HomeMy WebLinkAboutARB201800135 Action Letter 2018-12-18COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
December 18, 2018
Ryan Perkins
Kimley-Horn and Associates, Inc.
1700 Willow Lawn Dr., Ste 200
Richmond, VA 23230
RE: ARB-2018-135: Wawa at Pantops Corner, Initial Site Plan
Dear Mr. Perkins,
Staff has received the revised rendering of the fuel -pump canopy, submitted December 18, 2018. After
reviewing the resubmission, staff is satisfied that the revised drawing sufficiently address the following
request made at the December 3, 2018 ARB meeting:
• Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and
recommended conditions of initial plan approval:
o Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the
ARB:
Reduce the height dimension of the fuel -pump canopy to comply with the Standards for
Fuel Pump Canopies as outlined in Appendix B of the EC Design Guidelines.
Therefore, staff has approved the Initial Site Plan.
Please note that the ARB made the following recommendations at the December 3, 2018 ARB meeting to
assist with future review:
• Regarding recommendations on the plan as it relates to the guidelines:
1. Consider substituting tree and shrub species native to the Piedmont region for those exotic
species found in the plant schedule.
Regarding the final site plan submittal:
1. Clarify and correct the discrepancy between the stated square footage of the fuel -pump
canopy and the dimensions of the fuel -pump canopy provided on the site plans.
2. Consider continuing windows across the full length of the facade. Relieve blankness on
the east and west elevations by using landscaping.
3. Provide the standard glass note on the elevations: Window glass in the Entrance Corridors
should meet the following criteria: Visible light transmittance (VLT) shall not drop below
4001o. Visible light reflectance (VLR) shall not exceed 3001o.
4. Reduce the height of the fuel -pump canopy to comply with the Standards for Fuel Pump
Canopies as outlined in Appendix B of the EC Design Guidelines.
5. Provide landscape screening for the vent stacks and other similar equipment. Consider
locating the underground tanks to the east side of the site.
6. Show how the visibility of all mechanical equipment will be eliminated from the EC.
7. Provide a roof plan with equipment locations for review if any proposed mechanical
equipment will be roof -mounted. Show equipment locations and heights on the elevation
drawings.
8. Provide a dumpster enclosure detail in the plan. Show how the enclosure is compatible
with the building design.
9. Provide the standard mechanical equipment note on the site plan set and on the
architectural drawings: Visibility of all mechanical equipment from the Entrance Corridor
shall be eliminated.
10. Provide a lighting plan for review.
11. Provide standard lighting note on the lighting plan: Each outdoor luminaire equipped with
a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be
arranged or shielded to reflect light away from adjoining residential districts and away
from adjacent roads. The spillover of lighting from luminaires onto public roads and
property in residential or rural areas zoning districts shall not exceed one half footcandle.
12. Provide a glass sample and/or manufacturer's specifications that provide the VLR and
VLT values.
13. Specify the exact species for each tree and shrub proposed in the plant schedule. If
multiple species are proposed, provide distinct symbols for each and call them out on the
landscape plan.
14. Provide a finalized landscape plan at the front of the property which is consistent with
previous reviews and approvals.
15. Clarify the material of the area surrounding the proposed entrance sign.
16. Ensure that all proposed trees are clear of utilities and their easements.
17. Provide plantings in the southwest corner of the site.
18. Consider substituting tree and shrub species native to the Piedmont region for those exotic
species found in the plant schedule.
19. Ensure that the centers of proposed trees are a minimum of 7 feet from the centers of
underground utility lines.
20. Provide landscaping along interior pedestrian ways.
21. Provide three additional interior parking trees.
22. Revise the landscape plan to show the appropriate spacing of proposed shrubs based on
the final species chosen.
23. Ensure that any proposed tree or shrub species does not exceed 25% of the total trees or
shrubs proposed on the site.
24. Provide the standard plant health note on the landscape plan (CP-101): All site plantings
of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the
topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to
support the overall health of the plant.
25. Clarify the height of the retaining wall on the northwest corner of the site. If the wall is
over 6' tall, it must be terraced and landscaped, and this must be shown on the site plans.
26. Provide top -of -wall and bottom -of -wall elevations for the retaining walls.
27. Show how glare from canopy fixtures will be eliminated.
If you have any questions concerning any of the above, please feel free to contact me.
Sincerely,
Heather McMahon, Senior Planner
hmcmahon&albemalre. org
434-296-5832 ext. 3278
cc: Pantops Corner LC, 12704 Crimson Court, Ste 101, Henrico VA 23233
File ARB-2018-135
LIGHT FD(TURE —i SLOPE PRECAST CAP
T.O. WALL h
Metal
Atas International
Bone White
# 26
Roof 7Tave
—
T.O. CANOPY
03,,Z.
" I I
a K3J
wI
-I- I- I I -17
��'�����
T.O. MASONRY
5
`�
T0. SILL 1
0"
JIM
MANUFACTURED
STONE SILL
BRICKTAVERN
�'
m BOLLARD
,a.
/
E� T.O. FLOOR SLAB
FRONT ELEVATION
RIGHT ELEVATION
GATE,
LEFT ELEVATION
REAR ELEVATION
Metal Door
Trim
Thin Brick
Benjamin Moore
James Hardie
7Tavern Flash Red
White Diamond
Arctic White
Marion Ceramics
BM 2121-60
JH10-20
WAWA CAS CANOPY 5TACKED 9 A
FRAME -
TRA5H
COMPOUND
MA5011-L -
Richmond Rd. & Stoney Point
Rd., Charlottsville,
VA • C&P
Project #2180578 • 10-17-2018
TO. WALL
9' 0°
T.O. MASONRY
8' 8"
`BRICK TAVERN
T0. SILL h
5' - 0"
MANUFACTURED
STONE SILL
I —BRICK TAVERN
STORE #8rorol
Architects Engineers Planners
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
December 6, 2018
Ryan Perkins
Kimley-Horn and Associates, Inc.
1700 Willow Lawn Dr., Ste 200
Richmond, VA 23230
RE: ARB-2018-135: Wawa at Pantops Corner, Initial Site Plan
Dear Mr. Perkins,
At its meeting on Monday, December 3, 2018 the Albemarle County Architectural Review Board, by a
vote of 4:1 voted to forward the following recommendations on the above -noted Initial Site Development
Plan to the agent for the Site Review Committee:
• Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and
recommended conditions of initial plan approval:
o Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the
ARB:
Reduce the height dimension of the fuel -pump canopy to comply with the Standards for
Fuel Pump Canopies as outlined in Appendix B of the EC Design Guidelines.
Regarding recommendations on the plan as it relates to the guidelines:
1. Consider substituting tree and shrub species native to the Piedmont region for those exotic
species found in the plant schedule.
• Regarding conditions to be satisfied prior to issuance of a grading permit: None.
Regarding the final site plan submittal:
1. Clarify and correct the discrepancy between the stated square footage of the fuel -pump
canopy and the dimensions of the fuel -pump canopy provided on the site plans.
2. Consider continuing windows across the full length of the facade. Relieve blankness on
the east and west elevations by using landscaping.
3. Provide the standard glass note on the elevations: Window glass in the Entrance Corridors
should meet the following criteria: Visible light transmittance (VLT) shall not drop below
40%. Visible light reflectance (VLR) shall not exceed 30%.
4. Reduce the height of the fuel -pump canopy to comply with the Standards for Fuel Pump
Canopies as outlined in Appendix B of the EC Design Guidelines.
5. Provide landscape screening for the vent stacks and other similar equipment. Consider
locating the underground tanks to the east side of the site.
6. Show how the visibility of all mechanical equipment will be eliminated from the EC.
7. Provide a roof plan with equipment locations for review if any proposed mechanical
equipment will be roof -mounted. Show equipment locations and heights on the elevation
drawings.
8. Provide a dumpster enclosure detail in the plan. Show how the enclosure is compatible
with the building design.
9. Provide the standard mechanical equipment note on the site plan set and on the
architectural drawings: Visibility of all mechanical equipment from the Entrance Corridor
shall be eliminated.
10. Provide a lighting plan for review.
11. Provide standard lighting note on the lighting plan: Each outdoor luminaire equipped with
a lamp that emits 3, 000 or more initial lumens shall be a full cutoff luminaire and shall be
arranged or shielded to reflect light away from adjoining residential districts and away
from adjacent roads. The spillover of lighting from luminaires onto public roads and
property in residential or rural areas zoning districts shall not exceed one halffootcandle.
12. Provide a glass sample and/or manufacturer's specifications that provide the VLR and
VLT values.
13. Specify the exact species for each tree and shrub proposed in the plant schedule. If
multiple species are proposed, provide distinct symbols for each and call them out on the
landscape plan.
14. Provide a finalized landscape plan at the front of the property which is consistent with
previous reviews and approvals.
15. Clarify the material of the area surrounding the proposed entrance sign.
16. Ensure that all proposed trees are clear of utilities and their easements.
17. Provide plantings in the southwest corner of the site.
18. Consider substituting tree and shrub species native to the Piedmont region for those exotic
species found in the plant schedule.
19. Ensure that the centers of proposed trees are a minimum of 7 feet from the centers of
underground utility lines.
20. Provide landscaping along interior pedestrian ways.
21. Provide three additional interior parking trees.
22. Revise the landscape plan to show the appropriate spacing of proposed shrubs based on
the final species chosen.
23. Ensure that any proposed tree or shrub species does not exceed 25% of the total trees or
shrubs proposed on the site.
24. Provide the standard plant health note on the landscape plan (CP-101): All site plantings
of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the
topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to
support the overall health of the plant.
25. Clarify the height of the retaining wall on the northwest corner of the site. If the wall is
over 6' tall, it must be terraced and landscaped, and this must be shown on the site plans.
26. Provide top -of -wall and bottom -of -wall elevations for the retaining walls.
27. Show how glare from canopy fixtures will be eliminated.
You may submit your application for continued ARB review at your earliest convenience. Application forms,
checklists and schedules are available on-line at www.albemarle.or /g ARB. Please be certain that your ARB
submittal addresses the above -noted issues.
If you have any questions concerning any of the above, please feel free to contact me.
Sincerely,
1�4- gxb,01—
Heather McMahon, Senior Planner
hmcmahon(a,albemalre. org
434-296-5832 ext. 3278
cc: Pantops Corner LC, 12704 Crimson Court, Ste 101, Henrico VA 23233
File ARB-2018-135
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff
has indicated below what they think will be required as a resubmission of revisions. If you need to submit
additional information please explain on this form for the benefit of the intake staff. All plans must be
collated and folded to fit into legal size files, in order to be accepted for submittal.
TO:
DATE:
PROJECT NAME: ARB-2018-135: Wawa at Pantops Corner, Initial Site Plan
Submittal Type Requiring Revisions () indicates submittal Code
County Project Number
# Copies
Erosion & Sediment Control Plan (E&S)
Mitigation Plan (MP)
Waiver Request (WR)
Stormwater Management Plan SWMP
Road Plan (RP)
Private Road Request, with private/public comparison (PRR)
Private Road Request — Development Area (PRR-DA)
Preliminary Site Plan PSP
Final Site Plan (or amendment) (FSP)
Final Plat FP
Preliminary Plat (PP)
Easement Plat EP
Boundary Adjustment Plat (BAP)
Rezoning Plan (REZ
Special Use Permit Concept Plan (SP-CP)
Reduced Concept Plan (R-CP)
Proffers (P)
Bond Estimate Request (BER)
Draft Groundwater Management Plan (D-GWMP)
Final Groundwater Management Plan (F-GWMP)
Aquifer Testing Work Plan (ATWP)
Groundwater Assessment Report (GWAR)
Architectural Review Board (ARB)
ARB201800135
Other: Please explain
(For staff use only)
Submittal Code
# Copies
Distribute To:
Submittal Code
# Copies
Distribute To:
ARB
2
Heather McMahon