HomeMy WebLinkAboutWPO201800013 Permit WPO VSMP 2018-09-27 Registration Statement
General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10)
(Please Type or Print All Information)
1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item #12 must be
signed by the appropriate person associated with this operator.)
Name:Riverbend Development,Inc.
Contact:Alan Taylor
Mailing Address:455 Second Street SE,#400
City: Charlottesville State: VA Zip: 22902 Phone: (434)245-4932
Email address(if available): alan@riverbenddev.com
Indicate if DEQ may transmit general permit correspondence electronically: Yes Do No 0
2. Existing General Permit Registration Number(for renewals only):N/A
3. Name and Location of the Construction Activity:
Name: Brookhill Residential Development
Address(if available): 2571 &2575 Seminole Trail
City:Charlottesville State: VA Zip:22902
County(if not located within a City):Albemarle County
Latitude(decimal degrees):78°27'17.77 Longitude(decimal degrees): 38°06'13.47
Name and Location of all Off-site Support Activities to be covered under the general permit:
Name:
Address(if available):
City: State: Zip:
County(if not located within a City):
Latitude(decimal degrees): Longitude(decimal degrees):
4. Status of the Construction Activity(check only one): Federal 0 State 0 Public 0 Private El
5. Nature of the Construction Activity(e.g.,commercial,industrial,residential,agricultural,oil and gas,etc.):
Residential Development
6. Name of the Receiving Water(s)and Hydrologic Unit Code(HUC):
Name: South For Rivanna River Name:
HUC: JR08 HUC:
7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator:
County of Albemarle
8. Estimated Project Start and Completion Date:
Start Date(mm/dd/yyyy): 9/1/18 Completion Date(mm/dd/yyyy): 9/1/19
9. Total Land Area of Development(to the nearest one-hundredth acre): 275 Acres
Estimated Area to be Disturbed(to the nearest one-hundredth acre): 54.34 AC
10. Is the area to be disturbed part of a larger common plan of development or sale? Yes® No 0
11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General
VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement.
By signing this Registration Statement the operator is certifying that the SWPPP has been prepared.
12. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document
and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and
evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons
directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true,
accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of
fine and imprisonment for knowing violations."
Printed Name: I n R. aylor Title: President
Signature: Date: 9/27/18
(Please sign in I K. This Ce ification must be signed by the appropriate person associated with the operator identified in
Item#1.)
07/2014 Page 1 of 1