HomeMy WebLinkAboutSDP201800012 Correspondence Final Site Plan and Comps. 2018-04-25 Bill Fritz
From: Brian Roy <brianhroy@gmail.com>
Sent: Wednesday,April 25, 2018 10:15 AM
To: Bill Fritz; Pete Caramanis
Subject: Fwd:Woolen Mills Historical Panel
Attachments: 29495_BRMGMT_WoolenMills_proofl.pdf; 20180409_132208 jpg;20180409_
132218jpg; 20180409_132929jpg; 20180409_133739jpg; 20180409_133411jpg;
20180409_134641jpg; 20180409_133342jpg; 20180409_133921jpg
Bill,
Attached is an initial proof of my educational plan for the site at Woolen Mills. I will be using Gropen for
this work.
This is only the exterior plan as the interior will also have pieces/reproductions that I have, like the original
blueprints which are spectacular.
I have also attached a few pictures from the UVA special collections that they have recently received of
Woolen Mills items. It is not public and I am not sure how borrowing items or reproducing will work,but
obviously it would be awesome to have some of these on display inside WM.
Let me know if you need any more specifics about this,but I wanted to get you something to start with for
review.
Thanks!
Brian
00,
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
To:
Albemarle County Community Development
401 McIntire Rd
Charlottesville, VA 22902
Transmittal
Date: August 13, 2018
Job No.: 37032
Regarding: Woolen Mills Redevelopment - Final Site Plan SDP -2017-76
We are sending you the following items: ® Attached ❑ Under separate cover via
❑ Shop Drawings ❑ Prints ® Plans ❑ Specifications
❑ Copy of Letter ❑ Change Order ❑ Other
Comes mate De.w.rintinn
13
August 13, 2018
Final Site Plan (3 copies sent to ACSA directly)
1
August 13, 2018
Final Site Plan Design Calculations & Narrative
4
August 13, 2018
VSMP Plan and Comment Response Letter
2
August 13, 2018
SWPPP Documentation
1
August 13, 2018
Flood Plain Narrative, Development Permit and Fee Check
1
August 13, 2018
Request for Bond Application and Fee Check
This information is transmitted as checked below:
❑
For Approval
❑
Approved as submitted
❑
For your use
❑
Approved as noted
❑
As requested
❑
Returned for corrections
® For review/comment U Other
❑ Prints returned after loan to us
Remarks:
Copy to:
Received by:
Name (printed)
If enclosures are not as noted, please notify us at once
❑
Resubmit _
❑
Submit
❑
Return
❑
forbids due
Signed:
Signature
_ copies for approval
copies for distribution
corrected prints
-tifflett, PE
434.295.5624
F r,
00,
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
To:
Albemarle County Community Development
401 McIntire Rd
Charlottesville, VA 22902
Transmittal
Date: August 13, 2018
Job No.: 37032
Regarding: Woolen Mills Redevelopment - Final Site Plan SDP -2017-76
We are sending you the following items: ® Attached ❑ Under separate cover via
❑ Shop Drawings ❑ Prints ® Plans ❑ Specifications
❑ Copy of Letter ❑ Change Order ❑ Other
Comes mate De.w.rintinn
13
August 13, 2018
Final Site Plan (3 copies sent to ACSA directly)
1
August 13, 2018
Final Site Plan Design Calculations & Narrative
4
August 13, 2018
VSMP Plan and Comment Response Letter
2
August 13, 2018
SWPPP Documentation
1
August 13, 2018
Flood Plain Narrative, Development Permit and Fee Check
1
August 13, 2018
Request for Bond Application and Fee Check
This information is transmitted as checked below:
❑
For Approval
❑
Approved as submitted
❑
For your use
❑
Approved as noted
❑
As requested
❑
Returned for corrections
® For review/comment U Other
❑ Prints returned after loan to us
Remarks:
Copy to:
Received by:
Name (printed)
If enclosures are not as noted, please notify us at once
❑
Resubmit _
❑
Submit
❑
Return
❑
forbids due
Signed:
Signature
_ copies for approval
copies for distribution
corrected prints
-tifflett, PE
434.295.5624
F r,
* (!D®�v*if,0
gr 0
Y I MONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
May 17, 2018
William D. Fritz, AICP
County of Albemarle
Dept. of Community Dev.
401 McIntire Rd
Charlottesville, VA 22902-4596
608 Preston Avenue
Suite 200 P 434.295.5624
Charlottesville, VA 22903 F 434.295.8317
www.timmonwm
RE: Woolen Mills Redevelopment - SDP201800012 - Comment Response Letter
Dear Mr. Fritz:
We have reviewed all of your comments from April 2, 2018 and made the necessary
revisions. Please find our responses to the comments below in bold lettering.
Comments dated 04/02/2018 by Matt Wentland:
1. An approved WPO submittal will be required containing ESC and SWM plans
and a SWPPP before site plan approval (17-300, 17-301).
Acknowledged, an approved WPO plan will be obtained prior to site plan approval.
2. A Floodplain Development Permit application will need to be submitted and
approved.
Acknowledged.
3. Engineering recommends providing guard rail or bollards along the parking
spaces next to the existing rock wall (in the lot with no curb).
Guard rail has been added in this location. See Sheet C4.3.
Comments dated 03/20/2018 by Michael Dellinger:
1. Unable to determine the number of Type A and B units with a site plan, please
verify the number of accessible parking spaces required with the normal chart for
accessible parking and also the following below.
a. 1106.2 Group R-2 and R-3.
At least 2 percent, but not less than one, of each type of parking space
provided for occupancies in Groups R-2 and R-3, which are required to
have Accessible, Type A or Type B dwelling or sleeping units, shall be
accessible. Where parking is provided within or beneath a building,
accessible parking spaces shall also be provided within or beneath the
building.
CIVIL ENGINEERING I ENVIRONMENTAL . SURVEYING GIS i LANDSCAPE ARCHrrECTURE I CONSTRUCTION SERVICES
1 Type A unit and 42 Type B units are provided with the residential portion
of this project. Elevator access is provided within all buildings as well. At
least 1 ADA parking spaces will be dedicated for the residential portion of
the development. This space is located within the northern parking lot
nearest the building entrance to the residential floors.
b. Retaining walls over 3' in height require separate building permits. Walls
exceeding 4' in height require engineering also.
Acknowledged, building permits will be obtained for fall applicable walls.
Wall designs have been provided on Sheets S1.0 & S2.0.
c. Before building permits can be issued, an asbestos survey must be
performed. Positive results require a separate building permit to remove,
and a clearance report will be required prior to issuance of building permit.
Negative results will require documentation as well.
Acknowledged.
Comments dated 04/01/2018 by Shawn Maddox:
1. Based on the height of the building, aerial fire apparatus access roads must be
provided. The current submittal shows 24' of travel way, this must be increased
to 26'. See below for code reference. Please contact our office to discuss
alternatives to providing this access parallel to one entire side of the building as
referenced below.
Per email coordination with Shawn Maddox on 4118118, it was determined that 24'
of travel way is acceptable. The existing "saw tooth building" is only one story tall
and all buildings will contain a fire sprinkler system on all floors.
2. Will one fire department connection serve the entire building? If not then each FDC shall
be shown on the plans.
Two FDC's are shown on the plans. See Sheet C4.2 & C4.3.
3. A knox box will be required for this project. A note should be added that the knox box
location must be approved by the fire marshal's office.
A Knox box and note of fire marshal's office approval has been added at the front
building entrance. See Sheet C4.2.
4. An additional hydrant is needed on the Broadway Street entrance area of the project. An
appropriate location could be near the 8x8" tee in the vicinity of the 8x6" reducer.
A hydrant has been added as described. See Sheet C4.1.
5. The minimum acceptable unobstructed travel way for emergency apparatus access is
20'. At one point the travel way is restricted to 13'. If this width cannot be increased a fire
code modification will be required. Contact our office to discuss.
Per email coordination with Shawn Maddox on 4118118, emergency access has
been maintained at 20' in all possible areas. Removable bollards have been
provided on the southern side of the building to prevent passenger vehicles from
accessing areas that should remain clear.
6. Buildings exceeding three stories, or 30 feet, shall have at least two means of fire
apparatus access for each structure. As discussed during the special use permit process
emergency apparatus access from the Market Street side of the project does not appear
adequate. Trifs concern is compounded by the recuced travel way around the structure
at the point where the road narrows to 13'. Please contact our office to discuss.
Per email coordination with Shawn Maddox on 4118118, it was determined that this
comment has been addressed. Due to an existing building and wall at the end of
Market Street the pavement width cannot be widened any further than 13'.
7_ Once all travel lanes and emergency apparatus access widths have been resolved they
shall be marked as fire lanes.
"No parking fire lane" signs have been provided accordingly. See Sheets C4.1 -
C4.3 for more information.
We have included hard copies of the plans and calculations for your review. If you have
any questions or comments, please feel free to give me a call at 434.327.1690.
Sincerely,
Clint Shifflett, PE
Project Engineer
TIMMONS GnOUP
YOUR VISION ACHIEVED THROUGH OURS.
May 17, 2018
Victoria Fort, PE
Rivanna Water and Sewer Authority
695 Moores Creek Lane
Charlottesville, VA 22902
608 Preston Avenue
Suite 200 P 434.295.5624
Charlottesville, VA 22903 F 434.295.8317
www.timmons.com
RE: Woolen Mills Redevelopment - Comment Response Letter
Dear Ms. Fort:
We have reviewed all of your comments from April 6, 2018 and made the necessary
revisions. Please find our responses to the comments below in bold lettering.
General Plan Comments:
1. Add the RWSA General Notes to the plans on Sheet C1.0.
Notes added. See Sheet C1.0.
2. RWSA may request betterment to upsize the proposed 6" and 8" waterlines
through the site as part of a larger effort to improve water quality and pressure in
the urban area. RWSA will provide more information on this request as soon as
it becomes available.
Standing by to update waterline size if requested.
3. If the development will produce over 40,000 gallons of sewer flow per day, a
wastewater flow capacity certification from RWSA will be required prior to final
site plan approval.
As indicated on C0.0, per our calculations, the average daily sewer flow will be
30,300 GPD.
4. RWSA must maintain access to the back entrance to the Moores Creek
Advanced Water Resource Recovery Facility (AWRRF) at all times throughout
construction.
Acknowledged. See Note #1 on Sheet C3.2.
Sheet C2.2:
1. Show the existing ACSA 10" sanitary sewer line on this sheet.
All existing sanitary sewer lines are now shown on Sheet C2.2.
2. The demolition plan shows a sanitary sewer manhole and 4" force main to be
abandoned in place on RWSA property. Our records indicate that this manhole
ties into the existing ACSA sanitary sewer line on the RWSA property. Show
CIVIL ENGINEERING ENVIKUNMENIAL I SURVEYING 61S I LANDSCAPE ARCHITECTURE CONSTRUCTION SERVICES
how the force main and manhole connect to the existing ACSA 10" sewer line
and manhole, and clarify how this will be abandoned (e.g. fill with gravel, remove
manhole frame and cover, etc.).
Richard Nelson at ACSA gave us the following direction with regards to
abandoning the manhole;
"There is a lift station down stream of this (existing) manhole. The manhole
cannot be abandoned. The force main connection in the manhole will be
plugged."
With this in mind, we have indicated on Sheet C2.2 the existing private
force main connection shall be plugged at the manhole and contractor
shall coordinate with RWSA and ACSA. See note #5.
3. Add the following note to this sheet:
a. All work on RWSA property is subject to inspection by RWSA staff.
Note #4 added to C2.2.
Sheet C4.2:
1. Include signage at RWSA access gate to prevent it from being blocked (e.g. "DO
NOT BLOCK", "NO PARKING").
Callout added to Sheet C4.2.
2. RWSA will provide a template for the proposed permanent 24' access easement
for review by the property owner. This new access easement should be ready
for recordation prior to final site plan approval.
Acknowledged.
Sheet CS_4-
1. RWSA would like additional information on the proposed retaining wall with
safety rail (e.g. foundation depth, materials). Due to existing RWSA structures
and utilities being in close proximity to the proposed wall, RWSA wants to ensure
that any maintenance and repairs of its facilities would not impact the stability of
the wall.
Preliminary details and wall designs have been provided on Sheet S1.0 & S2.0.
Additional detail will be provided with required building permit documentation.
See VDOT Standard HR -1 for handrail detail on Sheet C1.4.
Sheet L1.00-
1. The landscape plan does not match the site plan with regard to the location of
the RWSA back entrance and gate, so trees are currently shown within the
proposed access easement.
The landscape plan has been revised accordingly.
If you have any questions or comments, please feel free to give me a call at
434.327.1690.
Sincerely,
Clint Shifflett, PE
Project Engineer
May 9, 2018
PROJECT: Woolen Mills Redevelopment
To: Amelia McCulley, Director of Zoning, Albemarle County
CC: Bill Fritz, Chief of Special Projects, Albemarle County
Subject: Woolen Mills Flood Wall Exemption for Historic Structure
Ms. McCulley,
Per our meeting on April 23, 2018, 1 am sending a written request for a formal zoning determination as it
relates to the need for a flood wall at the historic Woolen Mills site. The reason for this request is that a
new flood wall will result in enough of a change to the look and character of the historic building that it
will no longer qualify as a historic structure per the Virginia Department of Historic Resources. As such,
the project will not be able to receive historic tax credits, which makes any adaptive re -use of the
property impossible. It is my hope that a better determination of the code that emphasizes the historic
nature of the building will allow for the structure to be preserved as it has stood for over 100 years.
After careful review of the Albemarle County Code, I feel there is adequate language in the Code that
the Woolen Mills redevelopment project is a non -conforming use/structure under 30.3.3.1) and
30.3.3.16. Now that the project has evolved, all use will be commercial, as it has been since the
buildings were constructed over 100 years ago. The buildings on site predate all flood hazard overlay
zoning requirements and accordingly are non -conforming structures intended to be used for commercial
use, as always. The issue of removing the buildings from the flood plain was initially discussed in
relation to using at least a portion of the buildings for residential purposes. This is no longer an issue.
Though the project cannot feasibly include the flood wall for the reasons described, the project does
meet the spirit and intent of the overlay district in that all habitable spaces within the existing buildings
are above the flood plain. There would be no risk to the buildings occupants by exempting this historic
structure from the requirements of the overlay district as relates to the flood wall. We do otherwise
intend to comply with section 30.3.15.A.8.
It is notable that just about every section of the flood hazard overlay ordinance provides an exception
for historic structures that would lose their historic status by complying. This repeated emphasis on that
exception makes clear the importance and paramount nature of preserving the historic status of a
property during rehabilitation, and that is particularly important which such a culturally important site
as Woolen Mills. Per the code 30.3.16 NONCONFORMING USES AND STRUCTURES, any pre -FIRM
structure which lawfully existed before December 16, 1980...may continue, subject to the following...
D. Repair or rehabilitation of historic structure, substantial improvement. Any historic structure
undergoing repair or rehabilitation that would constitute a substantial improvement shall comply with
any requirements of the flood hazard overlay district that do not preclude the structure's continued
designation as a historic structure. The owner shall provide documentation from the State Historic
Preservation Officer...
Per the attached letter from the Department of Historic Resources, the addition of a substantial flood
wall covering the basement area will jeopardize the structure's continued Historic status, which justifies
my request for this property's exemption from the County's flood hazard overlay district.
It is my hope that you will recognize the importance of preserving such a valuable historic asset in
Albemarle County and determine that this project will be deemed in compliance or validly non-
conforming if it addresses the flood wall which would otherwise be required in the most effective way
permitted by DHR while still preserving the property's historic status.
If you have questions, Pete Caramanis and I would appreciate the opportunity to sit down with you to
answer them and further discuss these matters prior to the issuance of your determination.
Thank you.
Sincerely,
Brian Roy
Manager, Woolen Mills LLC
COMMONWEALTH of VIRGINIA
Department of Historic Resources
Matt Strickler 2801 Kensington Avenue, Richmond, Virginia 23221 Julie V. Langan
Secretary of Natural Resources Director
Tel: (804) 367-2323
Fax: (804) 367-2391
www.dhr.virginia.gov
May 81, 2018
TO: Bill Fritz, Chief of Special Projects, Albemarle County
FROM: Jessica Ugarte, Tax Credit Reviewer, Department of Historic Resources (DHR)
RE: Woolen Mills Redevelopment
Greetings.
My name is Jessica Ugarte, and I am the reviewer assigned to the Woolen Mills Historic Tax Credit
Program project. As Historic Tax Credit Program Reviewer, it is my responsibility to evaluate
proposed projects for their compliance with the Secretary of the Interior's Standards for
Rehabilitation (Standards), which is a nationally recognized set of guidelines that inform
rehabilitation work seeking participation in the Historic Tax Credit Program. All projects seeking
participation in this Program — which is operated by both the Commonwealth of Virginia and the
National Park Service — must comply with the Standards. As is our standard practice, we work
closely with applicants to develop rehabilitation work scopes that will meet the overall needs of a
new use, but will also protect the overall historic character of these structures.
Per the Description of Rehabilitation application that was initially submitted, we understood that —
per Albemarle County's requirements — the initial proposal for the residential redevelopment of
Woolen Mills would require that the habitable portions of the building be entirely out of the 100 -
year flood plain. In order to address this issue, the developer of Woolen Mills proposed a floodwall
to extend along the south -facing building frontage along Moore's Creek. This elevation is considered
the primary elevation of this historic structure and complex, and so is of high historic significance.
After significant discussion between DHR and the applicant to determine a path forward, the
proposed flood mitigation work included a new floodwall that was to be installed behind the
exterior, lower -level walls of the structures along Moore's Creek. This proposal would somewhat
preserve the exterior appearance of this primary elevation.
This proposed work represented a compromise that was reached to respond to both municipal
concerns of safety, and DHR's concerns that such a sizable new feature would have a major,
negative visual effect on the primary elevation of this historic site. Please recognize that this
proposal, while ultimately approved, represented a significant deviation from what would otherwise
normally be permitted in a project seeking participation in the Historic Tax Credit Program. Major
work such as this along a primary elevation does have a negative impact on the overall character of a
historic structure, and so is typically not a treatment that could be successfully implemented in a
Eastern Region Office Western Region Office Northern Region Office
2801 Kensington Avenue 962 Kime Lane 5357 Main Street
Richmond, VA 23221 Salem, VA 24153 PO Box 519
Tel: (804) 367-2323 Tel: (540) 387-5443 Stephens City, VA 22655
Fax: (804) 367-2391 Fax: (540) 387-5446 Tel: (540) 868-7029
Fax: (540) 868-7033
project seeing historic tax credits for redevelopment. However, in order to accomplish the goal of
reutilization of the Woolen Mills complex, the applicants and DHR worked together to design a
suitable solution that — while still negatively impacting the historic character of the site — was not so
severe that it would completely remove the possibility of the project's participation in the tan credit
Program.
We understand that the County of Albemarle has requested that a more robust and extensive
floodwall be installed, and we have been provided with preliminary drawings of what sort of
construction would be required at this site to accommodate these conditions. While this proposed
change has not been fully reviewed by this office, we have significant concerns with what is shown
in the new proposal. Unfortunately, the new proposal will have a significant and irreversible
negative impact on the structure's overall historic character, as this proposal for a floodwall will
require the foundation of the primary structure to be covered, resulting in the complete erasure of
historic windows and other exterior features and form along this primary elevation. This work
would have a negative effect on the structure's historic integrity, and could potentially put the
project's use of historic tax credits in jeopardy.
The requirements of the Historic Tax Credit Program and the Standards require that the essential,
character -defining features of a historic structure be retained and protected. Exterior elevations,
especially primary elevations, are of paramount importance to ensure that a structure retains its
historic character and historic designation. While we do not specifically comment on local
requirements or codes, it is our standard position that historic property owners must make every
effort possible to preserve and maintain historic windows/openings, stairs, and other distinguishing
characteristics. When operating throughout the Commonwealth we encourage owners and
developers of irreplaceable historic buildings to work with local officials to come up with solutions
that will protect the occupants of these buildings, but will also not result in the irrevocable loss of the
historic character of those structures. We hope that a waiver, or utilization of the IEBC's
Performance Methods (Chapter 14), be investigated and strongly considered for this structure when
determining the extent of a floodwall construction/mitigation that will be required at this project.
Thank you for your time and consideration. Please feel free to contact me if you have any questions
at either Jessica.0 arte e,dhr.vir ig nia.gov or 804-482-6452.
Respectfully,
Jessica Ugarte
Tan Credit Reviewer — Preservation Incentives
Department of Historic Resources
Administrative Services Eastern Region Office Western Region Office
10 Courthouse Ave. 2801 Kensington Avenue 962 Kime Lane
Petersburg, VA 23803 Richmond, VA 23221 Salem, VA 24153
Tel: (804) 862-6408 Tel: (804) 367-2323 Tel: (540) 387-5443
Fax: (804) 862-6196 Fax: (804) 367-2391 Fax: (540) 387-5446
Northern Region Office
5357 Main Street
PO Box 519
Stephens City, VA 22655
Tel: (540) 868-7029
Fax: (540) 868-7033
COUNTY OF ALBEMARLE
OLMR�l
Department Community Development
Planning Services Division
401 McIntire Road North Wing - Charlottesville, Virginia 22902-4596
Phone: (434) 296-5823 - Fax: (434) 972-4035
Transmittal
From: Bill Fritz Date: March 15, 2018
To: Matt Wentland-Engineering
OAdam Moore-VDOT
Michael Dellinger - Inspections
0
OShawn Maddox- Fire and Rescue
0
ORichard Nelson- ACSA
0
OVictoria Fort- RWSA
0
JOB #/FILE NAME: SUB -2018-12 Woolen Mills Final Site Plan
We are sending you the following items: ® Attached or ❑ Under separate cover
❑ Copy of Letter ❑ Prints ® Plans
❑ Plats ❑ Specifications ❑ Other
# of Date
Copies
Description
1 3/15/18
Final Site Plan for Woolen Mills
These are transmitted as checked below:
For review and comments IXI For
Other
Remarks: Please review the attached plans for final approval. Thank You
Comments are due in City View or email by: 04/05/18 Signature: Bill Fritz