Loading...
HomeMy WebLinkAboutSUB201500119 Action Letter 2018-11-18SUB20150011.9 -Rivanna Village Phase 1 and parts of Phase 3 & 4 B. Tri-State Video Report Index of View Sessions with observational remarks Video comments that require clarification /additional detail -joint angular, joint separated, water level sag 14 Joint Separated, Joint Angular, Water Level Sag (Tri-State) Video Review remarks require quantitative detail for comparison with VDOT Standards Please ref. Tri-State Pipe Summary Report Sheet, Chesterfield Landing, Ph 1, SLTB201500111, for example of detail Tri-State may be able to provide.* * Attached to Rivanna Village Phase 1 bond reduction inspection checklist transmittal Memo, 18-Nov 2018. of Particular Note Manhole Pipe station at point of Session # date Numbers Pipe Length observation Comment Comment disc 1 9/25/2018 D5 to D4 100 7.9 Pipe broken 4 25-Sep D2 to DI 67.4 57.6 Water Level Sag 5 25-Sep K2 to Kl 150.6 4 Joint Angular 8 25-Sep F4 to F3 107.1 102 Water Level Sag - 25-Sep F3-1 to F3 66.8 45.4 Joint Separated, Large 9 25-Sep F3-1 to F3 66.8 62 Water Level Sag, Moderate 13 9/26/2018 B3 to B2 130.3 88.5 Joint Angular 20 26-Sep A10-1 to A10 118.6 81.6 Joint Angular 38 9/27/2018 A5-3 to A5-2 67 6.8 Joint Angular 40 9/28/2018 Nl to A5-1 32 2 Water Level Sag 41 28-Sep A5-1 to A5 64.4 17.1 Joint Separated, Medium 41 28-Sep A5-1 to A5 64.4 19 Joint Angular 41 28-Sep A5-1 to A5 64.4 58.6 Joint Separated, Large 42 28-Sep A5-2 to A5-1 187.1 178.5 Joint Separated, Medium Session # disc 2 11 10/29/2018 G3-1 to G3 64 16.7 Deformation, heavy 25 10/30/2018 H5 to H6 31.6 26 Water Level Sag A. SUB2015-00119, Rivanna Village Phase 1 Construction Testing Reports, September 21, 201E No listing for a report type does not indicate construction did not meet project specifications, or report not included All Reports: Viola Engineering PC Item Road /Alley Name Report types Note: Construction reports are comprehensive 1 Winding Road P, C, D, CR, BS, A, AD, CBR Asphalt field report' A 2 Village Ave P, C, D, CR, BS, A, CBR Asphalt depth AD 3 Steamer Dr. P, C, D, CR, BS, A, AD, CBR Base -stone field report BS 4 Alley'C' P, C, D, CR, BS Compaction field report C 5 Sycamore P, C, D Concrete field report /strength CR 6 Sweet Gum CR, BS, A California Bearing Ration lab report CBR 7 Alley'A' CR, BS, A Density (Proctor /ASTM D698) D 8 Alley'B' CR, BS, A Proof -roll field report 9 Sedgewick CR, P, BS, A 10 Alley'D' BS SUB2or500119 -Rivanna Village Phase r Tri-State video 11 1818ja.xlsx