Loading...
HomeMy WebLinkAboutARB201800145 Application 2018-11-14Albemarle County Planning Application Commt,nityDevelopmentGep.arimelt 431 AtcicttireRoadCharlottesvilie.VA22-OW-45-03 Voice: (434) 293-5632 Fax: (434) 372-4123 TMPI OSSEO-QI-Lei}-OOOA3 owner(s)- MARCH MOUNTAIN PROPERTIES LLC Application # ARB201800145 Legal Description I �T�L OLD= 24, 33, & 34 Magisterial Dist. ; White Hall Land Use Primary Unassigned +. Current AFD Not in A/F District � Current Zoning Primary Neighborhood Model District APPLICATION INFORMATION Street Address. Entered By Application Type Suck Smith Architectural Review ward Project OLD TRAIL VILLAGE ENTRY SIGNAGE Received Data 10/29/1$ Received Date Final -� Submittal Date rj0�31]$ Total Fees Closing File Date Submittal Date Final Total Raid Revision Number Comments Legal Ad SUB APPLICATION(s) County -wide LfghtWg .._......_..,..._.. _ .. .,... .... _ ...._.�..... __ ..._._ _...__...w....,.... _., ...._ ._............._ _. _... - -.._ ......._._.. _ _ ...._._.... .. .... -_ APPLICANT [ CONTACT INFORMATION Signature of Contractor or Authorized Agent Date Architectural Review Board Application 0 Part A: Applicant, Contact and Parcel Information type Project Name: Old Trail Village Entry Signage Tax map and parcel(s): 55E Parcel 1 -Al & 01- 00OA3 Physical Street Address: NA Contact Person: David Brockman Business Name: March Mountain Properties Address 1005 Heathercroft Circle, Suite 100 City Crozet Daytime Phone C__) 702-985-9088 Fax# (____) state VA Zip 22932 E-mail info@oldtrailvillage.net OwnerofRecord: March Mountain Properties, LLC No Fee Address 1005 Heathercroft Circle, Suite 100 City Crozet Daytime Phone C__) 434-823-8100 Fax# L_) state va Zip 22932 E-mail info@oldtrailvillage.net I Part B: Review TVDe and Fee I Select review type Review by the Architectural Review Board Conceptual Plan/Advisory Review (for a Special Use Permit or a No Fee Rezoning) Preliminary/Initial Review of a Site Development Plan No Fee Final Review of a Site Development Plan $1075.00 Amendment to an approved Certificate of Appropriateness $ 242.00 Building Permit Review $ 634.00 County -wide Certificate of Appropriateness Structures 750' or more from the EC, no taller than 5 stories No Fee Structures located behind a structure that fronts the EC No Fee Personal wireless service facilities No Fee X Fencing or Equipment or Lighting No Fee Additions to ARB -approved buildings No Fee Minor amendments to site or architectural plans No Fee Building permits where the change is 50% or less of the altered elevation No Fee NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS. FOR OFFICE USE ONLY BP# ARB# Fee Amount $ Date Paid By who? Receipt # Check # By County of Albemarle Dept of Community Development, 401 McIntire Rd, Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 9724126 1012015 Pegs 1 of 2 OVER -i j Part C: Description of Proposal IDescribe your proposal. Attach a separate sheet if necessary. To provide 12' tall pedestrian lighting at back of sidewalk along Old Trail Drive from route 250 to the slabtown creek crossing. I Part D: Applicant Agreement I Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist, completed, signed, and included with the required submittal materials indicated on the checklist. I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. *See submittal requirements bel . 1 also certify that the information provided on this application and accompanying information is accuraiFe, and correct to the best of my knowledge, and that the attached plans cont all migrmation tequiresi-1�`ne�prornate checklist. 94riature of owner, owner' or contract purchaser David Brockman Date 702-985-9088 Printed name, Title Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of legal entity or organization including, but not limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious name, a document acceptable to the County must be submitted certifying that the person signing above has the authority to do so. • If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. • If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scone of the asencv. Attach the owner's written consent. 112010 Page 2 of 2 OVER Architectural Review Board Checklist of Submittal Requirements t' COUNTY -WIDE CERTIFICATE OF APPROPRIATENESS Lighting Part A: Applicant Information Project name: Old Trail village - Old Trail Drive Pedestrian lighting Contact person: Dave Brockman Part B: Submittal Requirements Note: Submittal packages must contain 2 collated & folded copies of all information unless otherwise indicated. A. Written description of the proposal 1 ® Provide a general description of all proposed work. 2 ® Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. Site plan drawn to the scale of 1 "=20' showing the following: (This plan must be clearly legible. it may be a sketch, but it must be accurate and to scale) 10 Location of all proposed lighting to be installed. 20 Location of all existing lighting, with indication of lighting to be removed and/or relocated. C. Landscape plan showing the following (drams to the scale of 1'=20' and clearly legible): 10 If landscaping is to be removed, show existing landscaping and identify plants to be removed. Include the location, size, and species. 20 Proposed landscaping, if any. Include the location, size, and species. 30 Location and height of above -ground utilities and associated easements, and location of below - ground utilities and associated easements. 49 Coordination of lighting with landscaping, utilities, and other site elements. D. Lighting plan showing the following (drawn to the scale of 1 "=20' and clearly legible): 1 ® Location of proposed building and site lighting. 2 ® Manufacturer's cut sheets with a diagram of the proposed fixture(s) sufficient to determine if it is a full cutoff fixture. Include cut sheets as a sheet of the site plan set. 3 ® Lighting schedule identifying all proposed light fixtures, poles and brackets. Identify illumination type, intensity, style, shielding, color, finish, and installation height. 4 ® Photometric plan addressing all fixtures and indicating that lighting meets the requirements of section 4.17 of the Zoning Ordinance. LLF must equal 1.0. F. Additional material 1 ❑ If equipment is building -mounted, provide building elevations, drawn to the scale of 1/8" = 1', showing equipment locations. 2 ® Labeled, color 8'/" x 11" photos of the site as seen from both directions on the Entrance Corridor. 3 ® Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. 4 ® Any additional material that will make the review more productive. Clarification of topography, visibility, utilities, landscaping, or other unique or unusual conditions is welcome. Revised 7/06/10 — 1 OVER -40' I Part C: Applicant Agreement Applicant must read and sign I Each application package must contain 2 folded and collated copies of all plans and documents being submitted. Only 1 set of building material samples is required. All submittal items, including samples, become the property of Albemarle County. Applicants should maintain duplicate copies for their own use. • All information in this checklist is required before review begins. Additional submittal materials may be required, depending on the proposal. • Following verification that a submittal is complete, the proposal will be reviewed according to established guidelines. Applicants are encouraged to thoroughly review those guidelines prior to completing a design and making a submittal. Visit www.albemarle.or-q for more information. In representing the above referenced dim submitting this application for review, 1 hereby state that the informatio rovided in this applicafi , and all accompanying information, is accurate, true and correct to the best my kn a attached plans contain all ' formtion required by this checklist. Signature of person pleting checklist Date David Brockman - EVP Development 702-985-9088 Printed Name/ Title Daytime phone number of Signatory Part D: Partial Guidelines for Lighting Design NOTE: The information that follows is a condensed version of the guidelines and criteria that apply to fighting design in the Entrance Corridors. For complete information go to: www.albomarle.org. Light should be contained on the site, should not spill over onto adjacent properties or streets, and should be shielded, recessed or flush -mounted to eliminate glare. Planting may be required to reduce impacts of glare. • Fixtures and poles should have a dark brown, dark bronze or black finish. Other dark colors, if coordinated with the building (for example, hunter green), may be approved. • Pole height shall be compatible with building height. Typically, height shall not exceed 20'. 15' is appropriate for most uses. • Height and intensity of rooftop lights shall be minimized to the greatest extent possible. Light shall not spill outside the walls of the structure. • Special restnctions (for example, the use of dimmers for night-time illumination) may be applied to LED lighting to ensure that the intensity of the illumination is maintained at appropriate levels • Additional restrictions apply to lighting intended for decorative effect. • Consult the Entrance Corridor Design Guidelines for more information. County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA 22902-4596; (434) 296-5832 Tel, (434) 97214126 Fax www.albemarle.org Revised 710617 0 -- 2 OVER—)"