreader on the plans. Provide a detail/narrative on
the plans stating that the basin will be tied into the storm system as soon as possible per email to
Andrew on 6/7/18. (Rev. 3) Comment addressed
E. Mitigation Plan
1. Provide a planting plan for the mitigation. Please refer to the Mitigation Plan checklist here. (Rev.
1) Comment addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
Engineering Review Comments
Page 3 of 3
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptforms.asp?department=cden.gwpo
File: WPO201700077 Woolen Mills rev3 08-29-18.doc
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit Plan Review
Project title: Woolen Mills Redevelopment
Project file number: WP0201700077
Plan preparer:
Timmons Group [CRAIG.KOTARSKI@TIMMONS.COM]
Owner or rep.:
Brian Roy [brianhroy@gmail.com]
Plan received date:
4 December 2017
(Rev. 1)
9 March 2018
(Rev. 2)
23 May 2018
Date of comments:
20 December 2017
(Rev. 1)
17 April 2018
(Rev. 2)
8 June 2018
Reviewers:
Matt Wentland
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The VSMP application content requirements can be
found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Please provide signed copies of the registration statement and the certification. (Rev. 1) Comment
partially addressed. Please provide a copy of the signed Certification. (Rev. 2) Comment not
addressed.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. The PPP appears to be acceptable at this time.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. Please submit a Floodplain Development Permit application (Link). (Rev. 1) Response noted.
(Rev. 2) Comment not addressed.
2. The 4.351bs 4.14lbs of nutrient credits will need to be purchased prior to plan approval. We
recommend waiting until site plan comments have been issued to ensure that no major changes to
the site design are required. (Rev. 1) Response noted. (Rev. 2) Please contact Ana Kilmer prior
to purchasing credits.
Engineering Review Comments
Page 2 of 3
3. The VRRM worksheet was difficult to read. Please provide a larger copy (or email me the excel
file). (Rev. 1) Comment addressed.
4. Add a note to the plans and calculations stating the total drainage area of Moore's Creek at each
outfall versus the drainage to that outfall to show Channel Protection compliance (1% rule).
Entering a floodplain does not provide compliance under 9VAC25-870-66.B.4. (Rev. 1)
Comment addressed.
5. Provide more detailed depictions of the proposed outfalls showing how the endwalls and riprap
will be set into the bank and verification from the Army Corps (Vini Pero) that they are acceptable.
(Rev. 1) Comment not addressed. Per emails with Timmons, the next submittal should
address this. (Rev. 2) Comment addressed.
D. Erosion and Sediment Control Plan (ESOP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESOP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. To prevent erosion, the sediment basin outfall should not release the flow at the top of the slope. If
possible, the proposed permanent storm pipe should be installed first and used as the basin's
outlet. (Rev. 1) Comment addressed.
2. (Rev. 2 comment) Show the proposed Level Spreader on the plans. Provide a detail/narrative on
the plans stating that the basin will be tied into the storm system as soon as possible per email to
Andrew on 6/7/18.
E. Mitigation Plan
1. Provide a planting plan for the mitigation. Please refer to the Mitigation Plan checklist here. (Rev.
1) Comment addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
Engineering Review Comments
Page 3 of 3
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptfonns.asp?department=cdengwpo
File: WPO201700077 Woolen Mills rev2 06-08-18.doc
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit Plan Review
Project title: Woolen Mills Redevelopment
Project file number: WP0201700077
Plan preparer:
Timmons Group [CRAIG.KOTARSKI@TIMMONS.COM]
Owner or rep.:
Brian Roy [brianhroy@gmail.com]
Plan received date:
4 December 2017
(Rev. 1)
9 March 2018
Date of comments:
20 December 2017
(Rev. 1)
17 April 2018
Reviewers:
Matt Wentland
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The VSMP application content requirements can be
found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Please provide signed copies of the registration statement and the certification. (Rev. 1) Comment
partially addressed. Please provide a copy of the signed Certification.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. The PPP appears to be acceptable at this time.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. Please submit a Floodplain Development Permit application (Link). (Rev. 1) Response noted.
2. The 4.35lbs of nutrient credits will need to be purchased prior to plan approval. We recommend
waiting until site plan comments have been issued to ensure that no major changes to the site
design are required. (Rev. 1) Response noted.
3. The VRRM worksheet was difficult to read. Please provide a larger copy (or email me the excel
file). (Rev. 1) Comment addressed.
4. Add a note to the plans and calculations stating the total drainage area of Moore's Creek at each
outfall versus the drainage to that outfall to show Channel Protection compliance (I% rule).
Entering a floodplain does not provide compliance under 9VAC25-870-66.B.4. (Rev. 1)
Engineering Review Comments
Page 2 of 3
Comment addressed.
5. Provide more detailed depictions of the proposed outfalls showing how the endwalls and riprap
will be set into the bank and verification from the Army Corps (Vivi Pero) that they are acceptable.
(Rev. 1) Comment not addressed. Per emails with Timmons, the next submittal should
address this.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. To prevent erosion, the sediment basin outfall should not release the flow at the top of the slope. If
possible, the proposed permanent storm pipe should be installed first and used as the basin's
outlet. (Rev. 1) Comment addressed.
E. Mitigation Plan
1. Provide a planting plan for the mitigation. Please refer to the Mitigation Plan checklist here. (Rev.
1) Comment addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
Engineering Review Comments
Page 3 of 3
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/dpptforrns.asp?dgpartment=cden,gwpo
File: WPO201700077 Woolen Mills rev 04-17-18.doc
I'M
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit Plan Review
Project title:
Woolen Mills Redevelopment
Project file number:
WP0201700077
Plan preparer:
Timmons Group [CRAIG.KOTARSKI@TIMMONS.COM]
Owner or rep.:
Brian Roy [brianhroy@gmail.com]
Plan received date:
4 December 2017
Date of comments:
20 December 2017
Reviewers:
Matt Wentland
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The VSMP application content requirements can be
found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Please provide signed copies of the registration statement and the certification.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. The PPP appears to be acceptable at this time.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. Please submit a Floodplain Development Permit application (Link).
2. The 4.35lbs of nutrient credits will need to be purchased prior to plan approval. We recommend
waiting until site plan comments have been issued to ensure that no major changes to the site
design are required.
3. The VRRM worksheet was difficult to read. Please provide a larger copy (or email me the excel
file).
4. Add a note to the plans and calculations stating the total drainage area of Moore's Creek at each
outfall versus the drainage to that outfall to show Channel Protection compliance (1% rule).
Entering a floodplain does not provide compliance under 9VAC25-870-66.B.4.
5. Provide more detailed depictions of the proposed outfalls showing how the endwalls and riprap
will be set into the bank and verification from the Army Corps (Vini Pero) that they are
acceptable.
Engineering Review Comments
Page 2 of 3
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
1. To prevent erosion, the sediment basin outfall should not release the flow at the top of the slope.
If possible, the proposed permanent storm pipe should be installed first and used as the basin's
outlet.
E. Mitigation Plan
1. Provide a planting plan for the mitigation. Please refer to the Mitigation Plan checklist here.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond
estimate request form and fee to the Department of Community Development. One of the plan reviewers
will prepare estimates and check parcel and easement information based on the approved plans. The
County's Management Analyst will prepare bond agreement forms, which will need to be completed by
the owner and submitted along with cash, certificates or sureties for the amounts specified. The
agreements will need to be approved and signed by the County Attorney and County Engineer. This may
take 2-4 weeks to obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and
recorded. The County's Management Analyst or other staff will prepare the forms and check for
ownership and signature information. The completed forms will need to be submitted along with court
recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves
the application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the
remainder of the application fee. The form identifies the contractor and responsible land disturber, and
the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
Engineering Review Comments
Page 3 of 3
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org;/deptfortns.asp?department=cdengWo
File: WPO201700077 Woolen Mills 12-20-17.doc
•
le 608 Preston Avenue
Suite 200 P 434.295.5624
TI M M O N S GROUP Charlottesville, VA 22903 F 434.295.8317
YOUR VISION ACHIEVED THROUGH OURS. www.timmons.com
July 31, 2018
Matt Wentland, P.E.
County of Albemarle
Dept. of Community Dev.
401 McIntire Rd
Charlottesville, VA 22902-4596
RE: Woolen Mills Redevelopment—WP0201700077 - Comment Response Letter
Dear Mr. Wentland:
We have reviewed all of your comments from June 8, 2018 and made the necessary
revisions. Please find our responses to the comments below in bold lettering.
Comments dated 06/08/2018 by Matt Wentland:
A. Stormwater Pollution Prevention Plan (SWPPP)
1. Please provide signed copies of the registration statement and the certification.
(Rev. 1) Comment partially addressed. Please provide a copy of the signed
Certification. (Rev. 2) Comment not addressed.
A copy of the signed registration statement and certification have been provided
for your use and review.
B. Pollution Prevention Plan (PPP)
1. The PPP appears to be acceptable at this time
Acknowledged.
C. Stormwater Management Plan (SWMP)
1. Please submit a Floodplain Development Permit application (Link). (Rev. 1) Response
noted. (Rev. 2) Comment not addressed.
Acknowledged, a Floodplain Development Permit application has been provided
for your use and review.
2. The 4.35Ibs 4.14Ibs of nutrient credits will need to be purchased prior to plan approval.
We recommend waiting until site plan comments have been issued to ensure that no
major changes to the site design are required. (Rev. 1) Response noted. (Rev. 2)
Please contact Ana Kilmer prior to purchasing credits.
Acknowledged. Ana Kilmer has been contacted and developer has been made
aware of requirements.
CIVIL ENGINEERING ENVIRONMENTA, j SURVEYING I GIS I LANDSCAPE ARCHITECT,RE I CONSTRUCTION SERVICES
3. The VRRM worksheet was difficult to read. Please provide a larger copy (or email me
the excel file). (Rev. 1) Comment addressed.
Acknowledged.
4. Add a note to the plans and calculations stating the total drainage area of Moore's Creek
at each outfall versus the drainage to that outfall to show Channel Protection compliance
(1% rule). Entering a floodplain does not provide compliance under 9VAC25-870-66.B.4.
(Rev. 1) Comment addressed.
Acknowledged.
5. Provide more detailed depictions of the proposed outfalls showing how the endwalls and
riprap will be set into the bank and verification from the Army Corps (Vini Pero)that they
are acceptable. (Rev. 1) Comment not addressed. Per emails with Timmons, the
next submittal should address this. (Rev. 2) Comment addressed.
Acknowledged.
D. Erosion and Sediment Control Plan (ESCP)
1. To prevent erosion, the sediment basin outfall should not release the flow at the top of
the slope. If possible, the proposed permanent storm pipe should be installed first and
used as the basin's outlet. (Rev. 1) Comment addressed.
Acknowledged.
2. (Rev. 2 comment) Show the proposed Level Spreader on the plans. Provide a
detail/narrative on the plans stating that the basin will be tied into the storm system as
soon as possible per email to Andrew on 6/7/18.
Plans have been updated to reflect revision to sediment basin outfall to include
level spreader. Sequence of construction has been modified to reflect that the
basin should be tied to the storm system as soon as possible.
E. Mitigation Plan
1. Provide a planting plan for the mitigation. Please refer to the Mitigation Plan checklist
here. (Rev. 1) Comment addressed.
Acknowledged.
We have included hard copies of the plans and calculations for your review. If you have
any questions or comments, please feel free to give me a call at 434.327.1690.
Sincerely,
Andrew Allison
Project Engineer
•
• • • 608 Preston Avenue
Suite 200 P 434.295.5624
T I M M O N S GROUP Charlottesville, VA 22903 F 434.295.8317
YOUR VISION ACHIEVED THROUGH OURS. www.timmons.com
March 8, 2018
Matt Wentland
County of Albemarle
401 McIntire Rd
Charlottesville,VA 22902
RE: Woolen Mills Redevelopment—VSMP Permit Plan Review Comment Response
Letter—WPO201700077
Dear Mr. Wentland:
We have reviewed all of your comments from December 20, 2017 and made the necessary
revisions. Please find our responses to the comments below in bold lettering.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A
SWPPP must contain (I) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures
necessary.
. Please provide signed copies of the registration statement and the certification.
Acknowledged, a signed of the registration statement and certification.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
. The PPP appears to be acceptable at this time.
Acknowledged.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or
disapprove a SWMP. This plan is disapproved, and the reasons are provided in the
comments below. The Stormwater management plan content requirements can be
found in County Code section 17-403.
. Please submit a Floodplain Development Permit application.
Acknowledged. Floodway calculations are currently underway and will be
completed with the Floodplain Development Permit application upon finalization.
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
Noire 'sad
2. The 4.35 lbs of nutrient credits will need to be purchased prior to plan approval. We
recommend waiting until site plan comments have been issued to ensure that no
major changes to the site design are required.
A letter of nutrient credit availability has been provided on Sheet C6.0.
3. The VRRM worksheet was difficult to read. Please provide a larger copy(or email
me the excel file).
Acknowledged, a digital copy of the VRRM worksheet will be provided for your use
and review.
4. Add a note to the plans and calculations stating the total drainage area of Moore's
Creek at each outfall versus the drainage to that outfall to show Channel Protection
compliance (I% rule). Entering a floodplain does not provide compliance under
9VAC25-870-66.B.4.
The total drainage area for Moores Creek is 22,465 AC. I% of this drainage area is
224.65 AC. Site area contributing to Moores Creek is 6.54 AC. Calculations have
been updated. See Sheet C6.0 for additional information.
5. Provide more detailed depictions of the proposed outfalls showing how the endwalls
and riprap will be set into the bank and verification from the Army Corps (Vini Pero)
that they are acceptable.
Per discussions with Frank Pohl, the outfall location has been moved uphill outside
of the floodway.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code 62.1-44.15:55 requires the VESCP authority to approve or disapprove an
ESCP. This plan is disapproved, and the reasons are provided in the comments below.
The erosion control plan content requirements can be found in County Code section 17-
402.
I. To prevent erosion, the sediment basin outfall should not release the flow at the top
of the slope. If possible, the proposed permanent storm pipe should be installed first
and used as the basin's outlet.
The proposed sediment basin outfall will utilize a portion of the proposed storm
sewer pipe system that connects to the end wall and riprap directly adjacent to
Moores Creek eliminating the concern for any additional soil erosion.
E. Mitigation Plan
I. Provide a planting plan for the mitigation. Please refer the Mitigation Plan Checklist.
See Sheet L.OI the mitigation planting plan. The mitigation plan checklist has also
been provided for your review.
Nue sod
We have included PDF copies of the plans and calculations for your review. If you have any
questions or comments, please feel free to give me a call at 434.414.0354.
Sincerely,
Clint Shifflett, PE
Project Manager