Loading...
HomeMy WebLinkAboutWPO201400067 Bond Reduction 2018-11-30 (2)Project Name: Amendment to WP0201400067 for Covenant Church WPO file number: WP0201400067 T M P: 06100-00-00-15500 Date Estimate Completed: 11/30/18 Stormwater Management Plan Bond Estimate -reduction from original $50,000 SWM bond to cover new work Item Item Number 1 permanent diversion or ditch 2 earthwork for trap/basin(bioretention) 3 height of dam at toe 0 ft cut at high side 0 ft 4 height of fill at face 0 ft cut at face 0 ft 5 length of dam 0 ft length of cut 0 ft 6 top width 0 ft width of cut 0 ft 7 (area above transition) 0 sf (area below transition 0 sf 8 (total width of dam) 0 ft (total width of cut) 0 ft 9 (height below transition) 0 ft (depth below transitioi 0 ft 10 (area below transition) 0 sf (area above transition 0 sf 11 *Earthwork: o o243 Ac -fr roo-yr max pond storage (C-504) (total fill volume) =� cy (total cut volume) _cy 12 length of spillway 0 ft (TOAL CY estimate) 0 cy 13 width of spillway 0 ft (spillway stone tons) 0 tons 14 structures for basin (DETENTION POND) -concrete wall 15 Estimate based on Allied Concrete quote, 11-30-18: riser height ft 16 $153 cy delivered price, 3000 psi concrete product riser diameter in (riser unit price) $0.00 17 Conservative dimensions (w/o footer): loo' x V w x 3' h barrel length ft base plate or fdn 18 Reasonable Labor estimate - formwork. s2000 barrel diameter in (barrel unit price) $0.00 19 outfall -pipe end section 20 standard manhole frame top (not inlet) 21 manhole structure (per ft. rise) 22 trees 23 shrubs 24 seedlings 25 underdrain (LF) 26 biofilter soil mix (CY) 27 trash rack/ anti vortex devices 28 Maintenance Access road (LF) 29 rip -rap, placed depth ft length ft 30 width (tons) 31 rip -rap, placed depth ft length ft 32 width (tons) 33 4" depth choker stone depth ft length ft 34 width (tons) 35 biofilter 28" stone depth; see bio-retention schedule, C8 depth ft length ft 36 width (tons) 0 37 survey and layout (price per 0.1 mi.) acres 0.25 basins (detention) 1 38 mobilization 39 as -built drawings (per facility) 40 materials testing (per facility) 41 compaction testing (per dam) J. Anderson, 11/30/18 WP0201400067-Covenant Church Amend SWM_bond_113018 No. Unit Unit Cost installed 0 ft $13.00 $0.00 40 cy $13.00 $520.00 $50.00 $0.00 11.11 cy $153.00 $3,699.83 $0.00 $200 $0 $0.00 0 each $500.00 $0.00 0 each $500.00 $0.00 0 ft $450.00 $0.00 ea $150.00 $0.00 ea $50.00 $0.00 ea $5.00 $0.00 ft $5.00 $0.00 cy $38.00 $0.00 ea $1,500.00 $0.00 ft $50.00 $0.00 $60.00 $0.00 $60.00 $0.00 $25.00 $0.00 $35.00 $0.00 Cost $625.00 $500.00 1 ea $2,000.00 $2,000.00 0 ea $2,000.00 $0.00 0 ea $5,000.00 $0.00 cost sum $7,344.83 proj mgmt $0.00 contingency $734.48 Total $8,080 11 /30/2018