Erosion & Sediment Control
Preconstruction Conference Checklist
/�
Name of Plan: t ' Io(A Cc' JG\Vi2_
Y
Plan No.: �� 1_ )g3
Date: 71—1.3
1) Copies of approved plan given to: Owner or Authorized Agent / Contractor 9-
2) Have all the conditions been met? 5
3) Responsible Land Disturber: SC—` (47:(///50/i
Cert./Lic.No.: 3-70 ), y Type: p L f)
Address/Phone/Mobil Phone:
(i e2 " - 9626
4) Name of Prime Contractor: Pi e a M c rt 4- -eo, \/ Ccc c-Lt c. - ori <<�
Address/Phone/Mobil Phone: 6.5.3 5 1.3000 CJI Ot,t
Ana Kilmer
From: Ana Kilmer
Sent: Friday, May 10, 2013 2:25 PM
To: 'Drew C. Holzwarth'; Kenny Thacker
Cc: Esther Grace
Subject: wpo-2012-00083 Mountain Valley WPO Plan - Driveway for lots 36 and 37. Erosion &
Sediment Control plan and Mitigation Plan
The$85,940 water protection performance bond has been posted and approved (erosion$35,320; mitigation$50,620).
The permit and first year inspection fee has been paid. Please contract Kenny Thacker to set up the pre-construction
meeting.
Thanks
Ana D. Kilmer
Management Analyst
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville,VA 22902
434-296-5832
akilmerc albemarle.org
1
•
based on documentation submitted by the owner that clearly demonstrates that the land
disturbing activity commenced on that date.
2. Permanent vegetation shall be installed on all denuded areas within nine (9)
months after the date the land disturbing activity commenced, except for areas that the program authority
finds are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface"
includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete;
trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such
other surfaces that the program authority determines would adequately provide a permanent barrier to erosion.
3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may
be extended by either the program authority or the board of supervisors, or both, as follows:
a. The program authority may extend the time limit for installing permanent
vegetation up to an additional six (6) months, provided the owner submits a written request to the program
authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program
authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the
control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner
has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In
granting an extension, the program authority may impose reasonable conditions.
b. The board of supervisors may extend the time limit for installing permanent
vegetation for duration it determines to be appropriate, provided the owner submits a written request to the
clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent
vegetation. The program authority shall provide its opinion to the board as to the condition of the property with
respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and
install permanent vegetation for the land disturbance covered by this permit. The board may grant the
extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii)
the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively
control or has effectively controlled erosion and sedimentation on the property during the land disturbing
activity. In granting an extension, the board shall set a time limit and may impose other reasonable conditions.
Notes: . . , ') bix ie