Loading...
HomeMy WebLinkAboutWPO201200083 Bond Estimates WPO VSMP 2018-11-30 Mountain Valley WPO Plan-Driveay Access for lots 36&37 WPO file number:WP0201300083 Mitigation Plan bond estimate Item Iters No.Unit Unit Cost Cost Number (installed) trees 183 ea 5150.00 527.450.00 shrubs 186 ea 550.00 59.300.00 seedlings 553 ea $5.00 52765.00 mobiluabon snoo.m cost sum 540,015.00 moi mgmt $6.00225 contingency $4.601.73: Total $50,620 4252013 Mountain Valley WPO Plan-Driveway Access for lots 36 and 37 WPO file number:WPO201300083 Erosion and Sediment Control Bond Estimate Item Tern No.Unit Unit Cost Cost Number Jinstalledl stablizason(PS,TS) 2.0 acres $5,000.00 $10,000.00 sin fence(SF) 50.0 ft $5.00 $250.00 safety fence(SAF) 0.0 ft $5.00 $0.00 diversion(DD,FD,RWD) 840 ft $13.00 $10,920.00 temporary slope drain(TOD) pipe length 0 ft pipe diameter 15 In $535.00 $0.00 1 temporary sediment trap(ST or CIP) height of dam at toe 5 I cut at dam 0ft height of darn at face 4 ft cut at high side 0 ft length of darn 20 ft length of cut 0 ft top width 4 ft width of cut 0 ft (comp.fill vol) 90.0 cy (cut yob 0.0 cy 513.00 length of spillway 10 ft (cy est) 90.0 width of spillway 5 ft (spillway stone tons) 0 $50.00 $1,170.00 1 temporary sediment trap(ST or DIP) Method for volume height of darn at toe 5 ft cut at darn 0 ft (lenth)z(total wilt height of darn at face 4 ft cut at high side 0 ft assume face at 2' length of darn 20 ft length of cut 0 ft total width=3c)tor top width 4 ft width of cut 0 ft average height=( (comp.fill vol) 90.0 cy (cut vol) 0.0 cy $13.00 length of spillway 10 ft (cy est) 90.0 width of spillway 5 ft (spillway stone tons) 0 050.00 $1,170.00 sit fence inlet protec5on(IP) 0 $100.00 $0.00 stone inlet protection(IP) 0 9200.00 $0.00 outlet protection(OP) length 5 ft width 10 ft 1 $225.00 $225.00 channel(SCC,matted) length 0 ft width 0 ft $0.00 check dam depth in channel 1 ft channel width 10 ft 3 $225.00 $675.00 construction entrance(CE) 1 $2,000.00 $2,000.00 wash rack $2,000.00 paved construction entrance 0 03,500.00 $0.00 np-rap,placed depth 2 ft length 1.0 ft width 1.0 (tons) 0.15 $60.00 $9.00 survey and layout(price per 0.1 mi.) acres 0 traps and basins 2 $1,000.00 mobilization 8500.00 stream crossing(computed independently) cost sum 827,919.00 prol regret $4,187.85 contingency $3,210.69 Total $35,320 4/25/2013 O�rReceieed: e�Pald:� °� A ! y� BOND APPRO PD PIAN # WPO 201 PR(l.)>=CT NAME.: Mountain VAlle (As tisW on ft approved plan) This is to request that an inspection be performed by the County. Where 1~ws are assessed. a.fee is required for each inspection. Please check the inspections requested. Q VS.NfPNESCP Erosion Control. Stormwater Management and/or Mitigation per Water Proteeflon Ordinance section 17-207 & 208 5250 0 Subdivision (roads, drainage, etc.) per Subdivision Ordhianve section 14-435 and 14-438: 5269 C3 Water di Sewer per Subdivision Ordinancc section 14-435 $269 Ci Site Development Performance bond (Incomplete Site Work & Landscape Maintenance) W1 TOTAL FEES $250.00 Inspections for the purposes of bond reduction or release will requirr a separate Pee for each bond. Submit requests to. Deparinicrit of Community Developinimt. 401 McIntire Road. North Wigg, Charlottesville, VA 2-1942, Attention, Management Analyst - Phone 434-296-5832. pax 434-9724126, All roads and storrrsv,ater fho;ilities will require construction record drawings, inspection reports, and completion processes through VD0T or DEQ. Bonds will not be rcduccd or rc:lea ;d w ithout record drawings and inspection documentation per the sate recpuimmals and county's published procedures. A minimum 201/9 of the original pasting is held until accepter of ell Fronded improvements. For Site Development Performance bonds, if lattd:sca c installation is part of the bonded incomplete site w ofl(. a request for reduction should o nIy N made once all site work is complete. The revised estimate should be sent to. EMAIL: 250gtv@p epsicva.com OR REGUI:AR MAIL. ADDRESS: not or0owne c *per Pre . Name � Lute i4<%ksot7ri5.2014,71y0:2101z.I V,iIojs