Loading...
HomeMy WebLinkAboutWPO201200083 Action Letter WPO VSMP 2018-04-01 .oFALL 8 �i„ llll IIIIK -ii �'IRGINIP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax (434)972-4126 April 1,2013 Mr. Gaylon Beights Evergreen Land Company Post Office Box 370 Crozet, VA 22932 Re: Annual Permit Renewal and Inspection Fee Mosby Mountain Subdivision/Plan#2300 Water Protection Performance Bond-$55,250.00 (Erosion&Sediment Control $26,750.00; Stormwater Management&Water Quality$28,500.00 Arch Insurance Company,Bond No.SU5022290 STOP WORK ORDER Dear Mr. Beights: Under§17-214-(B)of the Albemarle County Code,you are hereby notified to immediately cease all land disturbing activities on the above referenced property(STOP WORK)with the exception of work to address the installation of erosion and sediment control measures,soil stabilization,or any necessary drainage corrections as approved by the County. A sworn complaint has been made by the Inspector,Kenny Thacker,who indicates that the items in the "Notice to Comply"dated March 7,2013,have not been adequately addressed by the deadline given.You must immediately address the following deficiencies: 1. Deficiency: Annual: Permit Renewal fee has not been paid. Required Correction: Pay the required Annual Permit Renewal fee This STOP WORK ORDER shall remain in place for 7 days from receipt of notice.If you fail to comply after the stop work order is issued,the Department will void your permit,declare the bond in default,and turn this matter over to the County Attorney for appropriate legal action. If you have any question or concerns with steps necessary to correct this violation,please contact Kenny Thacker at 296-5832, ext.3390. Sincerely, 59g#‘7 Kenny Thacker Glenn Brooks, P.E. Erosion Control Officer Erosion Control Program Administrator KT/ Attachment Certified No. 91 7108 2133 3937 4223 6312 Copy: Glenn Brooks, P.E.,County Engineer Arch Insurance Company, Laura L. Brown,Attorney-in-Fact c/o USI DC Metro,2755 Hartland Road, Falls Church,VA 22043 Ana Kilmer,Management Analyst Reading File lorro **NO ,,U44 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville,Virginia 22902 24 Jan 2013 Jessco LLC P.O. Box 9035 Charlottesville VA, 22906 Piedmont Realty&Constr.,LLC 3081 Darby Road, P.O. Box 724 Keswick, VA 22949 Re: Stream buffer disturbance for driveway and stream crossing on TM89-73G5 For lot in Mountain Valley Subdivision (Building permit B201201640SF) You are hereby notified that the stream work proposed for your driveway crossing is not approved. The Water Protection Ordinance application (WPO201200083) submitted by Collins Engineering on your behalf was not approved. This application has been denied. Any work to build a driveway within the stream buffer will be a violation of the County's Water Protection Ordinance. Section 17-320D3 indicates that"disturbance shall be the minimum necessary for the lot(s)to be used and developed". This subdivision already has an approved mitigation plan under section 17-321, which shows no disturbance for driveways on these lots, and assures access on Ridgetop Drive. Your access is currently on Ridgetop Drive. The approved plans and plats for Mountain Valley Subdivision indicate that access to this lot (as well as TM89 parcel 73G3, 73G4, 73G6)is to be provided on Ridgetop Drive. After consultation with the agent of the Subdivision Ordinance, you are also notified that access from another location will be in violation of the Subdivision Ordinance. If you still wish to pursue the matter of driveway access through the stream buffer, you may request an exception to the Water Protection Ordinance under section 17-308, and this matter will be scheduled for a Board of Supervisors hearing. Please contact me if you have questions. Sincerely, I, /i zrrr�iv Glenn Brooks, P.E. County Engineer w , a , 111 ,0 .6.:..., m -`" N zw Q N : ¢ W n M n ,, r. N=M 0 'aNO � J N O p V ±:� ;� : v �rA'' V ________ I j _- � 6:2.! ix) A o w Y ttCNN ZtiniuJ U La W w W Ce 11- C>> at` o w N0 Nm N ett C '0 a. O ' ~ N a' it w CCS Q N d ( LE P Z,its . 4::01 O � Fr gc 1 `' "#-V, g '42 - 4, w S � 8o o s � U a C) A I 1 1 v Glenn Brooks From: Glenn Brooks Sent: Monday, October 01, 2012 9:14 AM To: 'Scott Collins' Subject: Mountain Valley(WPO201200083) Scott, We have received your application, mitigation plan,and erosion and sediment control plan for a driveway in Mountain Valley subdivision. The approved plat for this subdivision requires lots 34-37 to have access from Ridge Top Drive. Please refer to Deed Book 3128 pages 589-623. These plans cannot be approved. In future, please have the owner sign the application as required. Thank you, Glenn Brooks,P.E. County Engineer Albemarle County 1 46.0X',WOO AIWA 64.0taiiiatim, ACTIONS Board of Supervisors Meeting of February 22,2013 February 22,2013 AGENDA ITEM/ACTION ASSIGNMENT PODCAST 1. Call to Order. • Meeting was called to order at 11:30 a.m., by the Chair, Ms. Mallek. All BOS members were present. Also present were Tom Foley, Larry Listen Davis, Ella Jordan and Travis Morris. 2. Presentation on County Executive's FY 2013-2014 Recommended Budget. • RECEIVED. 3. Mountain Valley WPO Exception. • APPROVED, by a vote of 6:0, an exception to Clerk:Set out conditions of Listen the Water Protection Ordinance to allow a approval (Attachment 1) stream crossing on TM 89-73G5 in Mountain Valley Subdivision subject to three conditions. 4. From the Board: Matters not Listed on the Agenda. Listen • There were none. 5. Adjourn to February 25,2013,6:00 p.m., Lane Auditorium. • At 1:39 p.m.,the Board adjourned until February 25, 2013. ewj/tom Attachment 1 —Conditions of Approval 1 ATTACHMENT 1 CONDITIONS OF APPROVAL 1. Prior to construction of the stream crossing,the property owner must submit a mitigation plan for the disturbance and the plan must be approved prior to commencing construction.The mitigation plan shall be revised to include mitigation for the prior disturbances of graded access from Ambrose Commons Drive and the new stream crossing,with the Program Authority having the authority to determine if the proposed mitigation plan adequately addresses this impact. 2. Associated with reviewing the mitigation plan, the property owner shall demonstrate to the Program Authority's satisfaction that all federal and state permits associated with the stream disturbance are in place including necessary easements to allow Lot G6 to use this driveway. 3. Associated with reviewing the mitigation plan,the Program Authority shall determine if a revised Erosion and Sediment Control Plan is needed for compliance with the approved Erosion and Sediment Control Permit. If a revised plan is needed, no land disturbance associated with the driveway crossing shall be allowed prior to approval of a revised plan and the permit including the plan. 2