Loading...
HomeMy WebLinkAboutWPO201800054 Action Letter 2018-12-047rx:; SWPPP INSPECTION SffiP l 0 WWI gl [A►xw)VrC[ Und ar SHO Re-�r�,peift pW) [ r Projed Name: 1 O Q K File Number: a D pU[i S DEG General Permit Nwnber. Y Inspector. Irnspection Date: Time: For WamhVs or Apices, DATE TD CDIIlPL V BY foal controls ❑ Ciea ft ❑ Route Grad lPt- Const ucft Ikleh Grading ❑ Stabftwon ❑ wn mwersim o Post at thi site enhanoa avall" for raapoonon , 1 t/ scone i ne coverage loner and SWPPP book location must be posted In a prominent piece at the entrance to the job site, available to the pubfic on request. currant coverage A registration statement must be Ind acreage disturbed must be aoauate. r Inspection on4ite )18) must be inquded goes with the Coverage be ku�uded in.fFte SWP�. Theplan musf be marked � show 7and' Reports must be up-0-date, informative, documenting prebtecnsoocuning at required intervals. Rain events and Inspections for rainevents me nosed. Results of inspections must be followed up won corrective actions wt a necessary station Fueling stations must be cordained, and spill prevention and dlearwp kits In place Washouts A lined sump aree must be provkled for arty concrete washout. Washout fadlities for paint, grouts, eft. we also needed. Trash and Trash and debris must be deened up so that it does not Ieave e job sip. Any debris contaminates must be protected from becoming runoff during mains (cover dumpsters). Trash is not to be buried on -eke. from inlets. Erosion and Sediment Conhnland Stormwater Management Per plans and Standards must away Compliant ❑ Notice to Comply ❑ Stop Work ❑ Bond lnsp ❑ Waming� Under NTC ❑ Under SWO Re inspection (fee) ❑ Erosion Control Inspection Report Project Name: ��n �},f,�Q �ti BP Number: ) PO Location Contractor JT I /i County Inspector: P' Inspection Date: - Lot # For Warnings or Notices, DATE TO COMPLY BY Agreement # Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑ CommentsJNotes j Yes Mp It, safety, ��� in cl y n +c� tree fence ic �l Diversions, i Berms, ditches Inlet, culvert .protection-- -�---- --�-----__._..�_---------_...----------------------------------------.-. - _. Streamwork, i crossings_. _ _ �_._.._ Traps. - --_._ _-- ----- ---_- ._ . - Basins Entrances Limits Washout Disposal -[ Solid Waste Disposal V Sanitary Waste Fuel/Oil Storage SWPPP j Compliance r-.,r,ilit _ — — -- Posting._. _._ _ __.. - - - --- ------ --- ----- ---- -- ------ -- ---------------.-- __.-._..�--- ---- - ---�- - - --- - -- -