Loading...
HomeMy WebLinkAboutWPO201400067 Bond Reduction 2018-11-30Project Name: Amendment to WP0201400067 for Covenant Church WPO file number: WP0201400067 TM P : 06100-00-00-15500 Date Estimate Completed: 11/30/18 Erosion and Sediment Control Bond Estimate -reduction from original $22,000 ESC bond to cover new work Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) temporary slope drain (TSD) earthwork for trap #1, Sta. o+oo Excavated Vol. by Michael Baker Intl. silt fence inlet protection (IP) stone inlet protection (IP) pipe length -ft height of dam at toe height of fill at faceOft ft length of damft top width ft (area above transition; 0 sf (total width of dam) 0 ft (height below transitioi 0 ft (area below transition) 0 sf (total fill volume) 0.0 cy length of spillway width of spillway _ft ft pipe diameter �in cut at high side ft cut at face ft length of cutOft ft width of cut (area below transitic 0 sf (total width of cut) 0 ft (depth below transit! 0 ft (area above transiti< 0 sf (total fill volume) 0.0 cy (TOAL CY estimate; 0 cy (spillway stone tons 12.9 tons outlet protection (OP) length width (SCC, matted) -B/M Areas length Mftft ft width ft Oftftchannel check dam depth in channel channel width construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth ft IF length -ft width (tons) 0 tons survey and layout (price per 0.1 mi.) acres 0 traps and basins - mobilization stream crossing (computed independently) WP0201400067 Covenant Church -Amendment 113018 No. Unit Unit Cost Cost installed 0.5 acres $5,000.00 $2,500.00 160.0 ft $5.00 $800.00 0.0 ft $5.00 $0.00 0 ft $13.00 $0.00 $0.00 $0.00 111 cy E $13.00 $50.00 $100.00 $200.00 $506.25 $0.00 $2,500.00 $2,000.00 $3,500.00 $60.00 $1,443.00 $645.00 $0.00 $200.00 $1,012.50 $0.00 $0.00 $2,500.00 $0.00 $0.00 $0.00 $500.00 $2,500.00 cost sum $12,100.50 contingency $1,210.05 Total $13,320 11 /30/2018