HomeMy WebLinkAboutSUB201500119 Bond Reduction 2018-11-09Project Name: SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan #: SUB201500119
Item
No. Unit
Unit Cost
Cost
% complete
cost remaining
Road Name: Winding Road
Begin station
10+00.00
End station
18+50.0.�6
road length
850.0
ft
aggregate base
4.0 in d
850.0 ft L
25.01ft W
495.8 ton
$35.00
$17,354.17
50%
$8,677.08
blotted or prime&double seal
850.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
3.0 in d
850.0 ft L
25.0 ft W
390.5 tons
$100.00
$39,046.88
50%
$19,523.44
asphalt surface _in d
850.0 ftL
25.0 ft W
260.3 tons
$120.00
$31,237.50
0%
$31,237.50
curb CG-2
0.0 ft
$13.00
$0.00
0%
$0.00
curb CG-6
1700.0 ft
$15.00
$25,500.00
60%
$10,200.00
sidewalk, concrete (6)
1600.0 ft
$17.00
$27,200.00
0%
$27,200.00
ramp CG-12
6 ft
$350.00
$2,100.00
80%
$420.00
street name sign
2 each
$200.00
$400.00
80%
$80.00
traffic control sign
2 each
$200.00
$400.00
80%
$80.00
Street Landscape
27 Each
27 each
$150.00
$4,050.00
20%
$3,240.00
guardrail
0 ES C
3000
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
16 each
$3,500.00
$56,000.00
50%
$28,000.00
standard manhole frame top (not inlet)
4 each
$500.00
$2,000.00
50%
$1,000.00
manhole structure (per ft. rise)
148 ft
$450.00
$66,600.00
50%
$33,300.00
pipe, rcp, cmp (15 to 48")
15.0 in dFO
ES-1,2
EC-1
1045.0 ft
$35.00
$37,575.00
50%
$18,787.50
pipe, rcp, cmp (15 to 48")
18.0 in dES-1,2
EC-1
252.0 ft
$40.00
$11,080.00
50%
$5,540.00
pipe, rcp, cmp (15 to 48")
24.0 in dES-1,2
EC-1
145.0 ft
$50.00
$8,250.00
50%
$4,125.00
pipe, rcp, cmp (15 to 48")
36.0 in d
ES-1,2
EC-1
0.0 ft
$70.00
$0.00
0%
$0.00
pipe, rcp, cmp (60 to 108")
96.0 in d
ES-1,2
EC-1
0.0 ft
$320.00
$0.00
0%
$0.00
rip -rap, placed
2.0 ft dft
L
ft W0.0
ton
$60.00
$0.00
0%
$0.00
matting, EC-2 or 3
ft L
0.0 ft W0.0
sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
ft L
0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
cy
$6.00
$0.00
0%
$0.00
fill grading
cy
$12.00
$0.00
0%
$0.00
as -built drawings (1 k + price per 0.1 mi.)
850.0 ft L
0.161 mi.
2 Isum
$2,000.00
$5,000.00
0%
$5,000.00
survey and layout (price per 0.1 mi.)
850.0 ft L
0.161 mi.
2 Isum
$2,000.00
$5,000.00
80%
$1,000.00
mobilization
-Isum
$5,000.00
$5,000.00
0%
$5,000.00
materials testing
850.0 ft L
1.7 inc of 500'
3 each
$200.00
$540.00
60%
$216.00
compaction testing
850.0 ft L
1.7 inc of 500'
3 each
$200.00
$540.00
60%
$216.00
CBR tests (1 every 0.1 mi. per road)
850.0 ft L
1.7 inc of 500'
3 each
$200.00
$540.00
60%
$216.00
stone depth inspections
850.0 ft L
1.7 inc of 500'
3 each
$200.00
$540.00
60%
$216.00
pavement inspections
850.0 ft L
1.7 inc of 500'
_ 3 each
$200.00
$540.00
60%
$216.00
pipe and drainage video inspections ($500 min)
2342 ft
$1.00
$2,342.00
60%
$936.80
VDOT surety (1 lane)
850.0 ft L
0.161 mi.
2 Lanes
$2,000.00
$6,439.39
0%
$6,439.39
VDOT maintenance fee (1 In rd, 1 yr)
850.0 ft L
0.161 mi.
2 Lanes
$150.00
$482.95
0%
$482.95
VDOT admin. Cost recovery fee(1 lane)
850.0 ft L
0.161 mi.
L 0& Lanes
$100.00
$571.97
0%
$571.97
cost sum
$356,329.86
$211,921.64
contingency
$35,632.99
$21,192.16
SUB201500119_RP_bond_est-JARevl10918.xls
Max Greene, rev.110918JA
Total
$391,970I
$233,120
3T\Community Development\Engineering Division\1-Staff Folders\anderson\040918_bonds\estimates\SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4\SUB201500119_RP_bond_est -
v110918.xis 11 /912018
Project Name: SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan #: SUB201500119
Item
No. Unit
Unit Cost
Cost
% complete
cost remaining
Road Name: Village Avenue
Begin station
10+00.00
End station
22+53.00
road length 1253.0 ft
aggregate base
8.0 in d
!
1253.0 ft L F
27.gft W
1578.8 ton
$35.00
$55,257.30
50%
$27,628.65
blotted or prime&double seal
1253.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
4.0 in d
1253.0 ft L
27.0 ft W
828.9 tons
$100.00
$82,885.95
50%
$41,442.98
asphalt surface
2.0 in d
1253.0 ft L 6
27.0 ft W
414.4 tons
$120.00
$49,731.57
0%
$49,731.57
curb CG-2
r 0.0 ft
$13.00
$0.00
0%
$0.00
curb CG-6
2325.0 ft
$15.00
$34,875.00
60%
$13,950.00
sidewalk, concrete (6)
2100.0 ft
$17.00
$35,700.00
5%
$33,915.00
ramp CG-12
4 ft
$350.00
$1,400.00
0%
$1,400.00
street name sign
1 each
$200.00
$200.00
80%
$40.00
traffic control sign
2 each
$200.00
$400.00
80%
$80.00
Street Landscape
49 Each
49 each
$150.00
$7,350.00
0%
$7,350.00
guardrail
0 ES C
3000
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
17 each
$3,500.00
$59,500.00
50%
$29,750.00
standard manhole frame top (not inlet)
5 each
$500.00
$2,500.00
50%
$1,250.00
manhole structure (per ft. rise)
181 ft
$450.00
$81,450.00
50%
$40,725.00
pipe, rcp, cmp (15 to 48")
15.0 in d
2 ES-1,2
2 EC-1
1374.0 ft
$35.00
$50,090.00
50%
$25,045.00
pipe, rcp, cmp (15 to 48")
18.0 in d
1 ES-1,2
1 EC-1
617.0 ft
$40.00
$25,680.00
50%
$12,840.00
pipe, rcp, cmp (15 to 48")
24.0 in d
0 ES-1,2
0 EC-1
338.0 ft
$50.00
$16,900.00
50%
$8,450.00
pipe, rcp, cmp (15 to 48")
36.0 in d
1 ES-1,2
1 EC-1
140.0 ft
$70.00
$10,800.00
50%
$5,400.00
pipe, rcp, cmp (60 to 108")
96.0 in d
0 ES-1,2
0 EC-1
0.0 ft
$320.00
$0.00
0%
$0.00
rip -rap, placed
2.0 ft d
.0 ft L F
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
matting, EC-2 or 3
0.0 ft L
ft W
0.0 sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
0.0 ft L
Oft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
cy
$6.00
$0.00
0%
$0.00
fill grading
cy
$12.00
$0.00
0%
$0.00
as -built drawings (1 k + price per 0.1 mi.)
1253.0 ft L
0.2373 mi.
3 Isum
$2,000.00
$7,000.00
0%
$7,000.00
survey and layout (price per 0.1 mi.)
1253.0 ft L
0.2373 mi.
3 Isum
$2,000.00
$7,000.00
80%
$1,400.00
mobilization
-Isum
$5,000.00
$0.00
0%
$0.00
materials testing
1253.0 ft L
2.506 inc of 500'
4 each
$200.00
$720.00
60%
$288.00
compaction testing
1253.0 ft L
2.506 inc of 500'
4 each
$200.00
$720.00
60%
$288.00
CBR tests (1 every 0.1 mi. per road)
1253.0 ft L
2.506 inc of 500'
4 each
$200.00
$720.00
60%
$288.00
stone depth inspections
1253.0 ft L
2.506 inc of 500'
4 each
$200.00
$720.00
60%
$288.00
pavement inspections
1253.0 ft L
2.506 inc of 500'
4 each
$200.00
$720.00
60%
$288.00
pipe and drainage video inspections ($500 min)
1276 ft
$1.00
$1,276.00
60%
$510.40
VDOT surety (1 lane)
1253.0 ft L
0.2373 mi.
2 Lanes
$2,000.00
$9,492.42
0%
$9,492.42
VDOT maintenance fee (1 In rd, 1 yr)
1253.0 ft L
0.2373 mi.
Lanes
$150.00
$711.93
0%
$711.93
VDOT admin. Cost recovery fee(1 lane)
1253.0 ft L
0.2373 mi.
Lanes
$100.00
$724.62
0%
$724.62
cost sum
$544,524.80
$320,277.57
contingency
$54,452.48
$32,027.76
SUB201500119_RP_bond_est-JARevl 10918.xls
Max Greene, rev. 110918JA
Total
$598,980 I
$352,310
3T\Community Development\Engineering Division\1-Staff Folders\anderson\040918_bonds\estimates\SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4\SUB201500119_RP_bond_est -
v110918.xis 11 /912018
Project Name: SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan #: SUB201500119
Item
No. Unit
Unit Cost
Cost
% complete
cost remaining
Road Name: Steamers Drive
Begin station
9+00.00
End station
24+50.0.Qj
road length 1550.0 ft
aggregate base
8.0 in d
1550.0 ft L
25.0 ft W
1808.3 ton
$35.00
$63,291.67
50%
$31,645.83
blotted or prime&double seal
1550.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
4.0 in d
1550.0 ft L
25.0 ft W
949.4 tons
$100.00
$94,937.50
50%
$47,468.75
asphalt surface
2.0 in d
1550.0 ft L
25.0 ft W
474.7 tons
$120.00
$56,962.50
0%
$56,962.50
curb CG-2
r 0.0 ft
$13.00
$0.00
0%
$0.00
curb CG-6
2750.0 ft
$15.00
$41,250.00
60%
$16,500.00
sidewalk, concrete (6)
2200.0 ft
$17.00
$37,400.00
20%
$29,920.00
ramp CG-12
2 ft
$350.00
$700.00
80%
$140.00
street name sign
2 each
$200.00
$400.00
80%
$80.00
traffic control sign
2 each
$200.00
$400.00
80%
$80.00
Street Landscape
58 Each
58 each
$150.00
$8,700.00
15%
$7,395.00
guardrail
0 ES C
3000
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
13 each
$3,500.00
$45,500.00
50%
$22,750.00
standard manhole frame top (not inlet)
2 each
$500.00
$1,000.00
50%
$500.00
manhole structure (per ft. rise)
0 ft
$450.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
15.0 in d
2 ES-1,2
2 EC-1
1727.0 ft
$35.00
$62,445.00
50%
$31,222.50
pipe, rcp, cmp (15 to 48")
18.0 in d
1 ES-1,2
1 EC-1
119.0 ft
$40.00
$5,760.00
50%
$2,880.00
pipe, rcp, cmp (15 to 48")
24.0 in d
0 ES-1,2
0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
36.0 in d
0 ES-1,2
0 EC-1
0.0 ft
$70.00
$0.00
0%
$0.00
pipe, rcp, cmp (60 to 108")
96.0 in d
0 ES-1,2
0 EC-1
ft
$320.00
$0.00
0%
$0.00
rip -rap, placed
2.0 ft d
.0 ft L F
0.0 ft W
--.0
0.0 ton
$60.00
$0.00
0%
$0.00
matting, EC-2 or 3
0.0 ft L
ft W
0.0 sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
0.0 ft L
Aft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
cy
$6.00
$0.00
0%
$0.00
fill grading
cy
$12.00
$0.00
0%
$0.00
as -built drawings (1 k + price per 0.1 mi.)
1550.0 ft L
0.2936 mi.
3 Isum
$2,000.00
$7,000.00
0%
$7,000.00
survey and layout (price per 0.1 mi.)
1550.0 ft L
0.2936 mi.
3 Isum
$2,000.00
$7,000.00
80%
$1,400.00
mobilization
-Isum
$5,000.00
$0.00
0%
$0.00
materials testing
1550.0 ft L
3.1 inc of 500'
4 each
$200.00
$820.00
60%
$328.00
compaction testing
1550.0 ft L
3.1 inc of 500'
4 each
$200.00
$820.00
60%
$328.00
CBR tests (1 every 0.1 mi. per road)
1550.0 ft L
3.1 inc of 500'
4 each
$200.00
$820.00
60%
$328.00
stone depth inspections
1550.0 ft L
3.1 inc of 500'
4 each
$200.00
$820.00
60%
$328.00
pavement inspections
1550.0 ft L
3.1 inc of 500'
4 each
$200.00
$820.00
60%
$328.00
pipe and drainage video inspections ($500 min)
18460 ft
$1.00
$18,460.00
60%
$7,384.00
VDOT surety (1 lane)
1550.0 ft L
0.2936 mi.
2 Lanes
$2,000.00
$11,742.42
0%
$11,742.42
VDOT maintenance fee (1 In rd, 1 yr)
1550.0 ft L
0.2936 mi.
2 Lanes
$150.00
$880.68
0%
$880.68
VDOT admin. Cost recovery fee(1 lane)
1550.0 ft L
0.2936 mi.
Lanes
$100.00
$837.12
0%
$837.12
cost sum
$468,766.89
$278,428.81
contingency
$46,876.69
$27,842.88
SUB201500119_RP_bond_est-JARevl10918.xls
Max Greene, rev.110918JA
Total
$515,650I
$306,280
3T\Community Development\Engineering Division\1-Staff Folders\anderson\040918_bonds\estimates\SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4\SUB201500119_RP_bond_est -
v110918.xis 11 /912018
Project Name: SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan #: SUB201500119
Item
No. Unit
Unit Cost
Cost
% complete
cost remaining
Road Name: Sweetgum Lane
Begin station
10+00.00
End station
12+31.00_
road length 231.0 ft
aggregate base
4.0 in d
231.0 ft L
25.0 ft W
134.8 ton
$35.00
$4,716.25
50%
$2,358.13
blotted or prime&double seal
231.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
3.0 in d
231.0 ft L
25.0 ft W
106.1 tons
$100.00
$10,611.56
50%
$5,305.78
asphalt surface min d
231.0 ft L
25.0 ft W
70.7 tons
$120.00
$8,489.25
0%
$8,489.25
curb CG-2
0.0 ft
$13.00
$0.00
0%
$0.00
curb CG-6
460.0 ft
$15.00
$6,900.00
60%
$2,760.00
sidewalk, concrete (6)
230.0 ft
$17.00
$3,910.00
0%
$3,910.00
ramp CG-12
0 ft
$350.00
$0.00
0%
$0.00
street name sign
2 each
$200.00
$400.00
80%
$80.00
traffic control sign
2 each
$200.00
$400.00
80%
$80.00
Street Landscape
7 Each
7 each
$150.00
$1,050.00
0%
$1,050.00
guardrail
0 ES C
3000
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
0 each
$3,500.00
$0.00
0%
$0.00
standard manhole frame top (not inlet)
0 each
$500.00
$0.00
0%
$0.00
manhole structure (per ft. rise)
0 ft
$450.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
15.0 in d
0 ES-1,2
0 EC-1
0.0 ft
$35.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
18.0 in d100.
0 ES-1,2
0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
24.0 in d0
ES-1,2
0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
36.0 in d0
ES-1,2
0 EC-1
0.0 ft
$70.00
$0.00
0%
$0.00
pipe, rcp, cmp (60 to 108")
96.0 in d0
ES-1,2
0 EC-1
0.0 ft
$320.00
$0.00
0%
$0.00
rip -rap, placed
2.0 ft d.0
ft L F
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
matting, EC-2 or 3
.0 ft L
0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
0 ft L
0.4ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
cy
$6.00
$0.00
0%
$0.00
fill grading
cy
$12.00
$0.00
0%
$0.00
as -built drawings (1 k + price per 0.1 mi.)
231.0 ft L
0.0438 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
survey and layout (price per 0.1 mi.)
231.0 ft L
0.0438 mi.
1 Isum
$2,000.00
$3,000.00
80%
$600.00
mobilization
-Isum
$5,000.00
$0.00
0%
$0.00
materials testing
231.0 ft L
0.462 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
compaction testing
231.0 ft L
0.462 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
CBR tests (1 every 0.1 mi. per road)
231.0 ft L
0.462 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
stone depth inspections
231.0 ft L
0.462 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
pavement inspections
231.0 ft L
0.462 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
pipe and drainage video inspections ($500 min)
0 ft
$1.00
$0.00
60%
$0.00
VDOT surety (1 lane)
231.0 ft L
0.0438 mi.
2 Lanes
$2,000.00
$1,750.00
0%
$1,750.00
VDOT maintenance fee (1 In rd, 1 yr)
231.0 ft L
0.0438 mi.
2 Lanes
$150.00
$131.25
0%
$131.25
VDOT admin. Cost recovery fee(1 lane)
231.0 ft L
0.0438 mi.
Lanes
$100.00
$337.50
0%
$337.50
cost sum
$46,165.81
$30,451.91
contingency
$4,619.58
$3,045.19
SUB201500119_RP_bond_est-JARevl 10918.xls
Max Greene, rev. 1 10918JA
Total
$50,820 I
$33,500
3T\Community Development\Engineering Division\1-Staff Folders\anderson\040918_bonds\estimates\SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4\SUB201500119_RP_bond_est -
v110918.xis 11 /912018
Project Name: SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan #: SUB201500119
Item
Road Name: Sycamore Lane
Begin station
10+14.0
End station
12+62.00
aggregate base
4.0 in d
blotted or prime&double seal
asphalt base
3.0 in d
asphalt surface
2.0 in d
curb CG-2
curb CG-6
sidewalk, concrete (6)
ramp CG-12
street name sign
traffic control sign
Street Landscape
guardrail
drop inlet or grate
standard manhole frame top (not inlet)
manhole structure (per ft. rise)
pipe, rcp, cmp (15 to 48")
15.0 in d
pipe, rcp, cmp (15 to 48")
18.0 in d
pipe, rcp, cmp (15 to 48")
24.0 in d
pipe, rcp, cmp (15 to 48")
36.0 in d
pipe, rcp, cmp (60 to 108")
96.0 in d
rip -rap, placed
2.0 ft d
matting, EC-2 or 3
clear and grub (for wooded sites)
cut grading
fill grading
as -built drawings (1 k + price per 0.1 mi.)
survey and layout (price per 0.1 mi.)
mobilization
materials testing
compaction testing
CBR tests (1 every 0.1 mi. per road)
stone depth inspections
pavement inspections
pipe and drainage video inspections ($500 min)
VDOT surety (1 lane)
VDOT maintenance fee (1 In rd, 1 yr)
VDOT admin. Cost recovery fee(1 lane)
SUB201500119_RP_bond_est-JARevl 10918.xls
Max Greene, rev. 110918JA
No. Unit Unit Cost Cost
% complete cost remaining
road length 248.0 ft
248.0 ft L
25.0 ft W
144.7 ton
$35.00
$5,063.33
50%
$2,531.67
248.0 ft L L0.0
ft W
0.0 sy
$10.00
$0.00
0%
$0.00
248.0 ft L
25.0 ft W
113.9 tons
$100.00
$11,392.50
50%
$5,696.25
248.0 ft L 1
25.0 ft W
76.0 tons
$120.00
$9,114.00
0%
$9,114.00
0.0 ft
$13.00
$0.00
0%
$0.00
450.0 ft
$15.00
$6,750.00
60%
$2,700.00
450.0 ft
$17.00
$7,650.00
0%
$7,650.00
4 ft
$350.00
$1,400.00
0%
$1,400.00
2 each
$200.00
$400.00
80%
$80.00
2 each
$200.00
$400.00
80%
$80.00
9 Each
9 each
$150.00
$1,350.00
0%
$1,350.00
0 ES Ca
3000
0.0 ft
$17.00
$0.00
0%
$0.00
2 each
$3,500.00
$7,000.00
50%
$3,500.00
0 each
$500.00
$0.00
0%
$0.00
2 ft
$450.00
$1,080.00
50%
$540.00
0 ES-1,2
0 EC-1
118.0 ft
$35.00
$4,130.00
0%
$4,130.00
0 ES-1,2
0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
0 ES-1,2
0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
0 ES-1,2
0 EC-1
0.0 ft
$70.00
$0.00
0%
$0.00
0 ES-1,2
0 EC-1
0.0 ft
$320.00
$0.00
0%
$0.00
0 ft L
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
0.0 ft L
ft W
0.0 sy
$2.00
$0.00
0%
$0.00
0.0 ft L
Aft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
-cY
$6.00
$0.00
0%
$0.00
cy
$12.00
$0.00
0%
$0.00
248.0 ft L
0.047 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
248.0 ft L
0.047 mi.
1 Isum
$2,000.00
$3,000.00
80%
$600.00
-Isum
$5,000.00
$0.00
0%
$0.00
248.0 ft L
0.496 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
248.0 ft L
0.496 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
248.0 ft L
0.496 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
248.0 ft L
0.496 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
248.0 ft L
0.496 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
118 ft
$1.00
$118.00
60%
$47.20
248.0 ft L
0.047 mi.
2 Lanes
$2,000.00
$1,878.79
0%
$1,878.79
248.0 ftL
0.047 mi.
Lanes
$150.00
$140.91
0%
$140.91
248.0 ft L
0.047 mi.
Lanes
$100.00
$343.94
0%
$343.94
$65,711.47
$45,382.75
cost sum
contingency
$6,571.15
$4,538.28
Total
$72,290
$49,930
3T\Community Development\Engineering Division\1-Staff Folders\anderson\040918_bonds\estimates\SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4\SUB201500119_RP_bond_est -
v110918.xis 11 /912018
Project Name: SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan #: SUB201500119
Item
No. Unit
Unit Cost
Cost
% complete
cost remaining
Road Name: Private Alley "A"
Begin station
10+26.00
End station
12+50.00
road length 224.0 ft
aggregate base
4.0 in d
224.0 ft L
24.0 ft W
125.4 ton
$35.00
$4,390.40
50%
$2,195.20
blotted or prime&double seal
224.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
3.0 in d
224.0 ft L
24.0 ft W
98.8 tons
$100.00
$9,878.40
50%
$4,939.20
asphalt surface
2.0 in d
224.0 ft L r
24.0 ft W
65.9 tons
$120.00
$7,902.72
0%
$7,902.72
curb CG-2
IIF 448.0 ft
$13.00
$5,824.00
60%
$2,329.60
curb CG-6
0.0 ft
$15.00
$0.00
0%
$0.00
sidewalk, concrete (6)
0.0 ft
$17.00
$0.00
0%
$0.00
ramp CG-12
0 ft
$350.00
$0.00
0%
$0.00
street name sign
2 each
$200.00
$400.00
0%
$400.00
traffic control sign
2 each
$200.00
$400.00
80%
$80.00
Street Landscape
0 Each
0 each
$150.00
$0.00
0%
$0.00
guardrail
0 ES C
3000
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
1 each
$3,500.00
$3,500.00
50%
$1,750.00
standard manhole frame top (not inlet)
0 each
$500.00
$0.00
0%
$0.00
manhole structure (per ft. rise)
7 ft
$450.00
$3,330.00
50%
$1,665.00
pipe, rcp, cmp (15 to 48")
15.0 in d
0 ES-1,2
0 EC-1
129.0 ft
$35.00
$4,515.00
0%
$4,515.00
pipe, rcp, cmp (15 to 48")
18.0 in d100.
0 ES-1,2
0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
24.0 in d0
ES-1,2
0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
36.0 in d0
ES-1,2
0 EC-1
0.0 ft
$70.00
$0.00
0%
$0.00
pipe, rcp, cmp (60 to 108")
96.0 in d0
ES-1,2
0 EC-1
0.0 ft
$320.00
$0.00
0%
$0.00
rip -rap, placed
2.0 ft d.0
ft L F
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
matting, EC-2 or 3
.0 ft L
0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
0 ft L
0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
cy
$6.00
$0.00
0%
$0.00
fill grading
cy
$12.00
$0.00
0%
$0.00
as -built drawings (1 k + price per 0.1 mi.)
224.0 ft L
0.0424 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
survey and layout (price per 0.1 mi.)
224.0 ft L
0.0424 mi.
1 Isum
$2,000.00
$3,000.00
80%
$600.00
mobilization
-Isum
$5,000.00
$0.00
0%
$0.00
materials testing
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
compaction testing
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
CBR tests (1 every 0.1 mi. per road)
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
stone depth inspections
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
pavement inspections
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
pipe and drainage video inspections ($500 min)
129 ft
$1.00
$129.00
60%
$51.60
VDOT surety (1 lane)
224.0 ft L
0.0424 mi.
0 Lanes
$2,000.00
$0.00
0%
$0.00
VDOT maintenance fee (1 In rd, 1 yr)
224.0 ft L
0.0424 mi.
0 Lanes
$150.00
$0.00
0%
$0.00
VDOT admin. Cost recovery fee(1 lane)
224.0 ft L
0.0424 mi.
& Lanes
$100.00
$0.00
0%
$0.00
cost sum
$47,769.52
$30,028.32
contingency
$4,776.95
$3,002.83
SUB201500119_RP_bond_est-JARevl 10918.xls
Max Greene, rev. 110918JA
Total
$52,550 I
$33,040
3T\Community Development\Engineering Division\1-Staff Folders\anderson\040918_bonds\estimates\SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4\SUB201500119_RP_bond_est -
v110918.xis 11 /912018
Project Name: SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan #: SUB201500119
Item
No. Unit
Unit Cost
Cost
% complete
cost remaining
Road Name: Private Alley "B"
Begin station
10+26.00
End station
12+50.00
road length 224.0 ft
aggregate base
4.0 in d
224.0 ft L
0.0 ft W
0.0 ton
$35.00
$0.00
0%
$0.00
blotted or prime&double seal
224.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
3.0 in d
224.0 ft L
0.0 ft W
0.0 tons
$100.00
$0.00
0%
$0.00
asphalt surface
2.0 in d
224.0 ft L
0.0 ft W
0.0 tons
$120.00
$0.00
0%
$0.00
curb CG-2
224.0 ft
$13.00
$2,912.00
60%
$1,164.80
curb CG-6
0.0 ft
$15.00
$0.00
0%
$0.00
sidewalk, concrete (6)
0.0 ft
$17.00
$0.00
0%
$0.00
ramp CG-12
0 ft
$350.00
$0.00
0%
$0.00
street name sign
2 each
$200.00
$400.00
0%
$400.00
traffic control sign
2 each
$200.00
$400.00
80%
$80.00
Street Landscape
0 Each
0 each
$150.00
$0.00
0%
$0.00
guardrail
0 ES C
3000
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
2 each
$3,500.00
$7,000.00
50%
$3,500.00
standard manhole frame top (not inlet)
0 each
$500.00
$0.00
0%
$0.00
manhole structure (per ft. rise)
12 ft
$450.00
$5,580.00
50%
$2,790.00
pipe, rcp, cmp (15 to 48")
15.0 in d
0 ES-1,2
0 EC-1
109.0 ft
$35.00
$3,815.00
50%
$1,907.50
pipe, rcp, cmp (15 to 48")
18.0 in d100.
0 ES-1,2
0 EC-1
39.0 ft
$40.00
$1,560.00
50%
$780.00
pipe, rcp, cmp (15 to 48")
24.0 in d0
ES-1,2
0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
36.0 in d0
ES-1,2
0 EC-1
0.0 ft
$70.00
$0.00
0%
$0.00
pipe, rcp, cmp (60 to 108")
96.0 in d0
ES-1,2
0 EC-1
0.0 ft
$320.00
$0.00
0%
$0.00
rip -rap, placed
2.0 ft d.0
ft L F
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
matting, EC-2 or 3
.0 ft L
0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
0 ft L
0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
cy
$6.00
$0.00
0%
$0.00
fill grading
cy
$12.00
$0.00
0%
$0.00
as -built drawings (1 k + price per 0.1 mi.)
224.0 ft L
0.0424 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
survey and layout (price per 0.1 mi.)
224.0 ft L
0.0424 mi.
1 Isum
$2,000.00
$3,000.00
80%
$600.00
mobilization
-Isum
$5,000.00
$0.00
0%
$0.00
materials testing
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
compaction testing
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
CBR tests (1 every 0.1 mi. per road)
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
stone depth inspections
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
pavement inspections
224.0 ft L
0.448 inc of 500'
2 each
$200.00
$300.00
60%
$120.00
pipe and drainage video inspections ($500 min)
_
148 ft
$1.00
$148.00
60%
$59.20
VDOT surety (1 lane)
224.0 ft L
0.0424 mi.
0 Lanes
$2,000.00
$0.00
0%
$0.00
VDOT maintenance fee (1 In rd, 1 yr)
224.0 ft L
0.0424 mi.
0 Lanes
$150.00
$0.00
0%
$0.00
VDOT admin. Cost recovery fee(1 lane)
224.0 ft L
0.0424 mi.
L _.A Lanes
$100.00
$0.00
0%
$0.00
cost sum
$29,315.00
$14,881.50 1
contingency
$2,931.50
$1,488.15
SUB201500119_RP_bond_est-JARevl 10918.xls
Max Greene, rev. 110918JA
Total
$32,250 I
$16,370
3T\Community Development\Engineering Division\1-Staff Folders\anderson\040918_bonds\estimates\SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4\SUB201500119_RP_bond_est -
v110918.xis 11 /912018
Project Name: SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan #: SUB201500119
Item
No. Unit
Unit Cost
Cost
% complete
cost remaining
Road Name: Private Alley "C"
Begin station
10+00.00
End station
14+32.00
road length 422.0 ft
aggregate base
4.0 in d
422.0 ft L
24.0 ft W
236.3 ton
$35.00
$8,271.20
50%
$4,135.60
blotted or prime&double seal
422.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
3.0 in d
422.0 ft L
24.0 ft W
186.1 tons
$100.00
$18,610.20
50%
$9,305.10
asphalt surface
2.0 in d
422.0 ft L r
24.0 ft W
124.1 tons
$120.00
$14,888.16
0%
$14,888.16
curb CG-2
422.0 ft
$13.00
$5,486.00
60%
$2,194.40
curb CG-6
0.0 ft
$15.00
$0.00
0%
$0.00
sidewalk, concrete (6)
0.0 ft
$17.00
$0.00
0%
$0.00
ramp CG-12
0 ft
$350.00
$0.00
0%
$0.00
street name sign
2 each
$200.00
$400.00
0%
$400.00
traffic control sign
2 each
$200.00
$400.00
0%
$400.00
Street Landscape
0 Each
0 each
$150.00
$0.00
0%
$0.00
guardrail
0 ES C
3000
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
3 each
$3,500.00
$10,500.00
50%
$5,250.00
standard manhole frame top (not inlet)
0 each
$500.00
$0.00
0%
$0.00
manhole structure (per ft. rise)
22 ft
$450.00
$9,990.00
50%
$4,995.00
pipe, rcp, cmp (15 to 48")
15.0 in d
0 ES-1,2
0 EC-1
283.0 ft
$35.00
$9,905.00
50%
$4,952.50
pipe, rcp, cmp (15 to 48")
18.0 in d
0 ES-1,2
0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
24.0 in d
0 ES-1,2
0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48")
36.0 in d
0 ES-1,2
0 EC-1
0.0 ft
$70.00
$0.00
0%
$0.00
pipe, rcp, cmp (60 to 108")
96.0 in d
0 ES-1,2
0 EC-1
0.0 ft
$320.00
$0.00
0%
$0.00
rip -rap, placed
2.0 ft d
.0 ft L F
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
matting, EC-2 or 3
0.0 ft L
ft W
0.0 sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
0.0 ft L
�ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
cy
$6.00
$0.00
0%
$0.00
fill grading
cy
$12.00
$0.00
0%
$0.00
as -built drawings (1 k + price per 0.1 mi.)
422.0 ft L
0.0799 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
survey and layout (price per 0.1 mi.)
422.0 ft L
0.0799 mi.
1 Isum
$2,000.00
$3,000.00
80%
$600.00
mobilization
-Isum
$5,000.00
$0.00
0%
$0.00
materials testing
422.0 ft L
0.844 inc of 500'
2 each
$200.00
$380.00
60%
$152.00
compaction testing
422.0 ft L
0.844 inc of 500'
2 each
$200.00
$380.00
60%
$152.00
CBR tests (1 every 0.1 mi. per road)
422.0 ft L
0.844 inc of 500'
2 each
$200.00
$380.00
60%
$152.00
stone depth inspections
422.0 ft L
0.844 inc of 500'
2 each
$200.00
$380.00
60%
$152.00
pavement inspections
422.0 ft L
0.844 inc of 500'
2 each
$200.00
$380.00
60%
$152.00
pipe and drainage video inspections ($500 min)
283 ft
$1.00
$283.00
60%
$113.20
VDOT surety (1 lane)
422.0 ft L
0.0799 mi.
0 Lanes
$2,000.00
$0.00
0%
$0.00
VDOT maintenance fee (1 In rd, 1 yr)
422.0 ft L
0.0799 mi.
Lanes
$150.00
$0.00
0%
$0.00
VDOT admin. Cost recovery fee(1 lane)
422.0 ft L
0.0799 mi.
Lanes
$100.00
$0.00
0%
$0.00
cost sum
$86,633.56
$50,993.96
contingency
$8,663.36
$5,099.40
SUB201500119_RP_bond_est-JARevl 10918.xls
Max Greene, rev. 1 10918JA
Total
$95,300 I
$56,100
3T\Community Development\Engineering Division\1-Staff Folders\anderson\040918_bonds\estimates\SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4\SUB201500119_RP_bond_est -
v110918.xis 11 /912018
Project Name: SUB201500119 -Rivanna Village Phase 1 and parts of Phase 3 & 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan #: SUB201500119
Item
Road Name: Private Alley "D"
Begin station
10+00.00
End station
18+34.00
aggregate base
4.0 in d
blotted or prime&double seal
asphalt base
3.0 in d
asphalt surface
2&in d
curb CG-2
curb CG-6
sidewalk, concrete (6)
ramp CG-12
street name sign
traffic control sign
Street Landscape
guardrail
drop inlet or grate
standard manhole frame top (not inlet)
manhole structure (per ft. rise)
pipe, rcp, cmp (15 to 48")
15.0 in d
pipe, rcp, cmp (15 to 48")
18.0 in d
pipe, rcp, cmp (15 to 48")
24.0 in d
pipe, rcp, cmp (15 to 48")
36.0 in d
pipe, rcp, cmp (60 to 108")
96.0 in d
rip -rap, placed
2.0 ft d
matting, EC-2 or 3
clear and grub (for wooded sites)
cut grading
fill grading
as -built drawings (1 k + price per 0.1 mi.)
survey and layout (price per 0.1 mi.)
mobilization
materials testing
compaction testing
CBR tests (1 every 0.1 mi. per road)
stone depth inspections
pavement inspections
pipe and drainage video inspections ($500 min)
VDOT surety (1 lane)
VDOT maintenance fee (1 In rd, 1 yr)
VDOT admin. Cost recovery fee(1 lane)
SUB201500119_RP_bond_est-JARevl 10918.xls
Max Greene, rev. 110918JA
No. Unit Unit Cost Cost
% complete cost remaining
road length 834.0 ft
834.0
ft L
14.01ft W
272.4 ton
$35.00
$9,535.40
50%
$4,767.70
834.0
ft L L0.0
ft W
0.0 sy
$10.00
$0.00
0%
$0.00
834.0
ft L
14.0 ft W
214.5 tons
$100.00
$21,454.65
50%
$10,727.33
834.0
ft L
.0 ft W
143.0 tons
$120.00
$17,163.72
0%
$17,163.72
0.0 ft
$13.00
$0.00
0%
$0.00
0.0 ft
$15.00
$0.00
0%
$0.00
0.0 ft
$17.00
$0.00
0%
$0.00
0 ft
$350.00
$0.00
0%
$0.00
0 each
$200.00
$0.00
0%
$0.00
0 each
$200.00
$0.00
0%
$0.00
0
Each
0 each
$150.00
$0.00
0%
$0.00
0
ES Ca
3000
0.0 ft
$17.00
$0.00
0%
$0.00
0 each
$3,500.00
$0.00
0%
$0.00
0 each
$500.00
$0.00
0%
$0.00
0 ft
$450.00
$0.00
0%
$0.00
0
ES-1,2
0 EC-1
0.0 ft
$35.00
$0.00
0%
$0.00
0
ES-1,2
0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
0
ES-1,2
0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
0
ES-1,2
0 EC-1
0.0 ft
$70.00
$0.00
0%
$0.00
0
ES-1,2
0 EC-1
0.0 ft
$320.00
$0.00
0%
$0.00
0
ft L
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
0.0
ft L
ft W
0.0 sy
$2.00
$0.00
0%
$0.00
0.0
ft L
Aft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
-cY
$6.00
$0.00
0%
$0.00
cy
$12.00
$0.00
0%
$0.00
834.0
ft L
0.158 mi.
2 Isum
$2,000.00
$5,000.00
0%
$5,000.00
834.0
ft L
0.158 mi.
2 Isum
$2,000.00
$5,000.00
80%
$1,000.00
-Isum
$5,000.00
$0.00
0%
$0.00
834.0
ft L
1.668 inc of 500'
3 each
$200.00
$540.00
60%
$216.00
834.0
ft L
1.668 inc of 500'
3 each
$200.00
$540.00
60%
$216.00
834.0
ft L
1.668 inc of 500'
3 each
$200.00
$540.00
60%
$216.00
834.0
ft L
1.668 inc of 500'
3 each
$200.00
$540.00
60%
$216.00
834.0
ft L
1.668 inc of 500'
3 each
$200.00
$540.00
60%
$216.00
0 ft
$1.00
$0.00
60%
$0.00
834.0
ft L
0.158 mi.
0 Lanes
$2,000.00
$0.00
0%
$0.00
834.0
ft L
0.158 mi.
Lanes
$150.00
$0.00
0%
$0.00
834.0
ft L
0.158 mi.
Lanes
$100.00
$0.00
0%
$0.00
$60,853.77
$39,738.75
cost sum
contingency
$6,085.38
$3,973.87
Total
$66,940
$43,720