HomeMy WebLinkAboutSDP199700046 Action Letter Preliminary Site Plan 1997-07-23 }
• of
84.4rLIN
COUNTY OF ALBEMARLE
Department of Planning&Community Development
401 McIntire Road,Room 218
Charlottesville,Virginia 22902-4596
(804)296-5823
Fax(804)972-4035
July 23, 1997
Mr. Bruce Drummond
Dewberry&Davis
10525 Battleview Parkway
Manassas, Va. 20109
Re: SDP-97-046 UVA Research Park at North Fork
Phase I, Infrastructure Preliminary Site Plan
Dear Mr. Drummond:
The preliminary site plan for the development proposal referenced above was approved
administratively on July 23, 1997. The approval of the preliminary site plan is valid for one year
in accordance with Zoning Ordinance Section 32.4.3.1. A final subdivision plat must be
submitted to the Department of Planning and Community Development before expiration of the
preliminary site plan or at time of dedication of road right-of-way,whichever occurs first. If the
preliminary site plan approval expires, a new application must be filed and processed.
The final subdivision plat will be subject to all final subdivision plat requirements (Chapter 18,
Code of Albemarle County) in addition to the following conditions:
1. Satisfaction of items a. through h. of Engineering Department memo of 10 June 1997
[attached];
2. Albemarle County Service Authority approval of final construction drawings for all new
water and sewer lines and adjustments to existing line.
You are responsible for contacting all applicable departments and agencies, and satisfying the
conditions for approval of the final plat. When the final plat meets all requirements and
conditions, and tentative approval has been granted by each department or agency, a final
submittal must be made to the Department of Planning and Community Development to avoid
expiration. Grading may occur prior to final plat submittal upon approval and issuance of
appropriate permits by the Department of Engineering.
Please contact me at your earliest convenience if you have any questions or require additional
information.
Sincerely,
140
.I '
Ronald S. Keeler
Chief of Planning
RSK/rsk
Copy: Mr. Bruce Stouffer
Mr. Glenn Brooks
Mr. Robert Shaw
t7-046
A:I UREFAPP.WPD
RECEIVEDo==
NI
JUN 10 1997
COUNTY OF ALBEMARLE
Pfrinning
Dem, Department of Engineering&Public Works
MEMORANDUM
TO: Ron Keeler, Chief of Planning
FROM: Glenn E. Brooks, Senior Engineer
DATE: 10 June 1997
RE: UREF Research Park at North Fork, Phase 1
The revised preliminary site plan and letter addressing comments received on 6 June 1997 has
been reviewed. All Engineering Department comments have been addressed. However,the road
alignment has not been agreed to by VDOT. Therefore,Albemarle County Engineering will
recommend approval of the preliminary site plan when the following condition has been met.
1. VDOT approval of the preliminary road alignment. (VDOT comment from Richmond is
pending.)
Final road plans and infrastructure plans will be subject to all applicable ordinance requirements
and the following conditions:
a. [32.7.4, Dept. Policy] Engineering Department approval of stormwater pond plans and
computations.
b. [Dept. Policy] Engineering Department receipt of a copy and proof of recordation of
County standard stormwater management facilities maintenance agreements for the
ponds.
c. [32.7.4.3] Engineering Department approval of an erosion control plan.
d. [Dept. Policy] Engineering Department receipt of proof of compliance with State and
Federal agencies regulating activities within jurisdictional streams and wetlands.
e. [WRPA Ord.] Water Resources Manager approval of a Water Quality Impact
Assessment outlining mitigation measures for encroachments into the Water Resources
Protection Area Buffer.
f. [32.7.3, 32.6.6d, Sub. Ord. 18-36]Engineering Department approval of final public road
plans and drainage computations.
g. [32.7.3] VDOT approval of final public road plans and drainage computations.
h. [Dept. Policy, VDOT comment#1, 32.5.6m] Indicate the available sight distances at the
entrance on Route 29. Also, indicate the distance to the nearest intersections or entrances
in either direction.
Page 2
Memorandum: UREF Research Park at North Fork
10 June 1997
Final plats and site plans which have primary access to the proposed roads and are served by
Phase 1 infrastructure can be approved when the proposed roads are built or bonded in
accordance with the approved final public road and infrastructure plans. Final plats and
preliminary and final site plans will also be subject to Engineering Department review of all
applicable ordinance requirements.
Please contact me at your earliest convenience if you have questions or require additional
information.
GEB/ctj
Copy: SDP-97-046
VDOT, Charlottesville Residency
File:glennWFORKI.P2
RECEWEE
Aor, Jul1 7- 1997
�'IRGI4DP
COUNTY OF ALBEMARLE Planning Dept.
Department of Engineering&Public Works
MEMORANDUM
TO: Ron Keeler, Chief of Planning
FROM: Glenn E. Brooks, Senior Engineer
DATE: 17 July 1997
RE: UREF's North Fork Research Park,preliminary plan, vertical road alignment
The vertical alignment profile for the North Fork Research Park's entrance road received on 10
July 1997 has been reviewed. Albemarle County Engineering comments on the preliminary plan
for Phase I infrastructure have been addressed. The VDOT letters approving the preliminary
road alignment are attached. Albemarle County Engineering recommends approval of the
preliminary plan.
Final plans and plats will be subject to Engineering Department review as outlined in our
memorandum of 10 June 1997.
Please contact me at your earliest convenience if you have questions or require additional
information.
GEB/ybv
Attachment
Copy: SDP-97-046
File:gleno\NOR1HF.P3
•
•
/10 /e*e( hm-d
A/o stj4odbtf2
/-S This Oi ta,t
July 16, 1997'
North Fork Research Park
Vertical Alignment-Road "A"
Mr. Tim Vaughan
Dewberry & Davis
Battlefield Business Park
10522 Battlefield Parkway
Manassas, VA. 20109
Dear Mr. Vaughan:
Please be advised that we have reviewed the vertical alignment for Road "A" and it
meets our design standards.
Yours truly,
H. W. Mills
Assistant Resident Engineer
HWM/ldw
cc: Chris Reed
Ron Keeler
Glenn Brooks
Jim Kesterson
Post-it®Fax Note 7671 Date 1 17/,.71 ggesI
From
To 7D.1 s -1Nr-c5OK5
Co./Dept. v r Co. AI 41P,''rua-r‘ CO
Phone# Phone#
PO SAc� I
Fax# y_ Fax# - C �
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
701 VDOT WAY
DAVID R. GEHR CHARLOTTESVILLE. 22911 A. G.TUCKER
COMMISSIONER RESIDENT ENGINEER
June 17, 1997
SDP-97-046, Rt. 29
Northfork Research Park
Glenn E. Brooks
Dept. of Engineering
County Office Bldg.
401 McIntire Road
Charlottesville, VA. 22902
Dear Mr. Brooks:
The revised preliminary plans for the above referenced site have been reviewed
and appear to have addressed our previous comments. The horizontal alignment for a
45 mph design is all that has been approved to this date, with one curve radius
waiver being approved.
If you should have any questions, or require any additional information,
please advise.
Sincerely,
44V
J. H. Kesterson
Per. & Sub. Spec. Supv.
JHK/ldw
TRANSPORTATION FOR THE 21ST CENTURY
To: RKEELER (Ron Keeler)
From: Pete Gorham
Subject: Re: Pre-X- June 6
Date: 6/5/97 Time: 4:50PM
Originated by: RKEELER @ ACVA on 6/5/97 2 :59PM
Replied by: PGORHAM @ ACVA on 6/5/97 4:50PM
Westminster-Canterbury Rezoning: The Service Authority can grant
preliminary approval. They still owe us information on the increased
plumbing load so we can verify if a larger meter size is in order. If
a larger meter is required, construction drawings will be required for
review and approval. We won' t grant final approval until this is
resolved.
Manor House at University Village: The Service Authority can grant
final approval.
UREF Infrastructure Plan: The Service Authority can grant preliminary
approval. Before we grant final approval we will need to review and
approve final construction drawings for all the new water and sewer
lines, plus adjustments to existing lines.
Let me know if you have any questions. Thanks. Pete
"seF
•
JUS 2 5
1997
COUNTY OF ALBEMARLE
Department of Building Code and Zoning Services n15''9
r
401 McIntire Road,Room 223 d � p 'q
Charlottesville,Virginia 22902-4596
Building Code Information FAX(804)972-4126 Zoning Information
(804)296-5832 TTD(804)972-4012 (804)296-5875
MEMORANDUM
TO: Ron Keeler, Chief of Planning
FROM: Jan Sprinkle, Zoning AssistantJ fr
DATE: June 25, 1997
RE: UVA Research Park at North Fork, Phase I, Infrastructure Preliminary Site Plan
Revision Dated June 1, 1997
SDP 97-046
This revision meets my previous comments. The Zoning Administrator determined in a
separate memorandum that the time-related proffers of ZMA 95-04 do not jeopardize
this plan review.
JUL-18-1997 15 23 DEWBERRY & DAVIS P.01
'A JUL i 8 1991
ya.:• i I •
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
701 VDOT WAY
DAVID R.GEHR CHARLOTTESVILLE. 22911 A.G.TUCKER
COMMISSIONER RESIDENT ENGINEER
July 16, 1997
•
•
North Fork Research Park
Vertical Alignment-Road "A"
Mr. Tim Vaughan
Dewberry & Davis
Battlefield Business Park
10522 Battlefield Parkway
Manassas, VA. 20109
Dear Mr. 'Vaughan: •
Please be'advised that we have reviewed the vertical alignment for Road "A" and it
meets our design standards.
Y rs truly,
•
. W. M lls
Assistant Resident Engineer
HWM/ldw
cc: Chris Reed
Rorie: Keeler
•
Glean Brooks Post4e Fax Noteate
Jim Kesterson 7671. ToD -� 911 1
1 on V �
•
e� r From stn to licgr iS'
Co../Dept
co.
• Pllotte# q Phone N
Fax#G.
i=l_ 1ab` 'Iojs- Fax it
•
•
TRANSPORTATION FOR THE 21ST CENTURY
TOTAL P.01