Loading...
HomeMy WebLinkAboutWPO201700061 Action Letter 2018-11-15 (2)Qm pftn Notice to .Cwp& ❑ Slop Work Bond Mop ❑ Under SWO ❑ ReinspecCM (feel ❑ SWPPP INSPECTION Project Name: e J 'f o �, V I)d 5 File Number.-WPO r2 d qevh6 DEQ General Permit Number County Inspector. P b inspection Date: it Time: . For Warnings or Abdo s, DATE TO COMPLY BY Initial controls ❑ Clearing ❑ Baugh Grading ❑ Comstrudion [9 'FmM [trading ;1 stawmean ❑ mn conversion 0 carpbow Yea lib Posting at th site entrance available for letter ��� I ✓ Camments/Notes The coverage letter and SWPPP book location must be posted In a prominent place at the entrance to the job'site, available to the public on request. must be available A current coverage letter must A registration statement must be Included that goes with the coverage letter. The acreage disturbed must be accurate. A copy of the pollution prevention plan and a copy of the current DEQ permit code must be Included in the SWPPP. The plan must be marked to show location of measures. Reports must be up-to-date, informative. documenting problems, and occurring at required intervals. Rain events and inspections for rain events must be noted. inspection tion / s Results of inspectlons must be followed up with corrective acwhere necessary reporlo/corre ctive actions Fueft Fueling stations must be contained, and spill prevention and deanup kits station in place WashoutftA lined sump area must be provided for any concrete washout. Washout facilities for paint, grouts, etc. are also needed. Trash and Trash and debris must be cleaned up so that It does not leave the job site. Any debris contaminates must be protected from becoming runoff during rains (cover dumpsters). Trash is not to be buried on -site. from inlets. Erosion and Sediment Control and Siormwater Management Par plans and Standards must be provided and and protected from spills, away Compliant Notice to Comply [ Stop Work S Bond lnsp [ Warning ❑ Under NTC [ Under SWO ❑ Re -inspection (fee) C Erosion Control Inspection Report Project Name: (q'V4 a BP Number: 4P607,o00i524f. Location Contractor County inspector: -,T41I pn t!' Inspection Date: "1 Lot # For Warnings or Notices, DATE TO COMPLY BY Agreement # Initial controls ❑ Clearing ❑ Rough Grading ❑ Constructiorj Finish Grading Stabilization ❑ swm conversion ❑ ►fang A� CommentsMotes Silt, safety, tree fence ------ -- --- Diversions, Berms, ditches ! Inlet, culvert- i protection Stream work, ,icrosins 11` Traps, -.—_ .------- -- ---- --- _- - _- Basins Stabilization Entrances I Limits --- - - - --- --.� i Washout--- — -- -. —._-------._.��_.�,__--_._------------------ -_ -----1 Disposal j Solid Waste - - - - - - ---- --- — -- --- - -- I Disposal Waste Fuel/Oi1 Storage SWPPP Compliance Permit - Posting -- --- ---I