Loading...
HomeMy WebLinkAboutSDP201900001 Public Notification 2019-01-07COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 MEMORANDUM TO: MEMBERS, SITE REVIEW COMMITTEE: Adam Moore — VDOT (Charlottesville) Frank Pohl — Engineering Health Dept. — (Charlottesville) Richard Nelson — ACSA Tim Keller — At -Large PC Member Michael Dellinger — Inspections Andrew Walker — GIS Shawn Maddox — Fire & Rescue Dan Mahon — Parks & Rec. Margaret Maliszewski — ARB Brian Walton — Thomas Jefferson Soil and Water Conservation District FROM: Albemarle County Department of Community Development — Division of Planning DATE: January 15, 2019 RE: Site Review Committee Meeting — Thursday 10 a.m., Meeting Room #235, Second Floor, County Office Building Attached is the list of site plans and subdivisions to be reviewed based on the schedule below. This list may include electronic submittals which maybe accessed by clicking on the link provided. Please review these projects and send your written comments to the applicable planner by the Monday preceding the Thursday meeting. The Submission and Review Schedule is: SITE REVIEW: February 21, 2019 For the attached site plans please review each plan for compliance with the technical requirements of Chapters 14 and 18 of the Code of the County of Albemarle and/or other applicable laws enforced by your agency/department. Please either Recommend approval, including conditions that must be met prior to approval of the final plan and including conditions required to be satisfied before a grading permit may be issued under chapter 17 of the Code. Any recommended conditions shall pertain to any requirements of this chapter and other applicable laws. Or, Recommend denial. Any recommendation for denial shall clearly state what requirements of Chapter 18 of the Code or other applicable laws that the plan does not satisfy. If you have any recommendations for revisions please feel free to provide that information. Please be clear in your comments what a "required" revision is and what a "recommended" revision is. If you are unable to attend the meeting, please submit your comments so they will be available at the meeting. PROJECT LEAD REVIEWER: Christopher Perez PROJECT: SUB201800225 North Pointe Middle and Northeast Residential Subdivision - Preliminary Plat MAGISTERIAL DISTRICT: Rivanna TAX MAP/PARCELS: 03200000002000, 03200000002300, 032000000023A0, 032000000023B0, 032000000023CO3 032000000023D0, 032000000023E0, 032000000023170, 032000000023G0, 032000000023H0, 032000000023JO LOCATION: Vacant land on Rte. 29 and Pritchett Lane, part of the North Pointe development. PROPOSAL: To construct 181 units: 174 single family detached (SFD) units and 7 carriage homes on 120+ acres. ZONING: ZMA2013-14, ZMA2013-7, and ZMA2000-9 Planned Development Mixed Commercial (PDMC) - large- scale commercial uses; residential by special use permit (15 units/acre). ENTRANCE CORRIDOR: Yes PROFFERS: Yes OVERLAY DISTRICT: Airport Impact, State Dam Break Inundation zone, Flood Hazard Overlay, Steep Slopes (Managed and Preserved), and Water Protection Ordinance (WPO) Buffers. COMPREHENSIVE PLAN: Urban Density Residential — residential (6.01 — 34 units/ acre); supporting uses such as religious institutions, schools, commercial, office and service uses. Privately Owned Open Space; Environmental Features — privately owned recreational amenities and open space; floodplains, steep slopes, wetlands, and other environmental features. PROJECT LEAD REVIEWER: Cameron Langille PROJECT: SDP201900001 Berkmar Drive Apartments — Initial Site Plan MAGISTERIAL DISTRICT: Rio TAX MAP/PARCEL: 03200000005100; 03200000005200; 03200000005300; 03200000005400; 03200000005500 LOCATION: West side of Berkmar Drive (Route 1403), approximately 1/2 mile south of the intersection of Berkmar Drive and Town Center Boulevard. PROPOSAL: Request for initial site plan approval to construct 296 multi -family dwellings within twelve (12) buildings on approximately 17.40 acres with a 10% bonus density increase for preservation of existing wooded features. The proposed gross density of the development is 17.01 units/acre. The site plan also proposes off-street parking and recreational amenities within the project area. The properties are subject to the proffers of ZMA199200014. ZONING: R15 Residential (15 units/acre) PROFFERS: Yes OVERLAY DISTRICT: Steep Slopes — Managed; (AIA) Airport Impact Overlay District COMPREHENSIVE PLAN: Light Industrial — manufacturing from prepared materials, processing, fabrication, assembly, and distribution of products in the Hollymead-Places29 Master Plan. Cc: Architectural Review Board Krystal Brinkley Jennifer Whitaker Melvin Kosler Sprint -Manager of Engineering Ronnie Rutherford E-mail copy: Board of Supervisors Joe Letteri David Benish Claudette Borgersen Jeff Werner Steve Blaine Mike Heckman Sabrina Stanwood William D. Fritz Mary Hughes Irene Peterson United States Postal Service Sandy VonThelen Scott B. Peyton Planning Commission Dan Mahon Donna Shaunesey Jack McClelland Steve Watson Melissa Wiley Francis MacCall Steve Allshouse Doug Walker