VSMPNESCP PERMIT SITE INSPECTION REPORT
COVERAGE & POSTING REQUIREMENTS +Yes+ No IN/AI Reviewed during re4nspectlon? ❑Yes []No
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2 pNotice
the notice of coverage letter is posted conspicuously near the
ance of the construction activity? (CGP Part II.C)
the location of the SWPPP isposted near the site's entrance, if
3 , and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS +Yes+ No IN/AI Reviewed during re -inspection? ❑Yes []No
4 The SWPPP is on -site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5 The SWPPP contains a signed copy of the registration statement?
(CGP Part 11 A.1.a)
B The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
Page 1 of 7
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part Ii
AAA)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
The SWPPP contains the name, phone number and qualifications of
8 "Qualified Personnel" conducting inspections? (CGP Part II A.6)
10 The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part Ii.A.2)
The SWPPP contains an approved stormwater management plan or an
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria iLB ❑ Ii.0 ❑
+13concem,
e SWPPP contains an adequate pollution prevention plan? (9VAC25-
G 54.D)(CGP Part Ii.A.4)
e SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
exceptional waters and the additional controls measures
plicable? (9VAC 25-870-54.E)(CGP Part IiA.5 (a-b))
14 Delegation of Authority is provided and signed in accordance with Part iIi l
K? (CGP Part II A.7)
15 The SWPPP is signed and dated in accordance with Part IiI K? (CGP Part
iI A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
is the SWPPP being amended whenever there is a change in the design,
16 construction, operation, or maintenance that has a significant effect on the
_ischarge of pollutants to surface waters? (CGP Part iI 8(7))(9VAC25-870-
Has the SWPPP been amended if inspections or investigations by the
17 perator's qualified personnel, or by local, state or federal officials find that
xisting control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part 11 B(2))(9VAC25-870-54.G)
18 ontractor(s) that will implement and maintain each control measure are
dentified? (CGP Part 11 B(3))(9VAC25-870-54.G)
ave there been updates to the SWPPP when any modifications to its
mplementation have occurred, including a record of dates when major
19 rading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
art 11 B.4(a))(9VAC25-870-54.G)
s there documentation in the SWPPP of replaced or modified controls?
20 (CGP Part 11 B.4(b))(9VAC25-870-54.G)
21 is the SWPPP updated to indicate areas that have reached final
tabilization? (CGP Part 118.4(c))(9VA(325=870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 egal control of the operator and the dates on which the operator no longer
adGl) gal control over each property? (CGP Part 11 BA(d))(9VAC25-870-
Does the SWPPP identify the date of any prohibited discharges, the
23 olume released, actions taken to minimize the impact of the release and
easures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-0) (9VAC25-870-54.G)
24 mendments, modifications, or updates to the SWPPP are signed in
ccordance with Part IIi K? (CGP Part 11 B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS IYesl No
No IN/AI Reviewed during inspection? ❑Yes []No
Reviewed during inspection? ❑Yes ❑No
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), appm
TMDL(s) and exceptional waters when applicable? (COP Part 11 F (2))
(COP Part II A.5.b.3)
26 Inspection reports are completed and signed in accordance with COP
Part Il F (3-4)? (CGP Part Il F (3-4))
27 Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
28 1 Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29 approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.8 and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30 approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC2:
880-60) (CGP Part I F.1(a)) (CGP Part 11 A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1 2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part Il
A permanent vegetative cover has been established that is uniform,
32 mature enough to survive and will inhibit erosion? (9VAC 25-84040.3)
(CGP Part Il A.2(c)) (CGP If E(1-2)) (9VAC25-870-64.B)
Have sediment trapping facilities been constructed as the first step in lai
33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP 11
Have earthen structures been stabilized immediately after installation?
34 (9VAC 25-134040.5) (CGP Part II A.2(c)) (CGP 11 E(12)) (9VAC25-870-
Are sediment traps and basins installed in accordance with MS-6 and the
35 approved plan? (9VAC 25-840-40.6) (CGP Part If A.2.c (9)) (CGP Part If
A.2(c)) (CGP Il E(1-2)) (9VAC25-870- 4.8)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36 excessive erosion? (9VAC 25-840-40.7) (CGP Part It A.2(c)) (CGP II E(1-
Is concentrated runoff down cut or fill slopes contained in an adequate
37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-970-54.81
Is adequate drainage or other protection provided for water seeps?
38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1 2)) (9VAC25-870-
Do all operational storm sewer inlets have adequate inlet protection?
39 (9VAC 25-8413 40.10) (CGP Part 11 A.2(c)) (CGP li E(1-2)) (9VAC25-870-
54.B)
Are stormwater conveyance channels adequately stabilized with channel
40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
(CGP 11 E(1 2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP 11 E(1-2))
Are temporary stream crossings of non -erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part Il A.2(c)) (CGP 11 E(1-2))
43 Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP If E(1-2)) (9VAC25-870-54.B)
No jAVAI Reviewed during inspection? ❑Yes []No
M
Page 3 of 7
44 1 Are utility trench operations conducted and stabilized in accordance with
MS-16? (9VAC 25-840-40.16) (CGP Part Il A.2(c)) (CGP If E(1-2))
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP Il E(1-2))
Have all temporary control structures that are no longer needed been
46 removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part 11 A.2(c)) (CGP It E(1-2))
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-nll
48 Permanent control measures included in the SWPPP are in place?
(9VAC26-870-54.C) (9VAC25-8B"O) (CGP Part If F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases; and (i) procedures for
reporting leaks, spills, and other releases in accordance with Part ill G?
(CGP Part 11 AA.e(1))(9VAC25-870-56)
Practices are in place toprevent the discharge of spilled and leaked fuels
5t7 and chemicals from vehicle fueling and maintenance activities? (CGP Part 11
Practices are in place to prevent the discharge of soaps, solvents,
51 detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CG
Part 11 A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part If A.4.e(4)ll9VAC25-870-561
53 Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part 11 A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes,
(CGP Part li AA.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
(CGP Part li A.4.e(8))(9VAC25-870-56)
Inspector Signature,
Date:
No IN/AI Reviewed during inspection? ❑Yes ONo
Page 4 of 7