Loading...
HomeMy WebLinkAboutARB201800153 Review Comments Architectural Review Board Approval 2018-11-29Heather McMahon From: Heather McMahon Sent: Thursday, November 29, 2018 3:22 PM To: Michele Cc: Jack Degagne Subject: ARB2018-153: Longhonr Steakhouse Initial, resubmission -- application incomplete Attachments: ARB2018-153 Preliminary SDP Checklist for Completeness.pdf Hello Michele and Jack, I have just checked your application package for completeness and it is incomplete. Review cannot commence until the missing information is provided and the application is deemed complete. 8 hardcopies of a complete site plan set are required for a full review of an Initial Site Plan. Your scheduled ARB meeting date may be postponed if copies are not received in a timely manner. Please see the attached checklist for the areas in which your application is deficit. Furthermore, your previous submittal of an Initial Site Plan included the following: Sheet # Drawing Name Drawing Date C1.1 Cover Sheet 8/27/18 C2.1 General Notes/Tree Conservation Plan 8/27/18 C2.2 Demolition Plan 8/27/18 C2.3 Site Plan 8/27/18 C2.4 Grading Plan 8/27/18 C2.5 Drainage & Utility Plan A 8/27/18 C2.6 Drainage & Utility Plan B 8/27/18 C3.1 Utility Profiles (Storm) 8/27/18 C3.2 Utility Profiles (Sanitary) 8/27/18 C3.3 Utility Profiles (Sanitary) 8/27/18 C4.1 Lighting Plan 8/27/18 C4.2 Lighting Plan Details 8/27/18 C5.1 Soil Erosion & Sediment Control Plan 8/27/18 C5.2 Soil Erosion & Sediment Control Notes & Details 8/27/18 C6.1 Construction Details 8/27/18 C6.2 Construction Details 8/27/18 C6.3 Construction Details 8/27/18 C6.4 Construction Details 8/27/18 C6.5 Construction Details 8/27/18 C6.6 Construction Details 8/27/18 C7.1 Soil Boring Logs 8/27/18 C8.1 Vehicle Circulation Plan (WB-67) 8/27/18 C8.2 Vehicle Circulation Plan (Refuse) 8/27/18 1-1.1 Landscape Plan 8/27/18 1-1.2 Landscape Plan Notes & Details 8/27/18 Sheet 1 of 2 Survey 7/25/18 Sheet 2 of 2 Survey 7/25/18 A1.1 Dimensioned Floor Plan 8/27/18 A1.2 Noted Floor Plan 8/27/18 A3.1 Roof Plan 8/27/18 A4.2 Schedule, Notes and Details 8/27/18 A5.1 Exterior Elevations 8/27/18 A5.2 Exterior Elevations 8/27/18 n.p. Color renderings (2 pages) 6/25/18 p. 1-15 Sign permit drawings 6/12/18 n.p. Manufacturer's specifications on lighting n.d. Material samples boards (2) n.d. In contrast, this submittal includes the following: n.p. Color renderings (2 pages) 11/19/18 T1.1 Title Sheet 8/27/18 C2.3 Site Plan 11/20/18 C4.1 Lighting Plan 11/20/18 1-1.1 Landscape Plan 11/20/18 A3.1 Roof Plan 8/27/18 A5.1 I Exterior Elevations 8/27/18 A5.2 I Exterior Elevations 8/27/18 At the least, your site plan must include the following missing sheets for ARB review (and they must be the latest revisions, facsimiles of those submitted to Chris Perez, the lead planner on your Site Review Committee): C1.1 Cover Sheet C2.1 General Notes/Tree Conservation Plan C2.2 Demolition Plan C2.3 Site Plan C2.4 Grading Plan C2.5 Drainage & Utility Plan A C2.6 Drainage & Utility Plan B C4.1 Lighting Plan C4.2 Lighting Plan Details 1-1.1 Landscape Plan 1-1.2 Landscape Plan Notes & Details A1.1 Dimensioned Floor Plan A1.2 Noted Floor Plan Please let me know if you would like to defer this project or when I can expect to receive 8 hardcopies of a complete site plan set and architectural drawings. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org ARB2018-153: Longhorn Steakhouse, Preliminary HNM 11/29/18 Architectural Review Board Preliminary Site Development Plan Checklist for Completeness ® 8 collated copies A. Written description of the proposal ® Provide a general description of all proposed work. ❑ Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. Site plan showing the following (drawn to the scale off "=20', clearly legible and folded): ® Location(s) of proposed building(s) on the site. ® Schematic layout of parking, travelways, and other improvements ❑I Location of existing and proposed tree lines. Individually identify trees of a 6-inch caliper or greater. [ Commented [HM1]: N/A ❑ Existing and proposed topography drawn with contour intervals of 2-feet, and with sufficient off -site Commented [HM2]: Not provided topography to describe prominent and pertinent off -site features and physical characteristics, but in no case less than 50-feet outside of the site. ❑� Location and size of existing and proposed utilities and easements. Identify type of utility and extent Commented [HM3]: Not provided of easement. ❑ Conceptual stormwater management plan. Commented [HMa]: Not provided ® Conceptual landscaping that meets or exceeds the requirements outlined in the ARB guidelines. ® Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. C. Appearance of the proposed building(s) ® Show a representation of the appearance of the proposed building(s). This must include architectural elevations drawn to the scale of at least 1/16"=1'-0". This may also include perspective sketches, or photos of the proposed building(s). These documents should provide a basic understanding of: ® The size, form, and scale of the building. ® The architectural style of the building. ® The proposed building materials and color(s). D. Additional material ❑ Provide labeled, color, 8-'/2" x 11" photographs of the site as seen from both directions on the Entrance Corridor. ❑ The applicant is welcome to submit any additional material that will make the preliminary review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. ❑ Site sections may be useful. ® Signatures