Loading...
HomeMy WebLinkAboutSDP201800025 Plan - Approved Minor Amendment 2018-06-13Ok luvHj @IV 01 CONTACT INFORMATION REJL ' ERENCEI S ♦BOUNDARY & TOPOGRAPHIC/ALTA SURVEY: "ALTA/ACSM LAND TITLE SURVEY OF THE PROPERTY OF BRASS, INC." PREPARED BY: KIRK HUGHES AND ASSOCIATES PROJECT NUMBER: 97-159 DATED: MARCH 3, 1998 (REVISED JULY 8, 2003) ♦GEOTECHNICAL REPORT: "REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS." PREPARED BY: ECS MID -ATLANTIC, LLC PROJECT NUMBER: 28:1552 DATED: MARCH 29, 2013 ♦ZONING APPLICATION PLAN AMENDMENT: "ZMA #2009-001 ZONING APPLICATION PLAN AMENDMENT FOR 5TH STREET - AVON CENTER" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED: MARCH 5, 2012 (REVISED AUGUST 31, 2012) ♦FLOODPLAIN SPECIAL USE PERMIT.- "SPECIAL ERMIT:"SPECIAL USE PERMIT - FLOODPLAIN FILL EXHIBIT" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED: SEPTEMBER 21, 2012 (REVISED DECEMBER 14, 2012) ♦CRITICAL SLOPES SPECIAL EXCEPTION: "CRITICAL SLOPES EXHIBIT" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED: MARCH 5, 2012 ♦ WATER PROTECTION ORDINANCE: "WATER PROTECTION ORDINANCE - LANDFILL CAPPING PLAN" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED: DECEMBER 23, 2014 (REVISED FEBRUARY 6, 2015) ♦ WATER PROTECTION ORDINANCE: "MINOR GRADING PLAN FOR STREAM ACCESS AT AVON LANDFILL" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED: DECEMBER 19, 2013 (REVISED APRIL 10, 2013) ♦ WATER PROTECTION ORDINANCE "WATER PROTECTION ORDINANCE - PHASE I FOR 5TH STREET STATION" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED: NOVEMBER 26, 2013 (REVISED APRIL 17, 2014) ♦ WATER PROTECTION ORDINANCE: "WATER PROTECTION ORDINANCE PLAN - E&S PHASE 11 AND SWM/BMP DESIGN" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED. DECEMBER 13, 2013 (REVISED MAY 19, 2014) ♦ SITE PLAN - WEGMANS: "FINAL SITE PLAN FOR 5TH STREET STATION - WEGMANS" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED: OCTOBER 30, 2014 ♦ROAD IMPROVEMENT PLAN: "ROAD IMPROVEMENT PLAN FOR 5TH STREET STATION - BENT CREEK PARKWAY" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED: NOVEMBER 26, 2013 (REVISED MAY 5, 2015) ♦ ROAD IMPROVEMENT PLAN: "ROAD IMPROVEMENT PLAN FOR FIFTH STREET AND BENT CREEK ROAD INTERSECTION" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: V122001 DATED: APRIL 26, 2013 (REVISED JUNE 11, 2015) ♦ WETLANDS PERMIT: "VIRGINIA WATER PROTECTION (VWP) GENERAL PERMIT NO. WP4" VkAJP GENERAL PERMIT AUTHORIZATION NO, WP4-13-1602 AUTHORIZATION EFFECTIVE DATE: DECEMBER 11, 2013 AUTHORIZATION EXPIRATION DATE: DECEMBER 10, 2020 PERMITTEE: S.J. COLLINS ENTERPRISES G 0 VE RING A (GENCIES ♦ COUNTY OF ALBEMARLE DEPARTMENT OF COMMUNITY DEVELOPMENT 401 McINTIRE ROAD CHARLOTTESVILLE, VA 22902 TEL: (434) 296-5832 FAX: (434) 972-4126 UT1 1LITIES ♦ ALBEMARLE COUNTY SERVICE AUTHORITY 168 SPOTNAP ROAD CHARLOTTESVILLE, VA 22911 TEL: (434) 977-4511 GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION, SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE T( THE SPECIFICATIONS ORAPPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORKAS DEFINED BY THE DRAWINGS AND II, FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. 1=17110mm 0 I'tmoll wil(Ill .1 . 1"1 ITT 076M 1 -00-00-002AO O76M 1-00-00-00280 O76M 1-00-00-004AO 07700-00-010-011 EO LOCATION OF SITE NORTH OF INTERSTATE 64 BETWEEN 5TH STREET AND AVON STREET EXTENDED SCOTTSVILLE MAGISTERIAL DISTRICT Rl S ALBEMARLE COUNTY, VIRGINIA ;p` FRYS PRING ST Ay n Avenu VIL • vE: VIEW'S o : Park P`0s st P d yp , l 0 � x Z R0::_ LANom 111 An s cIR °ptelea C����iyr Squa p1- E �Q N / v Cl G�q Silo' f A m ORB I i G Y O J m SITE RRET 4 Doy� At 12 900! TRY , RE yy °`�ACharlottes ille-Albemarle; Fy = N ypJo Se urity Cemple 4 rq °r'D ti �° 9°vdr ;s- �,OFY • aho86 .. 780 cas O z� �" � FO LUB ti4 O � HIK.� PoXRpRNIA 9/. F,�SDUr �W s�^r AUSMH"x�CT 5 Fy HItM r kTk$ rF MLuao o / g N N �eai h� �� \�� QJ@ !`p rfGR,�'�K ANDRID` !q v CT ¢ v H Ta s`Oa (11'r R yno EST' lar.P Lake R LOCATION MAP GOPYRIGH I AUG 1 HE MAP PEOPLE PERMIT USE NO. 210602153-5 SCALE: 1 "=2(000' ♦ OWNERS: AVON HOLDINGS, LLC 1209 NORTH ORANGE STREET WILMINGTON, DE 19801 5TH ST. STATION VENTURES, LLC. 5B SOUTHWEST BROAD STREET FAIRBURN, GA 30213 (770)692-8300 CONTACT: DANIEL S. TUCKER *APPLICANT 5TH ST. STATION VENTURES, LLC 5B SOUTHWEST BROAD STREET FAIRBURN, GA 30213 (770)692-8300 CONTACT: DANIEL S. TUCKER 10165401�11 12111, i RNM E N G I N E E R I N G 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349-4500 Fax: (540) 349-0321 dhines a)bohl ereng. com CONTACT: DANIEL R. HINES, P.E. SHEET INDEX SHEET TITLE SHEET NUMBER COVER SHEET 1 SITE PLAN 6C APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNEPUZ ONING ENGINEER INSPECTIONS AR -13 DEPARTMENT OF FIRE RESCUE A1,13EMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION HEALTH DEPARTMENT WE THE UNDERSIGNED DEVELOPER(S) UNDERSTAND THAT APPROVAL OF THIS PLAN BY THE COUNTY OF ALBEMARLE DOES NOT NECESSARILY INDICATE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) APPROVAL OF THE PLAN. APPROVAL OF THE PLAN BY THE COUNTY DOES NOT IN ANYWAY RELIEVE ME OF MY RESPONSIBILITY IN OBTAINING FINAL VDOT APPROVAL PRIOR TO THE ISSUANCE OF BUILDING PERMITS AND/OR CERTIFICATES OF OCCUPANCY. REVISIONS REV DATE COMMENT J LL O 1/29/16 AMENDMENT II DRH 6 J d? LETTER OF REVISION DRH 7 5/25/16 AMENDMENT III DRH 8 6/30/16 AMENDMENT III FOR APPROVAL DRH 9 8/5/16 AMENDMENT IV DRH 10 9/20/16 COMMENT REV. AMENDMENT IV DRH 11 2/3/17 AMENDMENT V DRH 12 O Z FOR APPROVAL DRH .-1 b� FOR APPROVAL w ow p Ix F" 6 gga W- OOi-W>>®®3 mc - n>OLLSLL R F2 E W U - d ai �a W O <1 � o d Sze I W� 12 pz02-> m } ZZO O I� J Hw d 8 12 W� O mo= tAd0UU mw S � m� a cc a j/�� rf � I2 iB W PA Z � u o r� -� f - Q PH o Qm z REVISIONS REV DATE COMMENT BY 5 1/29/16 AMENDMENT II DRH 6 2/12/16 LETTER OF REVISION DRH 7 5/25/16 AMENDMENT III DRH 8 6/30/16 AMENDMENT III FOR APPROVAL DRH 9 8/5/16 AMENDMENT IV DRH 10 9/20/16 COMMENT REV. AMENDMENT IV DRH 11 2/3/17 AMENDMENT V DRH 12 3/15/17 FOR APPROVAL DRH 13 4/6/18 FOR APPROVAL EEN THE FOLLOWING STATES REQUIRE NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. (IN VIRGINIA, MARYLAND, AND DELAWARE 811) (WV 1-800-245-4848) (PA 1-800-242-1776) (VA 1-800-552-7001) (MID 1-800-257-7777)(DE 1-800-282-8555) APPROVED FOR CONSTRUCTION PROJECT No.: V122001 DRAWN BY: JLP/CBC CHECKED BY: DRH DATE: 02/20/15 SCALE: AS NOTED CAD I.D.: SD8 PROJECT MINOR SITE PLAN AMENDMENT VI FOR STH H STRE `' T TATION OVER) ) PHASE I1 LOCATION OF SITE NORTH OF 1-64 BETWEEN 5TH STREET AND AVON STREET EXTENDED SCOTTSVILLE MAGISTERIAL ALBEMARLE COUNTY, VA BOHLER ENGINEERING 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349-4500 Fax: (540) 349-0321 14. www.BohlerEngineering.com n V RIMN YAL-MR .p Lic. No. 0402056625 4/6/18 1►4 A SHEET TITLE: COVER SHEET SHEET NUMBER: I GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT NORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE T THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE 4CCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND II FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. ZONING AND SITE TABULATIONS PARCEL: 076M1-00-00-002BO, 076M1-00-00-004AO, 076M1-00-00-002AO & 07700-00-00-011 EO ZONING AND OVERLAY DISTRICTS: PLANNED DEVELOPMENT- SHOPPING CENTERS (PD -SC) 945,579 SF ENTRANCE CORRIDOR (EC) & AIRPORT IMPACT AREA (AIA) ASSOCIATED PLANS: ZONING MAP AMENDMENT - ZMA200900001 (APPROVED 9/12/12) DRH PARKING STRUCTURE SPECIAL USE PERMIT - SP01000003 (APPROVED 9/12/12) 332,896 SF CRITICAL SLOPES SPECIAL EXCEPTION (APPROVED 9/12/12) PARK AND RIDE AREA PROFFER STATEMENT DATED 09-04-12 (APPROVED 9/12/12) 0.33 AC FLOOD PLAIN SPECIAL USE PERMIT- SP201200029 (APPROVED 3/13/13) 633,198 SF FINAL SITE PLAN - WEGMANS - SDP201300065 (APPROVED 10/30/14) MAGISTERIAL DISTRICT: SCOTTSVILLE DISTRICT PROPOSED USE: SHOPPING CENTER TOTAL SITE AREA: 86.90 ACRES LANDFILL PARCEL AREA: 21.17 ACRES RIGHT-OF-WAY DEDICATION: 211,655 SF = 4.86 ACRES (APPROXIMATE) RIGHT-OF-WAY RESERVATION: 121,241 SF - 2.78 ACRES (APPROXIMATE) (BOTH RIGHT-OF-WAY AREAS ABOVE ARE PROPOSED WITH BENT CREEK PARKWAY ROAD IMPROVEMENT PLAN) PROPOSED IMPERVIOUS COVER: DRH OVERALL DEVELOPMENT AREA: 37.90 AC (EXCLUDING ROW) LANDSCAPE PLAN REQUIRED: YES TOTAL BUILDING FLOOR AREA: �J F1 WEGMANS (PHASE 1): 140,000 SF NORTHERN BELL (PHASE 11): 329,773 SF THE YARD 160 SF OVERALL DEVELOPMENT: 469,933 SF PARKING SUMMARY OVERALL REQUIRED (4.5SPACES/1000SF): 2122 SPACES WEGMANS PROVIDED: 801 SPACES PHASE II PROVIDED: 1399 SPACES OVERALL TOTAL: 2200 SPACES OPEN SPACE CALCULATIONS OVERALL SITE 3,782,315 SF 86.83 AC REQUIRED OPEN SPACE (25%) 945,579 SF 21.71 AC NON -OPEN SPACE AREAS AMENDMENT it DRH BENT CREEK PARKWAY (ROW) 332,896 SF 7.64 AC PARK AND RIDE AREA 14,571 SF 0.33 AC WEGMANS SITE PLAN 633,198 SF 14.54 AC PHASE it PLAN 1,017,561 SF 23.36 AC TOTAL 1,998,226 SF 45.87 AC OPEN SPACE REMAINING 2,801,650 SF 40.96 AC (47%) 1. ALL PATIO AREA TO BE 4" THICK 3,000 PSI CONCRETE ON 4" OF GRAVEL 2. SAWCUT JOINTS TO BE 4' ON CENTER WITH EXPANSION JOINTS INSTALLED EVERY 8', 3. PAVERS AND TREE GRATES HAVE BEEN DELETED FROM THE PROJECT. 4. NO FOOTINGS ARE TO BE INSTALLED IN WATERLINE EASEMENTS WITHIN HARDSCAPE AREA. 5. BREAKER PANEL ALLOWS FOR TOTAL DISCONNECTION OF ALL THE YARD'S ELECTRICAL CIRCUITS WITH ONE BREAKER. PANEL WILL BE LABELED AND IDENTIFIED FOR SERVICE AUTHORITY'S USE DURING EMERGENCY REPAIRS OR MAINTENANCE. I��lllllu ,� i REVISIONS REV DATE COMMENT BY 5 1/29/16 AMENDMENT it DRH 6 J LL S DRH 7 5/25/16 AMENDMENT III JQ Sz 6/30/16 T �l v DRH 9 8/5/16 a5 GS DRH 10 9/20/16 COMMENT REV. AMENDMENT IV DRH 11 2/3/17 AMENDMENT V DRH L12 >Opaa �� DRH �J F1 4/6/18 FOR APPROVAL UI...�W J �O�Zw g IS m W J mF(n�LLLL 3� (�] LLLI ♦����♦ o;'Y P4 O } a 9. � � :05 g w u_ a,>-OI..=Q o00 OZYZ>co 'eSLuQ� � m$ °OWOJ= (AQ0�UU o 0 cn N 44 zH w41 cr) Z 6a U Z PH 0 g6 o W REVISIONS REV DATE COMMENT BY 5 1/29/16 AMENDMENT it DRH 6 2/12/16 LETTER OF REVISION DRH 7 5/25/16 AMENDMENT III DRH 8 6/30/16 AMENDMENT III FOR APPROVAL DRH 9 8/5/16 AMENDMENT IV DRH 10 9/20/16 COMMENT REV. AMENDMENT IV DRH 11 2/3/17 AMENDMENT V DRH L12 3/15/17 FOR APPROVAL DRH 13 4/6/18 FOR APPROVAL EEN THE FOLLOWING STATES REQUIRE NOTIFICATION BY EXCAVATORS, DESIGNERS, OIR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE. (IN VIRGINIA, MARYLAND, AND DELAWARE 811) (WV 1-800-245-48485) (PA 1-800-242-1776) (VA 1-800-552-7001) (MID 1-800-257-7777)(DE 1-800-282-8555) APPROVED FOR CONSTRUCTION PROJECT No.: V122001 DRAWN BY: JLP/CBC CHECKED BY: DRH DATE: 02/20/15 SCALE: V1=10' CAD I.D.: SP8 PROJECT: SITE PLAN AME DMENT VI FOR 5TH STIREET CHASE 11 LOCATION OF SII'E NORTH OF 1-64 BETWEEN 5TH STREET AND AVON STREET EXTENDED SCOTTSVILLE MAGISTERIAL ALBEMARLE COUNTY, VA 28 BLACKWELL PARK LANE, SUITE 201 WARRENTON, VIRGINIA 20186 Phone: (540) 349-4500 Fax: (540) 349-0321 www.BohlerEngineering.com . Ok RYAN YAL-MR - P Lic. No. 0402056625 4/6/18 040M `G�� f SHEET ET TITLE SITE SPLA SHEET NUMBER: 6C