HomeMy WebLinkAboutWPO201800046 Inspection 2018-12-14Conw" �I'fkb&e b Cpp/Y j
Under SILO ❑ Re-�i � C
(be) C
SWPPP INSPECTION
PMject Name: ' File Number. z
DEQ General Permit Number:
County lnIpector.
hMecWn Date:
Time: .
FarWWmings orAWcw, DATE TO CDMPLYBY,
Initial convois ❑ Claedn9 ❑ Rm* Grading ❑ Conoudor Q Finish Grad nq ❑ Sin ❑ swm conversion i]
Nb firrraen+es
Posting at the
The oover�age letter and SWPPP book loeation must be poMed in a promir�errt place
ells errbrerrce
the entrance b the job site, avah*b to the public on requesL
ebb PP
The complete doe anent must be avallabie for inspection oen-site
a
review
CmaMe
A anent coverage letter (e*hmon date of 2018) must be �dud�l
RegbIrentn
I /'j
A registration statement must be tnchmcled that goes with the coverage letter, the
S
acreage disturbed must be accurate.
PPP plan
A ofe_bn_pr�rver on Mn.and a dopy o_f th�Q
be Included in.the SWPPP. The plan must be marked ro ts► la
shoation at measures
Inspection
Reports must be up-th-daft, b. rmaft documenting Problems, and at
reports
required krtwvals. Rain events and inspections for rain everrts must be noted.
Inspection,
rFjMv yak nMM
Results of Inspections must be fotiow+ed up with corrective actions where necessary
SWUM I Fueling stations must be contained, and spill prevention and cleanup kits in place
Washouts A lined sump area must be provided for any concrete washout. Washout facilities for
point, grouts. etc. are also needed.. q
Trsh a and Trash and debris must be Weaned up so that it does not leave the job site. Any
debris contaminates must be protected from becoming runoff during rains (cover dumpstem).
Trash Is not to be buried on -site.
owoutuon Sanitation fadtities must be provided and maintained, and protected from splis, away
from inlets.
Erosion•, and S � P O`/J
SControle �d f u P OW ,d 1 I fol - 0
Stormwater Z [ lAC �P� j� cr oZ A C�C�
Management
per plans and
Standards 11
Compliant Notice to Comply [
Stop Work [] Bond Insp [
Waming ❑ Under NTC [
Under SWO ❑ Re -inspection (fee) [
Erosion Control ins action Report
Project Name: � � � ��.- F
Lr
Location Contractor
County Inspector: rt ��� .��` inspection Date: Lot # _
For Warnings or Notices, DATE TO COMPLYBY _Agreement #
Initial controls ❑ Clearing E4 Rough Grading Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑
Jr------------- nc�e w_ .._-.-•-------_-.__-.__-Comments/1Vofes-----------------_�..-�
A
tree fence -
Diversions, - - i -- ��P4 ! M 4 r A c r (� - of�a MA S
Berms, I
[ditches - _ .} . _ _ _.._ _ - -•- - _.
Inlet, culvert
protection - - - -- - -- - -- - -- --- --- ---- -
f Stream
work, i I
crossings__
Traps, - - -- - - -- - - --
Basins
Stabilization
Entrances - -
Limits �I �
Disposal
Disposal
Sanitary
Waste
Storage
SWP—PP --
Compliance
posting