Loading...
HomeMy WebLinkAboutSDP201800031 Review Comments Final Site Plan and Comps. 2018-12-04Stephen C. Brich, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. Virglnla 22701 December 4, 2018 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Christopher Perez Re: Rivanna Village Phase II — Final Site Plan SDP-2018-00031 Review #2 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Alan Franklin PE, LLC, revised 1 October 2018, and offers the following comments: 1. As stated in previous reviews, the oversized arches will only be approved if a maintenance agreement is recorded with the County of Albemarle. This includes retaining/wing walls that accompany these structures. 2. The design of the proposed arches, and retaining walls that are located within the ROW or support structures within the ROW, must be approved by the Culpeper District Structure & Bridge Section, as well as the Culpeper District Hydraulics Section prior to permit issuance. A maintenance agreement with the County/HOA for retaining walls Iocated in or supporting structures within the ROW should be recorded prior to street acceptance. Please provide structural plans for all structures requiring Culpeper District review, including geotechnical report (see Chapter 3 of the Manual of Instructions) and hydraulic information and calculations. Once received, these plans will be forward to the Culpeper District Structure & Bridge and Hydraulic Sections for review. 3. More "No Parking" signs are needed on the sides of the streets where parking is prohibited, particularly in areas where parking would obstruct intersection sight distance lines. 4. Street sections must remain consistent throughout, not taper down as ADT is decreased. 5. The Route 250 intersection sight distance lines were not found in plan view. 6. Provide the curve radius between STA 14+00 and 15+00 on Mossy Rock Road. 7. It does not appear that marked crosswalks on Lazy Branch Lane, Steamer Drive, and Village Park Avenue are not warranted given the anticipated ADT of these streets. Additionally, the two midblock CG-I2s on Lazy Branch Lane should be removed as mid - block crossings should not be encouraged. 8. The left intersection sight distance line at Cattail Court and Lazy Branch Lane is not adequate as it is tangent to the proposed grade. 9. Provide sight distance line and profile for the left turn in to the site from Route 250. VirginiaDOT.org WE KEEP VIRGINIA MOVING December 4, 2018 Christopher Perez Page 2 10. Only 5' of the required 8' shoulder is required to be paved along Route 250. This pertains to the improvements east of the entrance where curb is not being proposed. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin DeeI at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING