Loading...
HomeMy WebLinkAboutSDP201700045 Review Comments Minor Amendment 2018-09-14County of Albemarle Department of Community Development Memorandum To: Don Franco From: Tori Kanellopoulos- Planner Division: Planning Services Date: September 14, 2018 Subject: SDP201700045 — Minor Amendment — Cascadia Blocks 1-3 The County of Albemarle Planning Division will grant or recommend approval of the Minor Amendment referenced above once the following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the Zoning Ordinance otherwise specified.] Planning 1. [Comment] Sheet 1 lists the office building as having one story, while Sheet 3 lists of the office building has having three stories. Please clarify the total square footage of the building and the number of stories of the building. 2. [Comment] On Sheet 2, provide a table showing the open space calculations for all Blocks, so that Planning Staff may determine if open space requirements are being met. 3. [Cascadia Code of Development] Loading spaces. According to Cascadia's COD, the number of loading spaces is "based on the total non-residential gross leasable within Block 1 and not upon a gross leasable square footage per lot basis." The proposed 8,500 square foot office is the only commercial (non-residential) use in Block 1. Therefore, one (1) loading space is required, based on the COD's requirement of "one (1) space for the first 8,000 square feet of non-residential gross leasable area". Please modify the site plan to show this loading space. 4. [Cascadia Code of Development] Dumpsters. According to Cascadia's COD, the number of dumpsters is also "based on the total non-residential leasable square footage within Block land not upon a per lot basis. Dumpsters shall be provided on the basis of one (1) dumpster pad, which does not impede any required parking or loading spaces, nor any pedestrian or vehicular circulation aisles, for every four thousand (4,000) gross square feet of non-residential building within Block I". Since this is the only commercial use in Block 1, please provide two (2) dumpsters to meet the COD requirement, as the gross non-residential square footage would be 8,500. 5. [4.12.13 (e)] Loading areas and dumpsters. The dumpster pad shown on the site plan is impeding access to one of the parking spaces. Relocate dumpster to meet 4.12.13(e) requirement that "dumpster pad that does not impede any required parking or loading spaces, nor any pedestrian or vehicular circulation aisles". Show that the dumpster pad material will be concrete. 6. [4.12.6 and Cascadia Code of Development] Minimum number of parking spaces. The parking tabulations on the site plan and Section 4.12.6 indicate that the site should have 34 parking spaces, however only 33 are shown on the site plan. Revise the site plan to show the additional parking space. 7. [4.12.16] Minimum design requirements and improvements for parking spaces within parking areas and parking bays. For the parking spaces that have a reduced length of 16 feet (versus the standard 18 feet), revise plan to show that there will be sufficient overhang in the areas where the parking spaces abut the planting median and the planting areas with small shrubs. A 2-foot overhang is required. Some of the shrubs may need to be removed or the type changed in order to accommodate the 2-foot overhang. a. See reference to 4.12.16: Perpendicular and curvilinear parking space minimum length requirements may be reduced by not more than two (2) feet when any of the following conditions are satisfied: (i) one or more rows of parking are separated by planting islands, median, or other such features (other than sidewalks) and allow for an unobstructed overhang, from each row, equivalent to the reduction; or (ii) one or more rows of parking adjacent to a building are separated from the building by planting islands, or other such features (other than sidewalks) and allow for an unobstructed overhang, from each row, equivalent to the reduction. 8. [4.12.15(g)] Pedestrian access. Provide pedestrian access, in the form of a concrete sidewalk (at least 5-feet, per COD standards) to connect the sidewalk along Cascadia Drive with the proposed 6-foot concrete sidewalk along the front of the proposed office building. 9. [32.7.9.71 Landscaping and screening. On the original site plan (SDP201400075), 12 evergreen type trees are shown in the landscape easement between the parking lot and the residential units behind the parking lot. Indicate if both the 25 shrubs and 12 evergreen trees will between the parking lot and residential units. If the evergreen trees are still being provided, the shrubs are not needed in addition, allowing for more overhang for the vehicles in the 16-foot long parking spaces. Inspections 1. Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require a stamped engineered design also. 2. Parking spaces and access isles shall not have a surface slope greater than 1:48. Access isles shall be at the same level as the parking space they serve. ARB 1. EC guidelines require that retaining walls 6' high and taller be terraced and planted. Please revise the plan accordingly. 2. A note on the plan indicates that plant counts haven't changed. For each plant that has been moved, please identify approved location and proposed relocation. 3. The building shown on the plan has not been approved by the ARB. Either: 1) remove the footprint from the plan; OR 2) provide architectural drawings for ARB review; OR 3) include the note on the drawing that was previously provided: "NOT INCLUDED IN ARB-2015-05" (see below). Note that ARB review of the building is required. It is recommended that an ARB submittal be made as soon as possible. s , tx9j1pa IIng —12 k 8'X9' Pai#c p Spam .�• j —61I L t•,I l a 4 i u9 (Off-4 ps tr?I t�'4 'oseh+e+it!, OFFICE SPAEE . f j l FEE-� 3.5 BF L Y 1 W } I ➢iu �w i � .;� � '� I_ -_� •:v-�.��- 'art '� l f� I c ®fIC Ef14C n G �'foo. Eawnwr�cTr F iti .. w .? l = r Fire Rescue 1. What will the height of the building be? If over 30' then the travel way must increase to 26'. 2. The travel way exceeds 150' so a turnaround or additional exit is required. 3. Is the building to be sprinklered? If so then a FDC must be shown and it must be located within 100' of a fire hydrant. 4. A knox box will be required for the building. Please add a note to the plan showing the requirement and that the location can be coordinated with the fire marshal's office. ACSA 1. Show water main along Cascadia Drive. 2. Show water meter and fire hydrant connections to water main. 3. Show water meter. 4. Add a note that back flow prevention is required. 5. Provide fixture counts to confirm meter size. 6. Confirm if there will be a fire suppression system. 7. Is there any proposed irrigation? Engineering 1. No Objection