Date Estimate Completed: 11/30/18
Erosion and Sediment Control Bond Estimate -reduction from original $22,000 ESC bond to cover new work
Item Item
Number
stablization (PS, TS)
silt fence (SF)
safety fence (SAF)
diversion (DID, FD, RWD)
temporary slope drain (TSD)
earthwork for trap #1, Sta. o+oo
Excavated Vol. by Michael Baker Intl.
silt fence inlet protection (IP)
stone inlet protection (IP)
pipe length
-ft
height of dam at toe
height of fill at faceOft
ft
length of damft
top width
ft
(area above transition;
0 sf
(total width of dam)
0 ft
(height below transitioi
0 ft
(area below transition)
0 sf
(total fill volume)
0.0 cy
length of spillway
width of spillway
_ft
ft
pipe diameter �in
cut at high side ft
cut at face
ft
length of cutOft
ft
width of cut
(area below transitic
0 sf
(total width of cut)
0 ft
(depth below transit!
0 ft
(area above transiti<
0 sf
(total fill volume)
0.0 cy
(TOAL CY estimate;
0 cy
(spillway stone tons
12.9 tons
outlet protection (OP)
length
width
(SCC, matted) -B/M Areas
length
Mftft
ft
width
ft
Oftftchannel
check dam
depth in channel
channel width
construction entrance (CE)
wash rack
paved construction entrance
rip -rap, placed
depth
ft
IF
length
-ft
width
(tons)
0 tons
survey and layout (price per 0.1 mi.)
acres
0
traps and basins
-
mobilization
stream crossing (computed independently)
WP0201400067 Covenant Church -Amendment 113018
No. Unit
Unit Cost
Cost
installed
0.5 acres
$5,000.00
$2,500.00
160.0 ft
$5.00
$800.00
0.0 ft
$5.00
$0.00
0 ft
$13.00
$0.00
$0.00
$0.00
111 cy
E
$13.00
$50.00
$100.00
$200.00
$506.25
$0.00
$2,500.00
$2,000.00
$3,500.00
$60.00
$1,443.00
$645.00
$0.00
$200.00
$1,012.50
$0.00
$0.00
$2,500.00
$0.00
$0.00
$0.00
$500.00
$2,500.00
cost sum
$12,100.50
contingency
$1,210.05
Total
$13,320