Loading...
HomeMy WebLinkAboutWPO201800058 Bond Estimates WPO VSMP 2018-09-10 LINE -I- G R A D E CIVIL ENGINEERING MEMORANDUM TO: County of Albemarle Department of Community Development 401 McIntire Road Charlottesville,VA 22902 FROM: Daniel C. Hyer, PE Line and Grade I Engineer of Record DATE: September 10th, 2018 RE: WP0201800058 Foglia Residence-VSMP Signature Submission On behalf of Green Mountain Construction,we submit the above referenced conditionally approved plan for signature, along with a bond estimate request form and fee. Please find the following documentation attached: 2—Foglia Residence VSMP plan with original ink seal and signature 1—Bond Estimate Request Form (Signed) 1—Bond Estimate Request Fee -$250, Check#:12444 Please email rcheney@line-grade.com or contact our office with any questions or concerns. LINE + GRADE CIVIL ENGINEERING 113 4th St.NE;STE 100 CHARLOTTESVILLE,VA 22902 TEL:(434)262-0169 LINE-GRADE.COM Project Name: Foglia Residence VSMP Plan WPO file number: WP0201800058 TM P(s): 08800-00-00-003DO Date Estimate Completed: 09/28/18 Stormwater Management Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rep, cmp (15 to 48") aggregate base or drainage stone earthwork for trap/basin structures for basin in d ES -1,2 in d ftL height of dam at toe 1 0 ft height of fill at face 0 ft length of dam 0 ft top width ft No. Unit Unit Cost Cost 0 ft installed �ft (area above transition; 0 sf (total width of dam) 0 ft (height below transitioi 0 ft (area below transition) 0 sf (total fill volume) 0.0 cy length spillway �ft width off spillway 0 ft riser height 4 ft riser diameter 36 in barrel length 110 ft barrel diameter 18 in No. Unit Unit Cost Cost 0 ft installed �ft 0 ft $13.00 $0.00 0 as $500.00 $0.00 0 as $3,500.00 $0.00 ft $450.00 $0.00 EC -1 Emik $0.00 $0.00 ' ft W 0.0 ton $35.00 $0.00 cul at high side 0 ft cul at face 0 ft length cul �ft width off cut ft (area below transition 0 sf (total width of cut) 0 ft (depth below transitio 0 ft (area above transitior 0 sf (total fill volume) 0.0 cy (TOAL CY estimate) 0 cy (spillway stone tons) 0 tons (riser unit price) $70.00 base plate or fdn _ (barrel unit price) $40.00 barrel collars Mft baffle length trees shrubs seedlings = Equivalent Estim: 0.66 lb. Ernst Southeast Rain Garden Mix; C2.2 underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) NA, drive adjacent rip -rap, placed depth ft length width (tons) survey and layout (price per 0.1 mi.) acres basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base W P0201800058_SW M_ bond_esl_Foglia Residence 092818.xlsx _ft 22.5 bioretention filter earthwork Vol., direct entry, 197 cy $13.00 $2,561.00 $50.00 $0.00 $280.00 $200.00 $200 $4,400.00 $200.00 $0 $50.00 $0 lea $275.00 $0.00 as $50.00 $0.00 as $5.00 $200.00 ft $5.00 $375.00 cy $45.00 $4,725.00 ft $1,500.00 $1,500.00 k $50.00 $0.00 $60.00 $1,350.00 $557.50 $2,500.00 1 as $2,000.00 $2,000.00 0 as $2,000.00 $0.00 0 as $3,000.00 $0.00 $0.00 cost sum $20,648.50 contingency $2,064.85 Total $22,720 9/28/2018 Project Name: Foglia Residence VSMP Plan WPO file number: WP0201800058 TM P(s): 08800-00-00-003 DO Date Estimate Completed: 09/28/18 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stablization (PS, TS) M acres $5,000.00 $17,300.00 silt fence (SF) 1611.0 ft $5.00 $8,055.00 safety fence (SAF) - tree protection, on plans 90.0 ft $5.00 $450.00 diversion (DD, FD, RWD) _ 870 ft $13.00 $11,310.00 20' Level Spreader, detail: Sheet C2.0, C3.1 matting, see detail, C3.1 20.0 ft L 20.0 ft W 44.4 sy $2.00 $88.89 1-3" DIA river stone; C3.1 depth 1.5 ft length 10.0 ft (Total, for 3) 10' x 10' stilling basin side width 4.5 (tons) 5.0625 $50.00 $253.13 1-3" DIA river stone; C3.1 depth 0.5 ft length 20.0 ft (Total, for 3) outfall side width 3.0 (tons) 2.25 $50.00 $112.50 treated timber: 6" x 6" x 16" ea. (Installed =1.5 x Material Expense) 43.0 $/Ea. 4 ea $64.50 $258.00 14' Level Spreader, detail: Sheet C2.0, C3.1 matting, see detail, C3.1 20.0 ft L 14.0 ft W 31.1 sy $2.00 $62.22 1-3" DIA river stone; C3.1 depth 1.5 ft length 7.0 ft (Total, for 3) 5' wide stilling basin side width 4.5 (tons) 3.54375 $50.00 $177.19 1-3" DIA river stone; C3.1 depth 0.5 ft length 14.0 ft (Total, for 3) outfall side width 3.0 (tons) 1.575 $50.00 $78.75 treated timber: 6" x 6" x 16" ea. (Installed =1.5 x Material Expense) 43.0 $/Ea. 3 ea $64.50 $193.50 (Ref. Google search -Lowe's treated lumber: $42.97, 5/29/18); C3.1 -stacked 3 high temporary slope drain (TSD) pipe length -ft pipe diameter lip"Fa in $0.00 earthwork for trap/basin height of dam at toeft cut at high side 14 ft height of fill at faceoft ft cut at face 5 ft length of damft length of cut 120 ft top width width of cut it (area above transition) 4.5 sf (area below transition, 140 sf (total width of dam) 9 ft (total width of cut) 56 ft (height below transition) 3 ft (depth below transitioi 9 ft (area below transition) 4.5 sf (area above transition 171 sf (total fill volume) 40.0 cy (total fill volume) 1382.2 cy length of spillway=ftft (TOAL CY estimate) 1396 cy $13.00 $18,148.00 width of spillway (spillway stone tons) 8 tons $50.00 $400.00 structures for basin riser heightft riser diameterMin in (riser unit price) $0.00 $0.00 barrel lengthft base plate orfdn $200.00 $0 barrel diameter (barrel unit price) $0.00 $0.00 barrel collars $200.00 $0 9/28/2018 Project Name: Foglia Residence VSMP Plan WPO file number: WP0201800058 TM P(s): 08800-00-00-003 DO Date Estimate Completed: 09/28/18 Erosion and Sediment Control Bond Estimate Item Item Number silt fence inlet protection (IP) baffle length stone inlet protection (IP) $0.00 outlet protection (OP) length channel (SCC, matted) length 6,750 SF based on —30' x 225' EC -2 Area near residence, Cl.l check dam depth in channel construction entrance (CE) 3.6 ft wash rack 10.0 ft paved construction entrance (tons) rip -rap, placed depth Culvert A width rip -rap, placed depth BMP Outfall, CIA width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) WP0201800058_ESC_bond_est_Foglia Residence 092818.xlsx No. Unit Unit Cost Cost installed $50.00 $0 $100.00 $0.00 $200.00 $0.00 $0.00 $0.00 $8,775.00 $146.25 baffle length lir"'0 ft $0.00 width 0 ft Ift ft width 1 ft 1 ft channel width 6.5 ft 3.6 ft length 10.0 ft 8.0 (tons) tons 3.6 ft length MM"A ft a (tons) 13.455 tons 0 traps and basins — No. Unit Unit Cost Cost installed $50.00 $0 $100.00 $0.00 $200.00 $0.00 $0.00 $0.00 $8,775.00 $146.25 $1,023.75 $2,500.00 $0.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $60.00 $993.60 $60.00 $807.30 $500.00 $2,500.00 $0.00 cost sum $76,986.82 contingency $7,698.68 Total $84,690 9/28/2018