HomeMy WebLinkAboutARB201800126 Review Comments 2018-09-25 Margaret Maliszewski From: Margaret Maliszewski Sent: Tuesday, September 25, 2018 5:35 PM To: 'Daniel @ Line and Grade'; 'Kevin Schafer' Subject: ARB-2018-126: Plaza 285 Attachments: resubmittal form.docx I have reviewed the revised submittal for Plaza 285. My comments on the ARB submittal and LOR are listed below. 1. The lighting plan shows excessive lighting levels in several locations near the building. Illumination at the ground should not exceed 20 fc. Please revise the lighting plan accordingly. 2. Add the standard lighting note to the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads.The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 3. Please double-check and confirm the lack of visibility of rooftop equipment from the far side of the Hydraulic/Whitewood intersection. Please submit one copy of revised drawings addressing these comments,together with the attached resubmittal form and a memo indicating how each comment has been addressed. When staff's review of this information indicates that all comments have been addressed, a Certificate of Appropriateness may be issued. If you have any questions, please feel free to contact me. Thanks. Margaret Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org 1 b. Pantops Master Plan: Overview The ARB received staff's overview of the Pantops Master Plan update process and expressed interest in receiving updates on master planning efforts where Entrance Corridors are included. c. ARB-2018-126: Plaza 285:Visibility of rooftop equipment It was the consensus of the ARB that the screening is required if the rooftop equipment is visible, but the color should be a dark gray for greater coordination with the building colors. d. ARB-2018-97: Hansen Road Church: Metal panel It was the consensus of the ARB that the metal panel was acceptable in the "midnight bronze" color. e. Next ARB Meeting: November 5, 2018 ADJOURNMENT The meeting was adjourned at 3:00 p.m.to the next ARB meeting on Monday, November 5,2018 in Room 241, Second Floor, County Office Building at 1:00 p.m. Albemarle County Architectural Review Board Final Action Memo October 15,2018 4 �.►- DESIG1 DEVELOP Response to Comments 3. [Comment] ARB Approval is required prior to LOR approval. See attached comments. Rev 1. Comment still relevant see ARB's comments below. 1. The lighting plan shows excessive lighting levels in several locations near the building. Illumination at the ground should not exceed 20 fc.Please revise the lighting plan accordingly. Response: Recessed can lights under each canopy have been reduced from two to one. The lighting plan has been revised to show illumination levels at the ground do not exceed 20 fc. 2. Add the standard lighting note to the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." Response: The standard note has been added to the revised lighting plan. 3. Please double-check and confirm the lack of visibility of rooftop equipment from the far side of the Hydraulic/Whitewood intersection. Response: From our renderings and perspective modeling, we do not anticipate visibility of the HVAC rooftop equipment. However, the following note has been added to the sheet A1.3 Mechanical. See 4/A 1.3 for views of proposed perspectives and screening. Please also find attached specified screening system, if HVAC units are indeed visible from the Entrance Corridor following completion of the renovation. MECHANICAL UNIT ONLY VISIBLE IN ELEVATION. IF AFTER COMPLETION OF RENOVATION, THE MECHANICAL EQUIPMENT REMAINS VISIBLE, PROVIDE SCREENING SYSTEM SPECIFIED. 418 EAST MAIN STREET, CHARLOTTESVILLE, VA 22902 www.designdevelopllc.org • 434.804.8365 LINE I GRADE CIVIL ENGIN E E R I N G October 03, 2018 Department of Community Development 401 McIntire Road, North Wing Charlottesville,VA 22902 Attention:Christopher P. Perez Senior Planning/Planning Division RE: Project Comments Dear Christopher, On behalf of Bert and Florence Lee Wellons and Design Develop(DD)we offer the following responses and plan revisions to comments dated October 03, 2018.Our Responses are in bold italic text below each comment. Comment addressed. 2. [Comment] Revise the title of the plan: "SDP1981-5 Beech Tree Plaza—LOR 1". Rev 1. Comment not addressed. Acknowledged. Title has been changed to "SDP1981-5 BEECH TREE PLAZA—LOR 1". 3. [Comment]ARB approval is required prior to LOR approval.See attached comments. Rev 1. Comment still relevant. See ARB's comments below. See ARB comments below. 4. LINE + GRADE CIVIL ENGINEERING Comment addressesd 113 4th St NE Ste 100 CHARLOTTESVILLE,VA 22902 434.242.0169 LINE-GRADE.COM Plaza 285 Comment Responses to Initial Plan Review August 31,20181 Page 2 Margaret Maliszewski—ARB 5. The lighting plan shows excessive lighting levels in several locations near the building. Illumination at the ground should not exceed 20 fc. Please revise the lighting plan accordingly. Recessed can lights under each canopy have been reduced from two to one. The lighting plan has been revised to show illumination levels at the ground do not exceed 20 fc. 6. Add the standard lighting note to the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads.The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." The standard note has been added to the revised lighting plan. 7. Please double-check and confirm the lack of visibility of rooftop equipment from the far side of the Hydraulic/Whitewood intersection. From our renderings and perspective modeling, we do not anticipate visibility of the HVAC rooftop equipment.However, the following note has been added to the sheet A1.3 Mechanical. See 4/A1.3 for views of proposed perspectives and screening. Please also find attached specified screening system,if HVAC units are indeed visible from the Entrance Corridor following completion of the renovation. MECHANICAL UNIT ONLY VISIBLE IN ELEVATION. IF AFTER COMPLETION OF RENOVATION, THE MECHANICAL EQUIPMENT REMAINS VISIBLE,PROVIDE SCREENING SYSTEM SPECIFIED. LINE + GRADE CIVIL ENGINEERING - _ DESk1 ,, DEVELOP Response to Comments 4. Final approval of ARB-2018-95 is required prior to final approval of Letter of Revision.Folowing are the ARB conditions of approval. a. Provide material and color samples for review. Reponse: The material to be used to white wash the brick has been provided, as have the paint selections for the two stucco bump out colors. b. Indicate the location of mechanical equipment and show how visibility will be eliminated from the EC street. Response: See sheet A1.3 for diagrams and perspectives on where the mechanical equipment is located on the roof and how it will be screened by adjacent parapet walls. c. Provide details on all new lighting for review. Response: A photometric plan for new building lights and associated cut sheets have been provid- ed in the Letter of Revision. d. Confirm that all landscaping shown on the approved site plan is present on site. If trees or shrubs are missing, they will need to be replaced, or proposed revisions will need to be included in a site plan amendment. Reponse: All missing or damaged landscape will be replaced per the previously approved Land- scape Plan, dated 04/29/1983.See note 3, Cl 0 on the Letter of Revision drawing set. e. A site plan amendment (Letter of Revision) is required for all changes proposed to site elements, including but not limited to lighting, landscaping, sidewalks, ramps, etc. Reponse: Acknowlegged. A Letter of Revision has been submitted that addresses all proposed changes to site elements. f. Include the Standard health plant note on the site plan. Response: Acknowledged.The site plan now includes the standard note. See note 2, C1.0 418 EAST MAIN STREET CHARLOTTESVILLE, VA 22902 www.designdeveloplic.org • 434 804 8365 LINE I GRADE CIVIL ENGINEERING September 11,2018 Department of Community Development 401 McIntire Road, North Wing Charlottesville,VA 22902 Attention: Margaret Maliszewski Chief of Planning/Resource Management RE: Project Comments Dear Margaret, On behalf of Bert and Florence Lee Wellons and Design Develop(DD)we offer the following responses and plan revisions to comments dated September 11, 2018. Our Responses are in bold italic text below each comment. 1. Include the following note on the site plan:Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. Acnkowledged.See note 1,C1.0. Please refer to attached documents for further evaluation of this item. 2. Include the following note on the site plan:All site plantings of trees and shrubs shall be allowed to reach,and be maintained at, mature height;the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. Anknowledged.Site plan now includes the above note,see note 2,C1.0. 3. Provide in the plan set details on the new lighting. Include the cut sheets for the new fixtures. Indicate lamp type,fixture color,and total lumens emitted by the fixtures. Provide a photometric diagram. Acknowledged. Cut sheets and light details are included in the architectual L I N E documentation. G ` /\ D E 4. Final approval ofARB-2018-95 is required prior to final approval of the Letter CIVIL ENGINEERING of Revision. Following are the ARB conditions of approval: a. Provide material and color samples for review. 113 4th St NE Ste 100 CHARLOTTESVILLE,VA 22902 See Architectural documentation. 434.242.0169 LINE-GRADE.COM • 4•101 \ad Plaza 285 Comment Responses to Initial Plan Review August 31, 20181 Page 2 b. Indicate the locations of mechanical equipment and show how visibility will be eliminated from the EC street. See Architectural documentation. c. Provide details on all new lighting for review. Please note:no site lighting shall change. Only building mounted lights will be added. Cut sheets for lights are attached. d. Confirm that all landscaping shown on the approved site plan is present on site. If trees or shrubs are missing, they will need to be replaced,or proposed revisions will need to be included in a site plan amendment. See Architectural documentation. We have advised the property owner to replace(in kind)any landscaping features that are missing. We have also added note 3, C1.0. e. A site plan amendment (Letter of Revision) is required for all changes proposed to site elements, including but not limited to lighting, landscaping,sidewalks, ramps, etc. Awknowledged.See LOR documents. f. Include the standard plant health note on the site plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." See comment response above from comment#2. L I IV E + GRADE CIVIL ENGINEERING