General
Construction. Notes
(H)
(R)
1 E
{I)
(D)
(S)
1.
The acronym VDOT refers to the Virginia Department of Transportation. •
HEIGHT.
49[1:00
488.00
H
8"
2.
All materials and construction methods shall conform" to current VDQT Road and Bridge Specifications and Standards.
Q:3
�
T T '
Q
7"
—
AII excavation for underground pipe installation must comply with, OSHA Standards for the ;Construction, Industry (29 CFR Part 1926). --- -
9 P P
`erosion
- --_-
—
(?
ROQ
BER M
R
3.
Erosion and siltation control measures shaft be provided in accordance with the approved control plan and must be installed
prior to any clearing; grading or other construction.
- _._ —
`�
RCP RISER
4.
All slopes and di turbed areas are to be fertilized, seeded and mulched. - Maximum allowable fill or cut slope is 2:1. Where reasonably
obtainable lesser slopes of 4:1 or better are to be achieved.
r S +,
5.
Paved or rip—rap.lined ditch may be required to stabilize' a drainage channel, when, .in the opinion of the Director' of Engineering or his
9 P 9
) _q91Z
" R D
15 CP
6",
INV. 483.0 ---�
designee, it is demed necessary.
Devices,
I.
TO DITCH
p
6.
for Uniforr . latest edition.
All traffic control signs shall conform with the Virginia Manual n Traffic Control
18
7.
All excavation . for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926).
` ,�
8" ORIFICE
L CONCRETE BASE
--2*
Q
z TMP 58-37
WILLIAM
0
ETl R JR
_ D.B. 596 P: 15
D.B.596
P 182 PLAT \
DETENTION
„BERM
RISER
RISER
ORIFICE
ORIFICE
PIPE,
PIPE
PIPE
TRASH
TRASH`
BASIN -
ELEVATION
ELEVATION
DIAMETER
DIAMETER,
INVERT
DIAMETEF
SLOPE
LENGTH
RACK
RACK ;
(E)
(H)
(R)
(0)
{I)
(D)
(S)
(L)
DIA:
HEIGHT.
49[1:00
488.00
15"
8"
483.00
15"
Q:3
33.8' .
, 21 "
7"