Loading...
HomeMy WebLinkAboutSUB201800172 Checklist - Project Closeout (Administrative) Preliminary Plat 2018-11-16 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please com s ete this form within 30 days of final action,place in folder and forward to CDA FOR QC and sta b•1. CDA willforwardto the Imaging Center for digital closeout. SDP/.UB# i AP-1 PROJEC ITLE 11114 V if(i,� , / 5/x,6A ph74- FUL • • OF LEAD REVIEWE S FINAL ACTION DATE: //-41 Coun iew- pplication,Page 2 Data Entered ElStaff R- .. i ., .-. ,•cs„ Hardcopy—File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. EI-"Engineg Folder Information/documentation INC Scan 0 Saved location pplication •gnature copy) Scan 0 Saved location [ blic N • cation records/Abutting Owner correspondence Scan 0 Saved location E - licantrrespondence(to/from,memos/emails) [Scan 0 Saved location ( -Complete of printed Review Comments Scan 0 Saved location [9Approved plat(signed,or stamped"Approved"with Planner/Engineer name) Scan 0 Saved location [ Action Le (Administrative Approval) [Scan 0 Saved location CliVilite-Effretoe- BOS Meeting Package-Staff Report(include plan/plat presented,PCBOS Action Letter) I^1 /'`� ❑ Scan 0 Saved location 1 1 lirouu water 's stems O Scan 0 Saved location n Oth (ries"- xr 1 ;,, ; P C tidies) ❑ Scan 0 Saved location O -i.e:Studies) ❑ Scan 0 Saved location ❑ At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be clearly marked as unapproved and contain a note clarifying why it was included. i ❑ Scan 0 Saved location �� Additional Information on this project: Y }