HomeMy WebLinkAboutWPO201800010 Plan - VSMP Minor Amendment 2018-10-12D all MASS GRADE EROSION & SEDIMENT CONTROL PLAN SITE DATA AMENDMENT TO BORROW AREA EROSION & SEDIMENT CONTROL PLAN (WP020180001 0) QW== -r K M=y OWNER / DEVELOPER: MARCH MOUNTAIN PROPERTIES LLC CONTACT: DAVE BROCKMAN CELL: (702)-985-9088 lave@ oldtrailviliage.com OLD TRAIL VILLAGE 1005 HEATHERCROFT CIRCLE, SUITE 100 CROZET VA, 22932 PLAN PREPARER: ROUDABUSH, GALE, & ASSOCIATES, INC. 914 MONTICELLO ROAD CHARLOTTESVILLE, VA. 22902 (434)-977-0205 TAX MAP PARCEL: 055EO-01-00-000A2 PARCEL AREA: 23.226 ACRES DRAINAGE DISTRICT: SLABTOWN BRANCH TO THE LICKINGHOLE DRAINAGE BASIN WATERSHED: S. RIVANNNA RESEVOIR TOPOGRAPHY: COMPLIED FROM FIELD RUN SURVEY BY ROUDABUSH, GALE & ASSOCIATES DATED APRIL, 2015, JULY, 2018, LOUISA AERIAL SURVEYS, AUGUST 2012 AND GIS DATALAYERS FROM ALBEMARLE COUNTY OFFICE OF GEOGRAPHIC DATA SERVICES Y2013 ELEVATION DATA, TOPOGRAPHY - 2 FOOT CONTOUR INTERVALS, DATUM: VERTICAL - NAVD 88, HORIZONTAL - NAD 83 CRITICAL SLOPES: CRITICAL SLOPES EXIST WITHIN THE PROJECT LIMITS. GRADING ACTIVITY IS PLANNED WITH THIS PROJECT IN ACCORDANCE WITH APPROVED ZMA. THE LIMITS OF THE CRITICAL SLOPES WERE DETERMINED BY THE ANALYSIS OF THE EXISTING TOPOGRAPHY FROM THE AERIAL SURVEY AND GIS CONTOUR DATA. A PORTION OF CRITICAL SLOPES HAS BEEN FIELD VERIFIED TO BE LESS THAN 25% AND EXHIBIT HAS BEEN SUBMITTED UNDER SEPARATE COVER. SEE PLAN FOR LOCATION. FLOODPLAIN: PORTIONS OF THIS PROJECT ARE LOCATED WITHIN THE FEMA FLOODPLAIN LIMITS AS SHOWN ON FLOOD INSURANCE RATE MAP COMMUNITY PANEL NUMBER 510006 0237 D. EFFECTIVE DATE: FEBRUARY 4, 2005. THERE WILL BE ENTRANCE GRADING OPERATIONS ASSOCIATED WITH THIS PROJECT WITHIN THE FEMA FLOODPLAIN LIMITS. HEC -RAS STUDY HAS BEEN COMPLETED AND SUBMITTED TO THE COUNTY ENGINEER FOR DIETERMINATION. STORMWATER: AS DEFINED BY THE OVERALL SWM MASTER PLAN 'WP0201600009, APPROVED ON 4/25/2016. THE DEVELOPMENT OF THIS BLOCK REQUIRES APPROXIMATELY 7.89 LB/YR OF PHOSPHORUS REMOVAL. THERE IS A CUIRRENT SURPLUS OF TREATMENT ACREAGE IN THE SWM MASTER PLAN, WHICH IS UNDERSTOOD TO BE SUFFICIENT COVERAGE FOR WATER QUALITY REQUIR;EME.N'71S UNTIL THE FINAL WPO PLAN IS DEEMED APPROVED BY ALBEMARLE COUNTY ENGINEERING. EASEMENTS: ALL PROPOSED EASEMENTS SHALL BE RECORDED (PRIOR TO CONSTRUCTION. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE: CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS),THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND, APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 9:00 PM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINIKING, OR COLLAPSE. 16, THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES, WHERE APPLICABLE, ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE _PROPERTY. BLOCK 32 ALBEMARLE COUNTY. VIRGINIA iZ 0 VICINITY MAP SCALE: 1 "=1000 FEET 3 \> ; ' a v w C T ENGINEERING O '� U CIAW = _ ,t N CO) m �"� g Ztp aQo Q. W 0� ZO U5c r Ow5o z ~ Q. V ` rc � J 0 w + \. j ,. , � f i ...............: poi vcm o WT�U_� WZ 1OL U L1.1 tL ^V) 0> w Ln % r REVISIONS 1 COUNTY COMMENTS'I SEPT. 24, 2018 COUNTY COMMENTS OCT, 12, 2018 010 „ r " „ 1 � i r q , e.. , DATE AUGUST 10, 2018 SCALE 1 "=40' ---------------- CONTOUR INTERVAL 2 FEET 0 W— T � v w a c T ti P -' O W a_ Z 2 0 U 2 W Hgz I- 3 N m Q g z O�VJ� to : 5 Zw Z� ! a°` O� Q� �w>o CD— V �OQ� �oi Q c= F= O W�— W 0co W ,�y `e a �C:)o�J O J Wz J Z 0 o V rZ W Q e1' a Qu. aC o; L �'^^w v, 4.W V cm Zg Q 2 W �R V Z Z 2 a OW r REVISIONS 1 COUNTY COMMENTS'I SEPT. 24, 2018 COUNTY COMMENTS OCT, 12, 2018 010 „ r " „ 1 � i r q , e.. , DATE AUGUST 10, 2018 SCALE 1 "=40' ---------------- CONTOUR INTERVAL 2 FEET FILE NUMBER 8053 SHEET 2 of 7 0 W— Z og c T ti _n u�o -' O W a_ Z 0 02n Lr ■ I- 3 Z O g z O�VJ� Zw Z� � Z O�_J5 O UQ CD— V �OQ� �oi Q c= F= O W�— W m a �C:)o�J Wz a 0 o (D Q Lu aC FILE NUMBER 8053 SHEET 2 of 7 c REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS'I OCT. 12, 2018 0 DATE AUGUST 10, 2018 SCALE 1 "=40' CONTOUR INTERVAL 2 FEET 0 T Z og oJW I� Z� Z g Z QI - �O W � �wZ> L J o 0Qir C:) < co cc: 2 W �,,,_, W m to m C a Qo j ~c)O W o� Wa m 2 a FILE NUMBER 8053 SHEET 3 of 7 T \ v a w Cj �W 1 O I �Tr N co 2� a� O VX: O� Q" rc Lu g 00 �G o to W Q UQ rW � C W 0 20 U 0� LL LL .., �? 0 �, w Un Viw cc it a W U I Z T Z UI V w W Z Z W = a ,O W REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS'I OCT. 12, 2018 0 DATE AUGUST 10, 2018 SCALE 1 "=40' CONTOUR INTERVAL 2 FEET 0 T Z og oJW I� Z� Z g Z QI - �O W � �wZ> L J o 0Qir C:) < co cc: 2 W �,,,_, W m to m C a Qo j ~c)O W o� Wa m 2 a FILE NUMBER 8053 SHEET 3 of 7 REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS OCT. 12, 2018 DATE AUGUST 10, 2018 SCALE 1 "=40' ------------- CONTOUR INTERVAL 2 FEET r � Z a og 0 Co (L ' U 2 W G q (� NCL l V Z � oN ZO U?5 p V Q�cr- W >_ pWZ� ov = o t�7y O Q W Vv (Q vQ oW J O (� CC ♦�C=W Q Yr N < ca W y> Q� W co W w °LL mU) " o Wa CwaW o> Wu" Uo Q � 9 T rR V W Z Z = a C REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS OCT. 12, 2018 DATE AUGUST 10, 2018 SCALE 1 "=40' ------------- CONTOUR INTERVAL 2 FEET A� FILE NUMBER 8053 SHEET 4of7 41 0 T Z og 0 Co (L o �O Z��� gzZ a _ OL �J� V pWZ� = o t�7y O Q J Vv C (� CC ♦�C=W Q W W < ca W mU) o Wa (1) Q � A� FILE NUMBER 8053 SHEET 4of7 41 REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS OCT. 12, 2018 DATE AUGUST 10, 2018 11 SCALE N/A CONTOUR INTERVAL N/A O T V4 *14 w t 2 , cr EROSION AND SEDIMENT CONTROL NARRATIVE CONSTRUCTION AREAS THAT WILL REMAIN DORMANT FOR YEAR OR MORE F-4 WHEN IT REDUCES THE CAPACITY OF THE CHANNEL. INTEGRITY OF THE BASIN DURING A 25 -YEAR STORM OF 24-HOUR DURATION. THE RESTORED STORMWATER CONVEYANCE SYSTEM THAT IS al Z 0 0� SHALL BE STABILIZED WITH A PERMANENT SEED MIXTURE ACCEPTABLE TO U ® I`0) A RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND FUNCTIONING IN ACCORDANCE WITH THE DESIGN OBJECTIVES. Z PRIOR TO CONSTRUCTION THAT TIME OF YEAR. PREPARE SURFACE WITH APPROVED TREATMENT AND 6. CHECK DAMS SHALL BE CHECKED FOR SEDIMENT ACCUMULATION AFTER OU TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST (B) THE PEAK DISCHARGE REQUIREMENTS FOR CONCENTRATED W 1. OWNER SHALL POST SURETY BONDS FOR CONSTRUCTION, EROSION & ADDITIVES PRIOR TO APPLYING SEED. EVERY RUNOFF PRODUCING 'STORM EVENT. SEDIMENT SHOULD BE REMOVED ®w WHILE THE SEDIMENT BASIN IS UTILIZED. STORMWATER FLOW TO NATURAL STORMWATER CONVEYANCE 'Q SEDIMENT CONTROL. 4W J O W WHEN IT REACHES ONE-HALF OF THE ORIGINAL HEIGHT OF THE MEASURE. 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A SYSTEMS SHALL BE MET. SEE 19(B)(1)(B). 2. CONTRACTOR SHALL OBTAIN PERMITS TO WORK WITHIN STATE RIGHT-OF-WAY 5. MULCH (3.35 - PLANT RESIDUES OR OTHER SUITABLE MATERIALS SHALL BE V REGULAR INSPECTIONS SHALL BE MADE TO INSURE THE CENTER OF EACH WO MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE 4 %� = co (VDOT LAND -USE PERMIT). BONDING FOR WORK WITHIN THE VDOT APPLIED TO DISTURBED SURFACES TO PREVENT EROSION AND REDUCE V�S�� DAM IS LOWER THAN THE EDGES. EROSION CAUSED BY HIGH FLOWS AROUND cc rx 4W ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION _.c RIGHT-OF-WAY MAY BE REQUIRED TO OBTAIN THE PERMIT. OVERLAND FLOW VELOCITIES. THIS PRACTICE SHOULD BE APPLIED TO ALL aA THE EDGES OF THE DAM SHOULD BE CORRECTED IMMEDIATELY. SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL ` 3. CONTRACTOR SHALL COORDINATE WITH OWNER TO OBTAIN VSMP PERMITS, AS SEEDING OPERATIONS, OTHER PLANTER MATERIALS WHICH DO NOT PROVIDE THE PROBLEM IS CORRECTED.THERE ARE NO PROPOSED CUT OR FILL Z REQUIRED BY THE STATE DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ). ADEQUATE SOIL PROTECTION BY THEMSELVES, AND BARE AREAS WHICH 7. THE EARTHEN EMBANKMENTS SHALL BE CHECKED REGULARLY TO ENSURE IT IS ND AND HAS NOT BEEN DAMAGED BY EROSION SLOPES. HOWEVER, THE CONTRACTOR IS TO RESTORE THE PROJECT AREA TO EXISTINGDE STEEP ES RE FOUND GENERAL ENERAL EROSION CONTROL NOTES WHICHSTILL I L NEED _ 4. CONTRACTOR SHALL OBTAIN LAND DISTURBANCE PERMIT FROM THE COUNTY PROTEOCTION TOEPREVDENT SOIL LOSS. CRIMPING, RAT CONSTRSTRUCTURALLY EQUI MEm1T TO ERODING EXCESSIVELY AFTER ONE YEAR, CONTRACTOIRPROVIDE OF ALBEMARLE PRIOR TO BEGINNING CONSTRUCTION. ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS 5. APRE-CONSTRUCTION MEETING WITH THE ENGINEER, THE CERTIFIED LAND INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED. 8. THE STORMWATER MANAGEMENT FACILITIES SHOULD BE CHECKED REGULARLY CORRECTED. WORK AREA PROTECTION &MAINTENANCE DISTURBER, AND THE ENVIRONMENTAL INSPECTOR MAY ALSO BE REQUIRED. BY THE HOMEOWNERS ASSOCIATIONS TO ENSURE THAT THEY ARE 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES 1. ALL FENCES REQUIRED TO BE REMOVED OR DISTURBED BY CONSTRUCTION SHALL BE ALLOW 72 HOURS FOR COORDINATION AND SCHEDULING OF 6. EROSION CONTROL BLANKETS 3.36) - EROSION CONTROL BLANKETS IN STRUCTURALLY SOUND AND HAVE NOT BEEN DAMAGED BY EROSION. UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT SALVAGED, STORED, PROTECTED AND RE -INSTALLED BY CONTRACTOR AT THE DIRECTION PRE -CONSTRUCTION MEETING. CONJUNCTION WITH PERMANENT SEEDING WILL BE INSTALLED ON ALL SLOPES CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. MAXIMIZE SHIEETFLOW AND OF AND LOCATION DESIGNATED BY THE PROJECT MANAGER. SUCH FENCE MATERIAL STEEPER THAN 3:1 FOLLOWING GRADING. EROSION CONTROL BLANKETS WILL 9• THE EMERGENCY SPILLWAY SHALL BE CHECKED REGULARLY TO ENSURE THAT GROUNDWATER INFILTRATION CANNOT BE REUSED DUE TO DAMAGE CAUSE D BY CONTRACTOR, OR, CONTRACTOR SHALL INSTALL NEW FENCE OF THE SAME TYPE OF MATERIAL. TEMPORARY FENCING REQUIRED PROJECT DESCRIPTION THIS PROJECT PROPOSES TO PROVIDE EARLY GRADING FOR THE DEVELOPEMENT ALSO BE INSTALLED IN DITCHES WHERE POTENTIAL EROSIVE VELOCITIES MAY ITS LINING IS WELL ESTABLISHED AND EROSION RESISTANT. GRASS SHALL BE 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR BY PRIVATE PROPERTY OWNERS SHALL BE PROVIDED BY CONTRACTOR. CONTRACTOR IS OF BLOCK 32 IN OLD TRAIL VILLAGE. THE EXCESS DIRT WILL BE STOCKPILED ON EXIST AS DETERMINED BY ENGINEERING CALCULATIONS. THIS WILL PROTECT KEPT MOWN BELOW A HEIGHT OF 15" AND THE OUTLET SHOULD BE OTHER PROTECTION SHALL BE PROVIDED.CONTRACTOR TO NOTIFY ENGINEER ADVISED TO CONTACT PROPERTY OWNERS AT LEAST FORTY-EIGHT (48) HOURS IN THE WEST SECTION OF THE DEVELOPMENT. GRADING INVOLVED WITH THIS PLAN FROM RILL AND GULLY EROSION. CHECKED FOR CLOGGING. AND COUNTY EROSION CONTROL INSPECTOR. ADVANCE OF REMOVING ANY FENCE IN ORDER TO COORDINATE RELOCATION AND/OR WILL COINCIDE WITH FINAL SITE PLAN GRADES. LIMITS OF DISTURBANCE WILL 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION PROTECTION OF ANY ANIMALS, AND TO ESTABLISH AND CONFIRM WITH THE OWNER THE INCLUDE APPROX. 20.80 ACRES. 7. TREE PROTECTION (3.38) - THE TREE FENCE BARRIER WILL BE INSTALLED 10. THE DAM SECTION SHALL BE KEPT FREE OF SAPLINGS OR TREES.(REFER TO SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE PRE -CONSTRUCTION CONDITION OF ANY FENCE TO BE REMOVED, DISTURBED OR TO PROTECT THE TREES OUTSIDE OF THE LIMITS OF DISTURBANCE AS THE ADDITIONAL MAINTENANCE SPECIFICATIONS) CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE REPLACED. EXISTING SITE CONDITIONS INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN. TREATED TO REMOVE SEDIMENT.THERE ARE NO STORM SEWER INLETS 2. CONTRACTOR IS PERMITTED TO WORK IN THE PUBLIC RIGHT-OF-WAY (FOLLOWING THE CURRENT CONDITONS OF BLOCK 32 CONSISTS OF MODERATE TREE COVER 11. ALL SEEDED AREAS WILL BE' CHECKED REGULARLY TO ENSURE THAT A GOOD PROPOSED. ISSUANCE OF VDOT APPROVAL) AND ANY TEMPORARY OR PERMANENT EASEMENT WITH VIRGIN SOL TERRAIN WHICH IS BOUNDED BY STREAMS TO THE NORTH AND 8. DUST CONTROL (3.39) - DUST CONTROL METHODS MUST BE USED TO STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RE -SEEDED AS 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR (FOLLOWING VERIFICATION OF EXISTENCE OF EASEMENT) SHOWN ON THE PLANS. SOUTH OF THE PROPERTY. REDUCE THE AMOUNT OF AIRBORNE DUST DURING ALL PHASES OF NEEDED. IN THE EVENT THAT THE APPLIED SEEDING FAILS TO TAKE HOLD, PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY HOWEVER, CONTRACTOR SHALL NOTIFY PROPERTY OWNER(S) FORTY-EIGHT (48) HOURS CONSTRUCTION WHERE SOIL IS EXPOSED OR DISTURBED. BLANKET MATTING SHALL BE PLACED IN APPROPRIATE AREAS DEEMED REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHA REQSHALL BE INSTALLEDM PRIOR TO WORKING ON ANY PRIVATE PROPERTY TO GAIN AND COORDINATE ACCESS AND ADJACENT AREAS NECESSARY BY THE ENGINEER OR EROSION CONTROL INSPECTOR. IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.THERE ARE NO TO DETERMINE A STORAGE AREA FOR MATERIALS IF NEEDED. COORDINATION OF ACCESS THE SOUTHERN ADJACENT AREAS CONSISTS OF MULTI -FAMILY DEVELOPMENTS OF STORMWATER CONVEYANCE CHANNELS OR PIPES PROPOSED. TO PUBLIC RIGHT-OF-WAY AND STORAGE OF MATERIALS THEREON SHALL BE BLOCKS 19, 24, 25, AND 33 OF OLD TRAIL VILLAGE. TO THE NORTH OF THE MANAGEMENT STRATEGIES SEQUENCE OF CONSTRUCTION 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL COORDINATED WITH VDOT AND THE PROJECT MANAGER. CONTRACTOR'S FAILURE TO SO PROJECT CONSISTS OF BLOCK 22 AND DENSTOCK APARTMENTS. OLD TRAIL DRIVE 1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BE 1. AFTER OBTAINING ALL REQUIRED PERMITS THE CONTRACTOR SHALL Q T R BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND NOTIFY AND COORDINATE WITH PROPERTY OWNERS AND/OR THE PROJECT MANAGER MAY / RUNS ALONG THE EASTERN SIDE OF THE DEVELOPMENT. SEQUENCED, AND ALSO BEGIN AND END AS QUICKLY AS POSSIBLE. COORDINATE A PRE -CONSTRUCTION MEETING, ALLOWING 72 HOURS FOR ITS STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING RESULT IN DELAYS. COORDINATION. I CONSTRUCTION. NON -ERODIBLE MATERIAL SHALL BE USED FOR THE 3. CONTRACTOR SHALL, AT HIS EXPENSE, MAINTAIN THE WORK SITE IN A CLEAN AND OFF-SITE AREAS 2. THE CONSTRUCTION ENTRANCE AND PERIMETER EROSION CONTROL MEASURES CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE ORDERLY APPEARANCE AT ALL TIMES. ALL DEBRIS AND SURPLUS MATERIAL COLLECTED ALL EXCESS MATERIAL GENERATED AS PART OF THIS PROJECT SHALL BE HAULED SUCH AS TREE PROTECTION AND SILT FENCE SHALL BE INSTALLED AS THE 2. INSTALL CONSTRUCTION ENTRANCE OFF OF OLD TRAIL DRIVE. USED FOR THESE STRUCTURES IF ARMORED BY NON -ERODIBLE COVER SHALL BE DISPOSED OF OFF THE WORK SITE BY CONTRACTOR, AT HIS EXPENSE. TO A LOCATION WITHIN THE OLD TRAIL DEVELOPMENT THAT HAS BEEN APPROVED FIRST STEP OF DISTURBANCE. MATERIALS. CONTRACTOR SHALL FOLLOW THE VESCH CHAPTER' 3.25 UTILITY 4. EXISTING LAWNS, TREES, SHRUBS, FENCES, UTILITIES, CULVERTS, WALLS, WALKS, BY THE COUNTY OF ALBEMARLE COMMUNITY DEVELOPMENT DEPARTMENT. 2.1. SHOULD THE TEMPORARY CONSTRUCTION ENTRANCE OFF OF OLD TRAIL STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM DRIVEWAYS, POLES, SIGNS, RIGHT-OF-WAY MONUMENTS, MAILBOXES AND THE LIKE SHALL 3. SEDIMENT BASIN MEASURES SHALL BE INSTALLED WITH PERIMETER SILT DRIVE NOT BE MAINTAINED PROPERLY OR AN EXCESSIVE AMOUNT OF CROSSINGS. BE PROTECTED FROM DAMAGE DURING THE WORK. ANY DAMAGE CAUSED TO SUCH ITEMS SOILS FENCE PRIOR TO ANY GRADING AND SHALL BE SEEDED AND MULCHED SOIL FOUND TRACKED ONTO THE PUBLIC ROADWAY, THEN A PAVED 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. PROPERTY 36C--HAYESVILLE LOAM, (7% TO 15% SLOPES) IMMEDIATELY FOLLOWING INSTALLATION. CONSTRUCTION ENTRANCE, WATER TANKER TRUCK WITH TWO (2) MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR PINS DISTURBED BY CONTRACTOR THAT ARE NOT SHOWN ON THE PLANS TO BE DISTURBED SHALL BE RESTORED BY A LICENSED SURVEYOR AT CONTRACTOR'S EXPENSE. DEEP, MODERATELY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER PRESSURE WASHERS AND A SETTLING AREA MAY BE REQUIRED BY THE STREAM CROSSING CONSTRUCTED OF NON -ERODIBLE MATERIAL SHALL BE 5. CONTRACTOR SHALL EMPLOY EROSION CONTROL DEVICES AND METHODS AS REQUIRED TO TO SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM, CLAY, SANDY CLAY LOAM, AND 4. THE SEDIMENT BASIN SHALL BE CHECKED FOR SEDIMENT ACCUMULATION EROSION AND SEDIMENT CONTROL PROGRAM ADMINISTRATOR. PROVIDED.CONTRACTOR SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY MEET THE REQUIREMENTS AND INTENT OF THE LOCAL EROSION CONTROL ORDINANCE. FINE SANDY LOAM. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY AFTER EVERY RUNOFF PRODUCING STORM EVENT. SEDIMENT SHOULD BE STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CONTRACTOR SHALL PROVIDE THE NECESSARY DIVERSION DITCHES, DIKES OR TEMPORARY IS MODERATELY HIGH. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION IS REMOVED WHEN IT REACHES ONE-HALF OF THE DESIGN VOLUME OF THE 3. CLEARING AND GRUBBING SHALL FIRST BE LIMITED TO THAT NECESSARY TO CROSSINGS. CULVERTS REQUIRED TO PREVENT MUD AND DEBRIS FROM BEING WASHED ONTO THE SLIGHT. WET STORAGE. INSTALL SILT FENCE, TREE PROTECTION AND OTHER PERIMETER CONTROLS. 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO STREETS OR PROPERTY. CONTRACTOR'S VEHICLES SHALL BE KEPT CLEAN TO PREVENT SAF-TEY FENCE SHALL BE INSTALLED FOR PROPER PROTECTION OF EXISITNG WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.CONTRACTOR MUD OR DUST FROM BEING DEPOSITED ON STREETS. NO AREA SHALL BE LEFT DENUDED 5. TEMPORARY SEEDING OR OTHER STABILIZATION METHODS, SUCH AS BASE WETLANDS SHOWN HEREON THIS PLAN. ALL PERIMETER CONTROLS MUST BE SHALL FOLLOW FOLLOW ALL APPLICABLE FEDERAL, STATE AND LOCAL FOR MORE THAN SEVEN (7) CALENDAR DAYS. 26C3 - DYKE CLAY LOAM. SEVERELY ERODED, (7% TO 15� SLOPE) AGGREGATE WILL FOLLOW IMMEDIATELY AFTER REACHING FINAL GRADES. MADE FUNCTIONAL PRIOR TO ANY UPSLOPE LAND DISTURBANCE THAT TAKES REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS. DEEP, MODERATELY SLOPING AND WELL DRAINED. STARTING AT SURFACE LAYER PLACE. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY TO SUBSTRATUM, SOIL LAYERS CONSIST OF CLAY LOAM, CLAY, AND GRAVELLY 6. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A GOOD AFTER WORK IN THE WATERCOURSE IS COMPLETED.CONTRACTOR SHALL VEGETATION CLAY. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RE -SEEDED AS 3.1. INSTALL TREE PROTECTION AT THE PERIMETER OF THE LIMITS OF FOLLOW THE VESCH CHAPTER 3.25 UTILITY STREAM CROSSING REQUIREMENTS 1. PRIOR TO REMOVING ANY VEGETATION, CONTRACTOR SHALL MEET WITH THE PROPERTY MODERATELY HIGH TO HIGH. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION NEEDED TO ESTABLISH GROWTH.. DISTURBANCE WITHIN THE WOODED AREAS. FOR THE TWO INTERMITTENT STREAM CROSSINGS. OWNERS AND THE PROJECT MANAGER TO REVIEW THE LIMITS OF CONSTRUCTION AND IS SLIGHT. 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH OBTAIN PERMISSION TO REMOVE VEGETATION REQUIRED TO DO THE WORK. 7. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION 3.2. SILT FENCE SHALL BE INSTALLED ON THE DOWNHILL SIDE OF THE THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: 2. TREE AND PLANT ROOTS OR BRANCHES THAT MAY INTERFERE WITH THE WORK SHALL BE 37D3 - HAYESVILLE CLAY LOAM, SEVERELY ERODED, (15% TO 25% SLOPES) AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. ACTIVE TRENCHING OPERATIONS. A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. TRIMMED OR CUT ONLY WITH THE APPROVAL OF THE PROJECT MANAGER. ANY TREES OR SOIL IS DEEP, STRONGLY SLOPING AND WELL DRAINED. STARTING AT SURFACE B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. PLANTS WHICH ARE SHOWN TO REMAIN THAT DO NOT INTERFERE WITH THE WORK, BUT LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF CLAY LOAM, CLAY, SANDY 8• DURING FINE GRADING OPERATIONS, MAINTAIN ALL DIVERSION DITCHES TO 4. PRIOR TO ADDITIONAL CLEARING AND GRUBBING, THE CONTRACTOR SHALL C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED ARE DAMAGED BY CONTRACTOR OR HIS SUBCONTRACTORS, SHALL BE REPAIRED OR CLAY LOAM, AND FINE SANDY LOAM. PERMEABILITY IS MODERATE WHILE THE SEDIMENT TRAPS. THE SEDIMENT TRAPS SHALL REMAIN FUNCTIONAL COORDINATE INSPECTIONS, A'S REQUIRED BY THE COUNTY OF ALBEMARLE. THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. AVAILABLE WATER CAPACITY IS MODERATELY HIGH. SURFACE RUNOFF IS HIGH. THROUGHOUT INSTALLATION OF THE STORM SEWER INLETS, PIPES,OUTFALLS. DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING 3. CONTRACTOR SHALL CLEAN UP, RESTORE, SEED AND MAINTAIN ALL DISTURBED AREAS HAZARD OF EROSION IS MODERATE.STREAMS 5. CLEAR AND GRUB THE REMAINDER OF PROJECT AREA. OR OFF-SITE PROPERTY. IMMEDIATELY UPON COMPLETION OF WORK ON EACH SITE. TOPSOIL, SEED, FERTILIZER 9. INSTALL SILT FENCE INLET PROTECTION TRAPPING MEASURES AT EACH INLET D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED AND MULCH SHALL BE PLACED IN ACCORDANCE WITH ESC AUTHORITY STANDARDS ON ALL 4E - ASHE LOAM, (�25% TO 45% SLOPES) LOCATION WITHIN THE DITCH WHERE APPLICABLE. 5.1. THE LAND DISTURBANCE SHALL BE RESTRICTED TO THE LIMITS OF IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. DISTURBED AREAS. A PERMANENT STAND OF GRASS ADEQUATE TO PREVENT EROSION DEEP, STRONGLY SLOPING AND SOMEWHAT EXCESSIVELY DRAINED. STARTING AT DISTURBANCE SHOWN I N THE APPROVED EROSION CONTROL PLANS. E. RE -STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS SHALL BE ESTABLISHED PRIOR TO FINAL ACCEPTANCE. "STABILIZED". SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM, SANDY LOAM, 10). WHILE THE SEDIMENT BASIN REMAINS FUNCTIONAL FOR THE DISTURBED AREA, CHAPTER. 4. THE ACT OF RESEEDING SHALL NOT QUALIFY AS THE CONTRACTOR SHALL BE RESPONSIBLE TO ESTABLISH VEGETATION, NOT SIMPLY APPLY SEED AND MATERIALS. AND BEDROCK PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS INSTALL THE PERMANENT EXTENDED DETENTION PONDS AND OUTLET 5.2. THESE LIMITS ARE CONFINED TO THE PROPERTY OWNED BY OLD TRAIL F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.CONTRACTOR TO LOW. SURFACE RUNOFF IS MEDIUM. HAZARD OF EROSION IS MODERATE PROTECTION MEASURES PER THE SPECIFICATIONS. FOR THE BLOCK 32.. ADHERE TO THE APPLICABLE STANDARD FOR PRIVATE AND PUBLIC UTILITY INSTALLATION. 258 - DYKE SILT LOAM, (2% TO 7% SLOPES) 11. AFTER BEING NOTIFIED BY THE EROSION AND SEDIMENT CONTROL 6. STOCKPILE TOPSOIL WITHIN AN AREA ON THE PROPERTY OWNED BY OLD 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR EROSION &SEDIMENT CONTROL LEGEND DEEP, NEARLY LEVEL AND WELL DRAINED. STARTING AT SURFACE LAYER TO ADMINISTRATOR, THE TEMPORARY EROSION AND SEDIMENT CONTROLS CAN BE TRAIL AT A LOCATION APPROVED BY ALBEMARLE COUNTY COMMUNITY PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT SUBSTRATUM, SOIL LAYERS CONSIST OF SILT LOAM, CLAY, AND GRAVELLY CLAY. CLEANED UP OR REMOVED, AND THE SEDIMENT TRAPS CAN BE FILLED IN DEVELOPMENT. INSTALL SILT FENCE AT THE PERIMETER OF STOCKPILE(S). OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH TO HIGH. HAZARD OF EROSION IS SLIGHT. AND SEEDED, THEREBY REDIRECTING DRAINAGE TO THE PERMANENT FA,0`1LITIES. 7. DENUDED AREAS SHALL DRAIN TO AN APPROVED EROSION CONTROL SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THEROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. C SAI 3.01 n E n SAFETY FENCE SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELLING OR SLOPES) 12. THE STORMWATER MANAGEMENT FACILITIES SHOULD BE CHECKED REGULARLY MEASURE AT ALL TIMES DURING CONSTRUCTION. SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. 7B - ADDOCK LOAM, AINED. STARTING AT SURFACE LAYER TO DEEP, NEARLY LEVEL AND WELLL DRAINED. NEW PERMEABILITY IS BY THE HOMEOWNERS ASSOCIATIONS TO ENSURE THAT THEY ARE STRUCTURALLY SOUND AND HAVE NOT BEEN DAMAGED BY EROSION. THE 8. CONTRACTOR SHALL COORDINATE INSPECTIONS, AS REQUIRED BY THE ABLEMARLE COUNTY SERVICE: AUTHORITY, PRIOR TO MAKING THE SEWER STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT' IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT C E 3.02 CONSTRUCTION ENTRANCE SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM AND CLAY. MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH. HAZARD OF EMERGENCY SPILLWAY SHALL BE CHECKED REGULARLY TO ENSURE THAT ITS SYSTEM OPERATIONAL. LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.CONTRACTOR EROSION IS SLIGHT. LINING IS WELL ESTABLISHED AND EROSION RESISTANT. GRASS SHALL BE KEPT MOWN BELOW A HEIGHT OF 15 AND THE OUTLET SHOULD BE 9. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO ALL SHALL MAKE PROVISIONS TO KEEP ADJACENT ROADS CLEAN FROM SOIL BUILD-UP. CONSTRUCTION ROAD 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE �, R S 3.03 C, R S ( ( TO 2% SLOPES) CHECKED FOR CLOGGING. THE DAM SECTION SHALL BE KEPT FREE OF DENUDED AREAS WITHIN SEMEN DAYS AFTER FINAL GRADE IS REACHED ON STABILIZATION 77 - RIVERVIEW-CHEWACLA COMPLEX, (0% DEEP, NEARLY LEVEL WELL DRAINED SOILS ON FLOODPLAINS. STARTING AT SAPLINGS OR TREES.(REFER TO THE ADDITIONAL MAINTENANCE ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE UNLESS OTHERWISE SURFACE LAYER TO SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM AND SILT LOAM OR SILT CLAY LOAM. PERMEABILITY IS HIGH WHILE AVAILABLE WATER SPECIFICATIONS) APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. TEMPORARY MEASURES ARE NO LONGER NEEDED, AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY S 3.05 SILT FENCE CAPACITY IS MODERATELY HIGH. OCCASIONAL FREQUENCY OF FLOODING. HAZARD PERMANENT STABILIZATION PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER OF EROSION IS SLIGHT. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH STRAW & LEFT DORMANT FOR MORE THAN ONE YEAR. EROSION AND SEDIMENTATION.CONTRACTOR SHALL STABILIZE SITE, AND bb SEED IMMEDIATELY FOLLOWING FINISHED GRADE. SEEDING SHALL BE DONE WITH OBTAIN INSPECTOR APPROVAL PRIOR TO REMOVING EC MEASURES. UPOND - 3.12 DIVERSION CRITICAL AREAS KENTUCKY 31 TALL FESCUE IN ACCORDANCE TO STANDARD AND SPECIFICATION 10. LIME, FERTILIZE AND APPLY TEMPORARY OR PERMANENT SEEDING TO ALL APPROVAL OF THE ENVIRONMENTAL INSPECTOR, INSTALL INFIILTRATION AREAS V A. WETLANDS AND STREAM CROSSINGS 3.;32, PERMANENT SEEDING, OF THE VIRGINIA EROSION AND SEDIMENT CONTROL DENUDED AREAS IMMEDIATELY AFTER ACHIEVING FINAL GRADES. AND CONNECT ROOF DRAINS. THE CONSTRUCTED HAUL PATH WILL SHARE THE SAME ALIGNMENT AS THE FUTURE SANITARY SEWER FROM THE WEST VILLAGE CZI SEWER HANDBOOK. ANY FERTILIZER AND LIME APPLICATIONS SHALL BE IN ACCORDANCE WITH SOIL TEST RESULTS. ALL SEEDED AREAS WILL BE STRAW MULCHED TO 1 1. ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL RECEIVE STABILIZATION 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND [DAMAGE DUE TO S 3.14 S SEDIMENT BASIN CONNECTOR. THIS HAUL ROAD WILL CROSS OVER AN INTERMITTENT PROTECT AGAINST RILL EROSION AND TO PRESERVE SOIL MOISTURE THAT WILL WITH LANDSCAPING VEGETATION HARDIER THAN GRASS, WHICH WILL NOT INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER STREAM. AT THE COMPLETION OF THE EXCESS DIRT REMOVAL, THE HAUL PATH RETURN TO ITS NATURAL STATE UNTIL THE SANITARY SEWER LINE ENHANCE SEED GERMINATION. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR TRZACK WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON REQUIRE MOWING. RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM 12. AFTER SITE IS STABILIZED AND PERMISSION IS OBTAINED FROM THE EROSION QP 3.18 OUTLET PROTECTION IS CONSTRUCTED. SLOPES IF STRAW IS TO BE USED. RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CONTROL INSPECTOR, REMOVE SILT FENCING AND OTHER REMAINING EROSION CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE B. STEEP SLOPES THE CONSTRUCTION OF THE MASS GRADE AREAS WILL DISTURB CRITICAL EROSION CONTROL MAINTENANCE 1. IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONTROL MEASURES. EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQIUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:THIS PROJECT DOES NOT INCLUDE ANYSR 3 29 S R SURFACE ROUGHENING SLOPE AREAS, WHICH IS SHOWN ON THE OLD TRAIL ZMA. PERMANENT SEEDING AND MATTING SHALL BE USED STABILIZE ALL SLOPES STEEPER THAN 3H:1V CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL. THE FOLLOWING ITEMS WILL BE CHECKED IN PARTICULAR: 2. THE CONSTRUCTION ENTRANCE SHALL BE CHECKED DAILY FOR SOIL BUILDUP. EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE A. ADDITIONAL IMPERVIOUS SURFACES AND THE PROJECT AREA WILL BE RESTORED TO ITS EXISTING CONIDTIONS.THEREFORE WILL NO -T PRODUCE ANY ADDITIONAL STORMWATER RUNOFF. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE TS 3.31 TEMPORARY SEEDING TS'STABILITY STRUCTURAL PRACTICES IF THE ENTRANCE BECOMES CLOGGED WITH SOIL AND FAILS TO PREVENT APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING 1. SAFETY FENCE (3.01) - A TEMPORARY SAFETY FENCE SHALL BE CONSTRUCTED WHERE DEEMED NECESSARY DURING CONSTRUCTION TO THE TRANSPORTATION OF SOIL ONTO THE ROADWAY, ADDITIONAL STONE, REPLACEMENT OF STONE, OR A WASH -RACK MAY BE REQUIRED. FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SMALL BE APPLIED TO AREAS THAT ARE TO BE CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM ' 3.32 PS PERMANENT SEEDING D PROTECT THE MANHOLES AND SANITARY LINE FROM CONSTRUCTION TRAFFIC. LEFT DORMANT FOR MORE THAN ONE YEAR. ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE 3. SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND CONTRACTOR SHALL ESTABLISH A STABILIZED SITE, AND NOT ALLOW ANY SEDIMENT PERFORMED. 2. TEMPORARY CONSTRUCTION ENTRANCE (3.02) - A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT SITE ENTRANCE OFF OF AT LEAST DAILY DURING PROLONGED RAINFALL. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS TO 2. EXIT THE PROJECT LIMITS. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED USING THE VSMP CHANNEL PROTECTION CRITERIA. STORMWATER DISCHARGES ARE _ TR 3.38 TREE PROTECTION OLD TRAIL DRIVE. AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING CLASSIFIED INTO ONE OF THREE TYPES OF CHANNEL. 3. ROAD STABILIZATION 3.03) -ACCESS ROADS, PARKING AREAS, AND OTHER ( BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE BARRIER STILL BE NECESSARY THE FABRIC SHALL BE REPLACED AND THE AR PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENII- STABILIZATION OF ALL SOIL STOCKPILES ON (1) "MANMADE STORMWATER CONVEYANCE SYSTEM" MEANS A PIPE, DITCH VEGETATED SWALE OR OTHER STORMWATER CONVEYANCE DC 3.39 DUST CONTROL ON-SITE VEHICLE TRANSPORTATION ROUTES SHALL BE STABILIZED WITH SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED SYSTEM CONSTRUCTED BY MAN EXCEPT FOR RESTORED STORMWATER DC STONE IMMEDIATELY AFTER GRADING. EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY FROM THE PROJECT SITE. CONVEYANCE SYSTEMS OR, ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS CONTRACTOR TO PROTECT STOCKPILE AREAS WITH SILT FENCE. (A) THE MANMADE STORMWATER CONVEYANCE SYSTEM SHALL CONVEY 4. SILT FENCE BARRIER (3.05) - SILT FENCE BARRIERS WILL BE INSTALLED REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED THE POST -DEVELOPMENT PEAK FLOW RATE FROM THE TWO-YEAR TO FILTER RUNOFF FROM SHEET FLOW AS INDICATED ON THE EROSION AND SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED, O -AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION . EVENT WITHOUT CAUSING EROSION OF THE SYSTEM DETENTION OF SEDIMENT CONTROL PLAN. AND SEEDED. SHALL NOT CONSIDERED ESTABLISHED UNTIL GROUND COVER IS THE STORMWATER OR DOWNSTREAM IMPROVEMENTS MAY BE ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT INCORPORATED INTO THE APPROVED LAND -DISTURBING ACTIVITY TO 5. SUPER SILT FENCE BARRIER - WIRE -REINFORCED SILT FENCE BARRIER WILL 4. DIVERSION DIKES SHALL BE INSPECTED AFTER EVERY STORM AND REPAIRS EROSION. MEET THIS CRITERIA AT THE DISCRETION OF THE STORMWATER BE INSTALLED TO FILTER RUNOFF FROM SHEET FLOW AS INDICATED ON THE MADE TO THE DIKE, FLOW CHANNEL, OUTLET, OR SEDIMENT TRAPPING CONTRACTOR SHALL ESTABLISH A VEGETATIVE COVER ON ALL DENUDED AREAS. PROGRAM ADMINISTRATIVE AUTHORITY. FACILITY AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND ) THE PEAK (FLOW FOR CCONW (BSTORMWATER EROSION AND SEDIMENT CONTROL PLAN. EVENT HAS OCCURRED OR NOT, THE MEASURE SHALL BE INSPECTED AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS REPAIRS MADE IF NEEDED. DAMAGES CAUSED BY CONSTRUCTION TRAFFIC OR A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE TOENAT RALLESTORMWATERMENTS CONVEYANCE VEGETATIVE PRACTICES OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH WORKING FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. SYSTEMS SHALL BE MET. 1. SURFACE ROUGHENING (3.29) - ALL AREAS WITH A GRADE STEEPER THAN DAY, CONTRACTOR SHALL ESTABLISH THE PERIMETER CONTROLS OF SUPER SILT FENCE QDEVELOPED <= I.F. * (QPRE-DEV. * RVPRE-DEV.) / N:L O F 3:1 SHALL BE STAIR -STEP GRADED OR GROOVED (PLATE 3,29-4) TO AID IN AS THE FIRST STEP OF THE LANDS DISTURBANCE FOR THIS PROJECT. RVDEVELOPED UNDER NO CONDITION SHALL QDEVELOPED PRE ��� 1>4 lop GRASS ESTABLISHMENT, INCREASE INFILTRATION, AND TO SLOW RUNOFF 5. STORMWATER CONVEYANCE CHANNELS (WHERE APPLICABLE): 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH > Q -DEV. p cl VELOCITIES. 5.1. GRASS LINED CHANNELS - DURING THE INITIAL ESTABLISHMENT, GRASS AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. NOR SHALL QDEVELOPED BE REQUIRED TO BE LESS THAN THAT � l� LINED CHANNELS SHOULD BE REPAIRED IMMEDIATELY AND CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AFTER EACH RAINFALL QFOREST * RVPRE-DEV.)/RVDEVELOPED A 2. TOPSOILING & STOCKPILING (3.30) - TOPSOIL WILL BE STRIPPED FROM RE-ESTABLISHED IF NECESSARY. AFTER GRASS HAS BECOME EVENT. OR IN ACCORDANCE WITH ANOTHER METHODOLOGY THAT IS AREAS TO BE GRADED AND STOCKPILED FOR LATER USE. STOCKPILES ARE ESTABLISHED, THE CHANNEL SHOULD BE CHECKED PERIODICALLY TO 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND DEMONSTRATED BY THE VSMP AUTHORITY TO ACHIEVE EQUIVALENT DAVID M. ROBINSON TO BE STABILIZED WITH TEMPORARY VEGETATION R TO HAVE SILT FENCE DETERMINE IF THE GRASS IS WITHSTANDING FLOW VELOCITIES WITHOUT CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY RESULTS AND IS APPROVED BY THE BOARD. INSTALLED ALONG THE LOWER PERIMETER TO PROTECT DOWNSTREAM AREAS. DAMAGE. IF THE CHANNEL IS TO BE MOWED, IT SHOULD BE DONE IN THE TRAP OR BASIN. (2) "NATURAL STORMWATER CONVEYANCE SYSTEM" MEANS THE MAIN � 56760 A MANNER THAT IT WILL NOT DAMAGE THE GRASS. THERE ARE NO SEDIMENT TRAPS OR BASINS PROPOSED. CHANNEL OFA NATURAL STREAM AND THE FLOOD -PRONE AREA x'010 A �Ss10NAL 3. TEMPORARY SEEDING (3.31)-- AREAS NOT BROUGHT TO FINAL GRADE FOR 5.2. RIPRAP-LINED CHANNELS - RIPRAP LINED CHANNELS SHOULD BE A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC ADJACENT TO THE MAIN CHANNEL OR, siyG A PERIOD OF MORE THAN 14 DAYS SHALL BE STABILIZED WITH A CHECKED PERIODICALLY TO ENSURE THE SCOUR IS NOT OCCURRING YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL (3) "RESTORED STORMWATER CONVEYANCE SYSTEM" MEANS A TEMPORARY SEED MIXTURE ACCEPTABLE FOR THAT TIME OF YEAR. CRIMPING, BENEATH FABRIC UNDERLINING OF THE RIPRAP LAYER. THE CHANNEL DRAINAGE AREAS LESS THAN THREE ACRES. STORMWATER CONVEYANCE SYSTEM THAT HAS BEEN DESIGNED AND PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO SHOULD ALSO BE CHECKED TO DETERMINE THE STONES ARE NOT B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW CONSTRUCTED USING NATURAL CHANNEL DESIGN CONCEPTS. RESTORED INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE DISLODGED BY LARGE FLOWS. FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE STORMWATER CONVEYANCE SYSTEMS INCLUDE THE MAIIN CHANNEL AND USED. 5.3. IF SEDIMENT IS DEPOSITED IN A GRASS -LINED CHANNEL, IT SHOULD CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A THE FLOOD -PRONE AREA ADJACENT TO THE MAIN CHANNEL. BE REMOVED PROMPTLY TO PREVENT DAMAGE TO THE GRASS. SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. (A) THE DEVELOPMENT SHALL BE CONSISTENT, IN COMBINATION WITH 4. PERMANENT SEEDING (3.32) - AREAS BROUGHT TO FINAL GRADE OR THOSE SEDIMENT DEPOSITED IN A RIPRAP CHANNEL SHOULD BE REMOVED THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL OTHER STORMWATER RUNOFF, WITH THE DESIGN PARAMETERS OF- " REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS OCT. 12, 2018 DATE AUGUST 10, 2018 11 SCALE N/A CONTOUR INTERVAL N/A O T V4 *14 w t 2 �►/�'� y1N cr U F-4 Q CO i m al Z 0 0� a z U ® I`0) A OCC V Z Cc Lu cc >O � U Q L4 Oa c= OU LqZ IV1 W t? a; _j ®w w� J 'Q 6 4W J O W ryV,. � O J Z 20 N �to v, Q 0rz ; S. Q 4 V Q WO °C 4 %� = co L�2 0 S. �� w Ln V�S�� cc rx 4W VO z4 _.c Q� 20) aA W' a- 4 ` Z Z a OW REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS OCT. 12, 2018 DATE AUGUST 10, 2018 11 SCALE N/A CONTOUR INTERVAL N/A FILE NUMBER 8053 SHEET 5 of 7 O T z wog 0 �."JW 9 cl- 0 cr it 4�s �_ 4cqZ Z�OJZ J . WZ>� �_J3 O Z r Q Z CD O � U Q L4 Oa c= W Q W U C) W � m Zmo0Q O� J an O w cm cc v, Q W Wm2 Q FILE NUMBER 8053 SHEET 5 of 7 � cE CONSTRUCTIO�NE NTRANCE r TABLE 26 r 175-200 LBS. Seeding Rate Planting depth � Seedingzones 2 and Seeding Date 3 g - ;6 ASF"' T 05 . Per Lbs/1000 P 7a and 7b 6b F� IMENT t� `C,?'`� Tall fescue makes ............. Sq. ft t•!•!•!•!•!•!•!•!•!•!•11•!•!•!•!•!•!•!•!x.•!•!•!•. 00 off I •!•!•. .......... 11 ........ 5/1- 8/15- 3/15- PRQFILE 8/1- - SEASONAL NURSE CROP* 20 LBS. - CROWN VETCH** 20 LBS. 4/30 8/14 11/30 4/30 8/14 11/15 5/31 7/31 10/31 Choose one: RYE NOVEMBER 1ST THROUGH FEBRUARY 15TH ........ANNUAL RYE *** SUBSTITUTE SERICEA LESPEDEZA FC)R CROWNVETCH EAST OF FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, 1 OV _ RATE TO 30 LBS./ACRE. ALL LEGUME SEED MUST BE f 4aTIN0 I WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW MAINTENANCE MIX DURING WARMER SEEDING PERIODS; ADD 10- 20 LBS./ACRE IN MIXES. BY Barley 2.5 bu. 2.80 1-2 X Qf 10/15 X - 10/15 X - 10/1 Oats 3 bu. 2.21 1-2 - C: `CA - - X - - -x nf - - Rye (4) 2.5 bu. 3.22 1-2 X - X X - Le l VF'' - X y`'44-D711 ;.K �d l€ E -L Y.S I 41 9 I L '�Fi it- 'l�'?.�.tS 'ILd 1 ! �kT I Spring the year Not required. not closer Lovegrass & vQZ than 4" if occasional Service lespedeza Rye lus PLAN 3.45 SAF SAFETY FENCE SAFETY FENCE PERSPECTIVE VIEW PERSPECTIVE VIEW PLASTIC FENCE SOURCE: CONWED PLASTICS VDOT ROAD AND BRIDGE STANDARDS VA. DSWC Dv DIVERSION 10% SETTLEMENT PERSPECTIVE VIEW METAL FENCE DIVERSION PLATE. 3.1-1 TYPICAL VEE—SHAPED DIVERSION Source: Va. DSWC Plate 3.12-1 TP TREE PROTECTION 1 I III''I II Id 1111 �) ugh)) I SII I � � �•'r � �, .•.•.•.•.•.•.•.•.•.•.•. ;1.•.•.•.•.•.•.•.•.•M; I � ��iiiiiiiiiiii I�i•�•iiiiiiiii ' i❖:❖:❖:❖:❖:•i i �:❖:❖:❖:•:❖:•:� i (� :. • � \I �::•.00.❖0000.l0000•.o•.00�l '� .' Vii•.❖•❖•❖.❖.•� 1 �.••❖••.❖•••••••••11 ............1 ...........III ................... �� ,moi ►� "� �'^ (TEMPORARY SEEDING MIXTURES FOR T)S THE PIEDMONT AREA TABLE 26 r 175-200 LBS. Seeding Rate Planting depth � Seedingzones 2 and Seeding Date 3 g Species (1) Per Lbs/1000 HIGH MAINTENANCE LAWN 7a and 7b 6b 6a and 5b GENERAL SLOPE (3:1 OR LESS) Tall fescue makes ............. Sq. ft t•!•!•!•!•!•!•!•!•!•!•11•!•!•!•!•!•!•!•!x.•!•!•!•. 00 off I •!•!•. .......... 11 ........ 5/1- 8/15- 3/15- 6/1- 8/1- - SEASONAL NURSE CROP* 20 LBS. - CROWN VETCH** 20 LBS. 4/30 PERSPECTIVE VIEW PLASTIC FENCE SOURCE: CONWED PLASTICS VDOT ROAD AND BRIDGE STANDARDS VA. DSWC Dv DIVERSION 10% SETTLEMENT PERSPECTIVE VIEW METAL FENCE DIVERSION PLATE. 3.1-1 TYPICAL VEE—SHAPED DIVERSION Source: Va. DSWC Plate 3.12-1 TP TREE PROTECTION 1 I III''I II Id 1111 �) ugh)) I SII I � � �•'r � �, .•.•.•.•.•.•.•.•.•.•.•. ;1.•.•.•.•.•.•.•.•.•M; I � ��iiiiiiiiiiii I�i•�•iiiiiiiii ' i❖:❖:❖:❖:❖:•i i �:❖:❖:❖:•:❖:•:� i (� :. • � \I �::•.00.❖0000.l0000•.o•.00�l '� .' Vii•.❖•❖•❖.❖.•� 1 �.••❖••.❖•••••••••11 ............1 ...........III ................... �� ,moi ►� "� �'^ (TEMPORARY SEEDING MIXTURES FOR T)S THE PIEDMONT AREA e� S�0 r TRA CLING SOURCE: MICHIGAN SOIL EROSION AND SEDIMENTATION GUIDE ssF SUPER SILT FENCE CONSTRUCTION OF A SILT FENCE (WITH WIRE S UPP OR T) 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THIE LINE OF POSTS. FLOW -- l 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO) THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. G FLO W �I��I11 EXITENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, PLATE. 3.05-1 Sherwood & wi nt SUGGESTED TEMPORARY SEEDING MIXTURE FERTILIZER: 10-20-10: 1,000 LBS/ACRE SEPTEMBER -FEBRUARY 15: 50% ANNUAL RYE & 50% WINTER RYE 100 LBS/ACRE FEBRUARY 16 -APRIL 30: ANNUAL RYE 100 LBS/ACRE MAY -AUGUST: GERMAN MILLET 50 LBS/ACRE OTHER OPTIONS EXIST, SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK. SUGGESTED PERMANENT SEEDING MIXTURE LIME: 2 TONS/ACRE FERTILIZER: 10-20-10 1,000 LBS/ACRE MARCH -MAY 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE MAY 16 -AUGUST 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, FOXTAIL MILLET 20 LBS/ACRE AUGUST 16 -OCTOBER: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE NOVEMBER -FEBRUARY: KENTUCKY 31 FESCUE 200 LBS/ACRE, WINTER RYE 20 LBS/ACRE PLATE. 3.29-4 PERMANENT SEEDING MIXTURES FOR PS )THE PIEDMONT AREA TABLE 25 TABLE 26 TEMPORARY SEEDINGS BY RATES, DEPTHS, AND DATES 175-200 LBS. Seeding Rate Planting depth � Seedingzones 2 and Seeding Date 3 g Species (1) Per Lbs/1000 HIGH MAINTENANCE LAWN 7a and 7b 6b 6a and 5b GENERAL SLOPE (3:1 OR LESS) Tall fescue makes acre Sq. ft (Inches) 2/1- 5/1- 8/15- 3/1- 5/1- 8/15- 3/15- 6/1- 8/1- - SEASONAL NURSE CROP* 20 LBS. - CROWN VETCH** 20 LBS. 4/30 8/14 11/30 4/30 8/14 11/15 5/31 7/31 10/31 Choose one: RYE NOVEMBER 1ST THROUGH FEBRUARY 15TH ........ANNUAL RYE *** SUBSTITUTE SERICEA LESPEDEZA FC)R CROWNVETCH EAST OF FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, BY UNHULLED SERICEA.) IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL LEGUME SEED MUST BE BY WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW MAINTENANCE MIX DURING WARMER SEEDING PERIODS; ADD 10- 20 LBS./ACRE IN MIXES. BY Barley 2.5 bu. 2.80 1-2 X - 10/15 X - 10/15 X - 10/1 Oats 3 bu. 2.21 1-2 X - - X - - X - - Rye (4) 2.5 bu. 3.22 1-2 X - X X - X X - X are or Spring the year Not required. not closer Lovegrass & following than 4" if occasional Service lespedeza Rye lus 150 lbs. 3.45 1 X X 10/15 X X 10/15 X X 10/1 Foxtail years thereafter. matured. X X X X X X X X X millet 5 days later 1 fescue, Kentucky December, May bluegrass; and closer bluegrass, hard 20-10-10 100 2.3 Weeping 4lbs. 0.09 1/4-1/2 - X - - X - - X - lovegrass Annual ryegrasS 50 lbs. 1.15 1/4-1/2 X - 11/1 X - 11/1 X - 8/15 Millet (7) 50 lbs. 1.15 1/2 - X - - X - - X - (1) Applicable on slopes of 3:1 or flatter (2) Refer to figure A - Adopted from USDA, ARS Miscellaneous Publication #1475, January 1990 (3) Between fall and spring seeding dates, use mulch only if ground is frozen and reseed when thawed (4) May be used as a nurse crop for late fall/early winter permanent seedings, add 56 lbs/ac. to the permanent seeding mixture (4) Maryland State Highway Administration Temporary Seed Mix (5) May be used as a nurse crop for mid -summer permanent seedings. Add 2 lbs/ac to permanent seed mix. (6) May be used as a nurse crop for mid -summer permanent seedings. Add 10 lbs/ac. to the permanent seeding mix. e� S�0 r TRA CLING SOURCE: MICHIGAN SOIL EROSION AND SEDIMENTATION GUIDE ssF SUPER SILT FENCE CONSTRUCTION OF A SILT FENCE (WITH WIRE S UPP OR T) 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THIE LINE OF POSTS. FLOW -- l 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO) THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. G FLO W �I��I11 EXITENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, PLATE. 3.05-1 Sherwood & wi nt SUGGESTED TEMPORARY SEEDING MIXTURE FERTILIZER: 10-20-10: 1,000 LBS/ACRE SEPTEMBER -FEBRUARY 15: 50% ANNUAL RYE & 50% WINTER RYE 100 LBS/ACRE FEBRUARY 16 -APRIL 30: ANNUAL RYE 100 LBS/ACRE MAY -AUGUST: GERMAN MILLET 50 LBS/ACRE OTHER OPTIONS EXIST, SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK. SUGGESTED PERMANENT SEEDING MIXTURE LIME: 2 TONS/ACRE FERTILIZER: 10-20-10 1,000 LBS/ACRE MARCH -MAY 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE MAY 16 -AUGUST 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, FOXTAIL MILLET 20 LBS/ACRE AUGUST 16 -OCTOBER: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE NOVEMBER -FEBRUARY: KENTUCKY 31 FESCUE 200 LBS/ACRE, WINTER RYE 20 LBS/ACRE PLATE. 3.29-4 PERMANENT SEEDING MIXTURES FOR PS )THE PIEDMONT AREA TABLE 25 TOTAL LBS. PER ACRE MINIMUM CARE LAWN - COMMERCIAL OR RESIDENTIAL 175-200 LBS. - KENTUCKY 31 OR TURF -TYPE TALL FESCUE 95-100% - IMPROVED PERENNIAL RYE GRASS 0-5% - KENTUCKY BLUEGRASS 0-5% HIGH MAINTENANCE LAWN 200-250 LBS. - KENTUCKY 31 OR TURF -TYPE TALL FESCUE 100% GENERAL SLOPE (3:1 OR LESS) Tall fescue makes - KENTUCKY 31 FESCUE 128 LBS. - RED TOP GRASS 2 LBS. - SEASONAL NURSE CROP* 20 LBS, LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1) 400 - KENTUCKY 31 FESCUE 108 LBS. - RED TOP GRASS 2 LBS. - SEASONAL NURSE CROP* 20 LBS. - CROWN VETCH** 20 LBS. desired. TOTAL 150 LBS. *USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW: FEBRUARY 16TH THROUGH APRIL 30TH............ ANNUAL RYE MAY 1ST THROUGH AUGUST 15TH ................ FOXTAIL MILLET AUGUST 16TH THROUGH OCTOBER ;31ST...........ANNUAL RYE NOVEMBER 1ST THROUGH FEBRUARY 15TH ........ANNUAL RYE *** SUBSTITUTE SERICEA LESPEDEZA FC)R CROWNVETCH EAST OF FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL OTHER PERIODS, USE UNHULLED SERICEA.) IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL LEGUME SEED MUST BE PROPERLY INNOCULATED. WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW MAINTENANCE MIX DURING WARMER SEEDING PERIODS; ADD 10- 20 LBS./ACRE IN MIXES. PERMANENT SEEDIING FERTILIZATION PS AND MAINTENANCE TABLE 24 Maintenance Fertilization for Permanent Seedings Use Soil Test Recommendation or Rates Shown Below Seeding Mixture Formulation Lbs. per Lbs. per Time Mowing CID Acre 1000 SS I.L Tall fescue makes 10-10-10 500 11.5 Yearly, or as *Not closer than 3" if up 70% or more or 400 9.2 needed fall occasional mowing is of cover. 30-10-10 W LL O V desired. �W >® Zp�� Spring the year Do not mow crownvetch Crownvetch Service lespedeza 0-20-0 400 9,2 following Q co Uq JZ �W N CM 0Wo♦^ establishment p BirdSSFoot trefoil � w 2 c and every 4-5 W 0� 0W LU U) Q� years thereafter. N Z 9 2IJ 0) Fairly uniform 'L qy Fall the year Not required. not closer stand of Tall Fri �R \IJ following than 4" if occasional Tescue & Service 5-10-10 500 91.5 establish- ment mowing is desired, and lespedeza, or and every 4-5 then in fall after seed BirdSSFoot years thereafter. has matured. Weeping Spring the year Not required. not closer Lovegrass & following than 4" if occasional Service lespedeza 5-10-10 500 111.5 establishment mowing is desired, and fairly uniform plant and every 3-4 fall after sericea has distribution years thereafter. matured. Red & chewings 20-10-10 250 5.8 September, 30 Mow no closer than 2" for red fescue and Ky days later fescue, Kentucky December, May bluegrass; and closer bluegrass, hard 20-10-10 100 2.3 20 -June -30; if than 311 for fescue. fescue mixture: needed. ^A x.. - •- SII EACH LIFT OF THE FILL IS COMPACTED, BUT THE OUTER FACE OF THE SLOPE IS ALLOWED TO REMAIN LOOSE SO THAT THE ROCKS, CLODS, ETC. REACH THE NATURAL ANGLE OF REPOSE. FILL SLOPE TREA TMENT SOURCE: VA. DSWC PLATE. 3.29-3 STAIR STEPPING CUT SLOPES DEBRIS FROM SLOPE ABOVE IS CAUGHT BY STEPS-,,,., I I-II II; III o _ DRAINAGE iTl l 111- 40"-50" SOURCE: VA. DSWC WATER, SOIL AND FERTILIZER ARE HELD BY STEPS - PLANTS CAN BECOME ESTABLISHED ON THE STEPS. GR 0 0 VING SLOPES GROOVING IS CUTTING FURROWS ALONG THE CONTOUR OF A SLOPE. IRREGULARITIES IN THE SOIL SURFACE CATCH RAINWATER AND PROVIDE SOME COVERAGE OF LIME, FERTILIZER AND SEED. SOURCE: VA. DSWC 0 PLATE 3.29-1 PLATE 3.29-2 p'TH OF P701 � O � DAVID M. ROBINSON Lic. No. 56760 ONAL /I REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS OCT. 12, 2018 DATE AUGUST 10, 2018 SCALE N/A CONTOUR INTERVAL N/A O o �/'� O V D U w CID I.L QUO WzZ U W2N OHO men Old C3- Q.2 ON z0 Z W LL O V I� Q O�OQ_j �W >® Zp�� OU �Z Cn ® Z oy N J W a Q Q co Uq JZ �W N CM 0Wo♦^ y, p L7 � w 2 c ^� W 0� 0W LU U) Q� rt a W N Z 9 2IJ 0) M� 'L qy Fri �R \IJ Z 2 = a CLU REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS OCT. 12, 2018 DATE AUGUST 10, 2018 SCALE N/A CONTOUR INTERVAL N/A O o �/'� O V D FILE NUMBER 8053 SHEET 6 of 7 CID I.L QUO WzZ OHO a Z Old C3- o J 0 WWZ>> Z W LL O Z I� Q O�OQ_j � � U Zp�� Z W�m C> Om — �LU a Q 4 J 0Wo♦^ 0 Cr Vl W Z tD W Q Q� FILE NUMBER 8053 SHEET 6 of 7 675 670 ••! 655 650 645 640 635 630 625 0+00 +20 +40 +60 +80 1+00 aOMLq OC� 7 1Pg1D 0000) 6) - (o to - c0 c0 (o co c0 f0 U U oP OUTLET PROTECTION PIPE OUTLET CONDI TIONS A ^ A 'IPE OUTLET TO FLAT ,REA WITH NO DEFINED 'HANNEL L a 0% d SECTION A -A FILTER CLOTH KEY IN 6"-9'; RECOMMENDED FOR ENTIRE PERIMETER ado (MIN.) +20 +40 +60 +80 2+00 +20 +40 +60 O In co M n N in 00 U OUTLET PROTECTION SPECIFICATIONS SEDIMENT BASIN/EXTENDED DETENTION r,/UNDERLYING Y L P AP OUTFLOW . DEPTH ®� 36" F.F 1 1 Q2 = 10 cfs APRON LENGTH = 15' NEW APRON LENGTH = 20' 675 670 665 ••• 655 650 645 640 635 e CO� TEMPORARY SEDIMENT TRAP CALCULATIONS ST #1 Drainage; Area= 2.85 acres -STORAGE 0 T Z NOTE: THIS SEDIMENT BASIN WAS CONSTRUCTED Elev(Ft) Design Volumes:: Storage(CY) Storage(Acre-Ft) STAGE -STORAGE REPORT UNDER WP0201800010 AND WILL BE USED FOR THE MASS SCALE 1" = 5' VERTICAL Wet Storage - 0.000 195.840 0.004 644.000 GRADING (OF BLOCK 32. THIS BASIN WILL BE CONVERTED TO 5 Minimum Volumes Req'd. = 67 cy * 2.85 acres = 191 cy Elev(Ft) Storage(CF) A SWM FACILITY UPON COMPLETION OF THE DEVELOPMENT Area(SSF) Available Basi.n Volume Prov'd. = 193 cy @ 643.75 640.000 0.000 AND WILL BE REFLECTED ON THE FINAL WPO PLAN. 2.5 Dry Storage- Minimum Volumes Req'd. = 67 cy * 2.85 acres = 191 cy 642.000 2216.667 82.099 1206.518 Available Basin Volume Prov'd. = 195 cy @ 646.00 644.000 5636.683 208.766 1779.081 31584.229 1169.786 0.725 646.000 10490.706 388.545 0 Design Elevati.ons: 1.061 8261.695 0.190 Top of Berm = 646.00 SCALE IN FEET SCALE 1" = 20' HORIZONTAL Berm Width = 4' Weir Elev = 64:3.75 Weir Width = 81' Floor Elev = 640.00 Sediment Cleanout Elev = 643.75 v' \ 20 10 0 20 40 \ SCALE IN FEET \ 9�y�\ DAM SHALLBE L D TO 655.0 FOR E BASIN ST RAGE Vis\ cs\ SWAY EMERGENCo :25 SHALL EAD TED TO 653,00 4" DEWATERI G >/- TOP OF DAM=654. 0 ORIFICE=649 50 / APPR X. LOCATION OF FUTURE / BI RETENTION FACILITY \ \ 25' EM RGENCY 3:1 3:1 SPILLWA =652.00 \ \60" RCP RISE / \ (2) FUTUR 8"b OP=651.00 / \ ORIFI=64 .00 \ \ _.. BOTTOM OF SEDIMENT BASIN = 642.0 f. OUTLET PROTECTION SEE DE IGN DETAILS FOR 105' OF 36" RCP BARREL ­/DIMENSIONS INV IN=642. 0 INV OUT=64 .25 OUTLET PROTECTION HALL EXTENDED FROM 15'T :BESLOPE=1.6 20'R ADEQUACY 0+00 +20 +40 +60 +80 1+00 aOMLq OC� 7 1Pg1D 0000) 6) - (o to - c0 c0 (o co c0 f0 U U oP OUTLET PROTECTION PIPE OUTLET CONDI TIONS A ^ A 'IPE OUTLET TO FLAT ,REA WITH NO DEFINED 'HANNEL L a 0% d SECTION A -A FILTER CLOTH KEY IN 6"-9'; RECOMMENDED FOR ENTIRE PERIMETER ado (MIN.) +20 +40 +60 +80 2+00 +20 +40 +60 O In co M n N in 00 U OUTLET PROTECTION SPECIFICATIONS SEDIMENT BASIN/EXTENDED DETENTION r,/UNDERLYING Y L P AP OUTFLOW . DEPTH ®� 36" F.F 1 1 Q2 = 10 cfs APRON LENGTH = 15' NEW APRON LENGTH = 20' 675 670 665 ••• 655 650 645 640 635 e CO� TEMPORARY SEDIMENT TRAP CALCULATIONS ST #1 Drainage; Area= 2.85 acres -STORAGE 0 T Z LU Z Elev(Ft) Design Volumes:: Storage(CY) Storage(Acre-Ft) STAGE -STORAGE REPORT 642.000 0.000 Wet Storage - 0.000 195.840 0.004 644.000 831.004 30.778 Minimum Volumes Req'd. = 67 cy * 2.85 acres = 191 cy Elev(Ft) Storage(CF) Storage(CY) Area(SSF) Available Basi.n Volume Prov'd. = 193 cy @ 643.75 640.000 0.000 0.000 733.051 Dry Storage- Minimum Volumes Req'd. = 67 cy * 2.85 acres = 191 cy 642.000 2216.667 82.099 1206.518 Available Basin Volume Prov'd. = 195 cy @ 646.00 644.000 5636.683 208.766 1779.081 31584.229 1169.786 0.725 646.000 10490.706 388.545 2448.224 Design Elevati.ons: 1.061 8261.695 0.190 Top of Berm = 646.00 Berm Width = 4' Weir Elev = 64:3.75 Weir Width = 81' Floor Elev = 640.00 Sediment Cleanout Elev = 643.75 ST #2 Drainages Area= 2.25 acres Design Volumes:: STAGE -STORAGE REPORT f Wet Storage - Minimum Volume: Req'd. = 67 cy * 2.25 acres = 151 cy Elev(Ft) Storage(CF) Storage(CY) Area(SSF) t Available Basin Volume Prov'd. = 161 cy @ 655.25 652.000 0.000 0.000 733.051 Dry Storage - Minimum Volumes Req'd. = 67 cy * 2.25 acres = 151 cy 654.000 2216.667 82.099 1206.518 t Available Basin Volume Prov'd. = 227 cy @ 658.00 656.000 5636.683 208.766 1779.081 SCALE 1" = 20' 658.000 10490.706 388.545 2448.224 20 10 0 20 40 Design Elevations: Top of Berm = 658.00 Berm Width = 4' SCALE IN FEET Weir Elev = 65,5.25 Weir Width = 8'' Floor Elev = 652.00 Sediment Cleanout Elev = 655.25 ST #3 Drainage. Area= 1.82 acres Design Volumes: STAGE -STORAGE REPORT Wet Storage - Minimum Volume: Req'd. = 67 cy * 1.82 acres = 122 cy Elev(Ft) Storage(CF) Storage(CY) Area(SSF) 5 U Available Basin Volume Prov'd. = 128 cy @ 700.00 696.000 0.000 0.000 360.654 6 Storage- 6 �' ge- 698.000 1242.913 46.034 733.051 65 p �� Minimum Volumes Req'd. = 67 cy * 1.82 acres = 122 cy y 126 Available Basin Volume Prov'd. = c @ 702.00 700.000 3459.580 128.133 1206.518 E 654 6So 702.000 6879.593 254.800 1779.338 6S2 6S Design Elevations: p = 2.00 6S - Top of Berm 70 Berm Width - 4 ' 6 Weir Width le= 700.00 S_. . _. 6 .._ Weir id h = &I Floor Elev = 696.00 6 S8 Sediment Cleanout Elev = 700.00 SCALE 1" = 20' 20 10 0 20 40 625 SCALE IN FEET BASIN STAGE -STORAGE 0 T Z LU Z Elev(Ft) Storage(CF) Storage(CY) Storage(Acre-Ft) Area(SSF) Area(Acre) 642.000 0.000 0.000 0.000 195.840 0.004 644.000 831.004 30.778 0.019 661.054 0.015 646.000 2823.802 104.585 0.065 1361.270 0.031 648.000 6453.083 239.003 0.148 2296.149 0.053 650.000 12157.308 450.271 0.279 3438.624 0).079 652.000 20376.829 754.697 0.468 4818.813 0).111 654.000 31584.229 1169.786 0.725 6426.504 0.148 656.000 46234.511 1712.389 1.061 8261.695 0.190 BASIN STORAGE REQUIRED = 10.34 ACRES*134 CY =1386 CY BASIN STORAGE PROVIDED = 1441 CY 0 655.00 (TOP OF DAM) PIPE OUTLET TO WELL EXISTING SEDIMENT BASIN NOTES: DEFINED CHANNEL DRAINAGE AREA TO SEDIMENT BASIN HAS TEMPORARILY BEEN INCREASED FROM 5.85 ACRES TO 10.34 ACRES FOR THE: MASS GRADING PLAN. PLAN VIEW STORM EVENTS ARE REFLECTED BELOW BASED ON NEW TEMPORARY DRAINAGE PATTERNS AND DESIGN PARAMETERS HAVE BEEN ADJUSTED ACCORDINGLY AND ARE SHOWN ON THESE PLANS. FINAL DRAINAGE PATTERNS WILL BE DETERMINED ON THE FINAL WPO PLAN. L a STORM EVENTS FOR SEDIMENT BASIN EVENT INFLOW (CFS) ROUTED(CFS) MAX ELEVATION (FT), STORAGE (CIUBIC YD) d SECTION A -A 2 -YR 21.83 20.91 652.33 823 FILTER CLOTH KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION 10 -YR 51.73 50.98 652.61 881 BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED 25 -YR 67.36 66.44 652.73 902 USING PLATES 3.18-3 AND 3.18-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. Source: Va. DSWC Plate 3.18-1 0 O�O SCALE 1" = 20' 20 10 0 20 40 SCALE IN FEET UM.ROBINSON SCALE 1" = 20' 20 10 0 20 40 SCALE IN FEET w V a 0 T Z LU Z U _ W Z co Nco m a. CL z 0 �..� Z a� 95@ O WZZ w >_ o g OU rn 0 ? » W Z Z Q UQ oW W Q Q ? N 2t7 ULO Q O�O�� (n T� V Zc)c Q 0 �Z OU. < � 0 w �n CO aW Ho 20) a W a� � J 0ME ~a0 W Z 2 Z CL ® W CQC L Q REVISIONS COUNTY COMMENTS SEPT. 24, 2018 COUNTY COMMENTS OCT. 12, 2018 I DATE AUGUST 10, 2018 SCALE AS SHOWN CONTOUR INTERVAL N/A FILE NUMBER 8053 SHEET 7 of 7 0 T Z O O_ I a. .NJW O O Z9 WZZ CSO a 06VU�>I Z w W Z W OJO Q O�O�� (n - U Zc)c < Z C=M W Omo a O W '_' 9 J 0ME ~a0 frW M WZrn W CQC L Q FILE NUMBER 8053 SHEET 7 of 7