ISPI Cover Sheet
ISP2 Notes, Abbreviations, & Legend
ISP3 Existing Conditions Plan
ISP4 Layout Plan
TSPS Grading Plan
ISP6 Sanitary Sewer Profiles
ISP7 Preliminary SWIM Computations and Narrative
ISP8 Sight Distance Ron &Profile
ISP9 South Pantops Dril%,.c4 Typical Section & Warrant Analysis
ISPIO Critical Slope Exhibit
CURRENT DEVELOPMENT PLANNER
ZIA0119 91 avi1191:1L,71 1:1 ON 11111:3 ilk Lei 1011:34
ALBEMARLE COUNTY SERVICE AUTHORITY
FIRE OFFICIAL
BUILDING OFFICIAL
VIRGINIA DEPARTMENT OF TRANSPC RATION
Submittal -type
Reviewed and Approved by the
��m i�r�ixy eve' pment Department
ment
Date - __- _ t
Frl - - r � _ eves
Tn 0
F. 8
Lie
X. TVo. 33()228
G 03-05-2018
0
DOM.PROJECT ,
0
0.'
`r3 e .
I S P
I
.r
F 0 tii tt
i
Y
a
SITEk
i
4
"Y
S i ,yd i.s Y.7
l d
i
i
i
it
s.
por:;X::�::
�
r
Boom@
ISPI Cover Sheet
ISP2 Notes, Abbreviations, & Legend
ISP3 Existing Conditions Plan
ISP4 Layout Plan
TSPS Grading Plan
ISP6 Sanitary Sewer Profiles
ISP7 Preliminary SWIM Computations and Narrative
ISP8 Sight Distance Ron &Profile
ISP9 South Pantops Dril%,.c4 Typical Section & Warrant Analysis
ISPIO Critical Slope Exhibit
CURRENT DEVELOPMENT PLANNER
ZIA0119 91 avi1191:1L,71 1:1 ON 11111:3 ilk Lei 1011:34
ALBEMARLE COUNTY SERVICE AUTHORITY
FIRE OFFICIAL
BUILDING OFFICIAL
VIRGINIA DEPARTMENT OF TRANSPC RATION
Submittal -type
Reviewed and Approved by the
��m i�r�ixy eve' pment Department
ment
Date - __- _ t
Frl - - r � _ eves
Tn 0
F. 8
Lie
X. TVo. 33()228
G 03-05-2018
0
i
DOM.PROJECT ,
0
INDEX TITLE:
I S P
I
.r
i
Y
a
i
a
i
i
i
�
r
Boom@
i
DOM.PROJECT ,
0
INDEX TITLE:
I S P
I
.r
i
DATE: 03/05/2018
DOM.PROJECT ,
0
INDEX TITLE:
I S P
I
DATE: 03/05/2018
LEGEND
EMST PROP DESCRIPTION
PROPERTY LINE
ADJACENT PROPERTY LINE
VACATED PROPERTY LINE
_ -- -- EASEMENT
r} BUILDING SETBACK
-- BUILD TO LINE
® ZONING UNE
LIMIT OF DISTURBANCE
FLOODPLAIN LIMIT
BUFFER ZONE
--- -- - RMA - RESOURCE MANAGEMENT AREA
PPA
- -- - ---- RPA - RESOURCE PROTECTION AREA
•1BEBUILDING ENTRANCE
LD LOADING DOCK
s BOLLARD
DUMPSTER PAD
- SIGN
CONTOUR
INDEX CONTOUR
N...
1. THE CONTRACTOR IS REQUIRED TO OBTAIN ANY/ALL PERMITS REQUIRED FOR CONSTRUCTION OF THESE PLANS.
2. ANY TIME WORK IS PERFORMED OFF-SITE OR 1MTHIN AN EXISTING EASEMENT, THE CONTRACTOR IS TO NOTIFY THE HOLDER OF SAID
EASEMENT AS TO THE NATURE OF PROPOSED WORK AND TO FOLLOW ANY GUIDLELINES OR STANDARDS WHICH AIRE ASSOCIATED WITH
OR REFERENCED IN THE RECORDED EASEMENT.
3. THE CONTRACTOR IS TO CHECK THAT ALL EASEMENTS, LETTERS OF PERMISSION, ETC, ARE RECORDED/OBTAINED (PRIOR TO THE START
OF ANY CONSTRUCTION.
4. CONTRACTOR TO VERIFIY ALL SITE PLANS AND PROFILES AND DETAILS FOR CONSISTENCY AND IF CONFLICTS DO M, CONTACT
ENGINEER FOR CLARIFICATION AND/OR DIRECTION. INTERPRETATION DETERMINED BY CONTRACTOR SHALL BE DONE: AT HIS/HER OWN
RISK.
5. THE CONTRACTOR IS TO VERIFY THAT THE RELOCATION OF ALL EXiSITiNG UTILITIES IN CONFLICT WITH PROPOSED (WORK HAS BEEN
COMPLETED INCLUDING U11UTY POLES.
6. CONTRACTOR SHALL COMPLY WITH FENCING AND TREE PRESERVA11ON SIGNAGE REQUIRED BY ALBEMARLE COUNTW CODE.
7. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND DATA FILES TiHAT ARE OBTAINED
FROM THE DESIGNERS, BUT SHALL VERIFY LOCATION OF PROJECT FEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE PLANS
AND SPECIFICATIONS THAT ARE SUPPLIED AS PART OF THE CONTRACT DOCUMENTS.
8. CONTRACTOR SHALL COMPLY WITH ALL WETLAND PERMIT REQUIREMENTS, IF A PERMIT EXISTS.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, (UNLESS OTHERWISE NOTED ON PLANS) INCLUDING, BUT NOT LIMITED TO,
ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS do POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH
GOVERNING AUTHORITIES REQUIREMENTS AND PROJECT SITEWORK SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST
SHALL BE INCLUDED IN BASE BID.
10. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OF SITE AREAS, AND
SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, iF ANY, AT NO COST TO OWNER.
ARAN ABANDON(ED)
ADJ ADJUST
AHD AHEAD
APRX APPROXIMATE
BC BACK OF CURB
BFE BASEMENT FLOOR ELEVATION
BIT BITUMINOUS
BK BACK
BM BENCHMARK
BS BOTTOM OF SLOPE
CB CATCH BASIN
CG12 ACCESSIBLE CURB RAMP
q CENTER LINE
CL CHAIN LINK
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CY CUBIC YARDS
C/C CENTER TO CENTER
C&G CURB AND GUTTER
DIA DIAMETER
EL ELEVATION
ELEV ELEVATION
ES END SECTION
EW END WALL
EX EXISTING
EXIST EXISTING
FDN FOUNDATION
FIFE FINISHED FLOOR ELEVATION
GM GRADE TO DRAIN
IFIRON FOUND
IS IRON SET
LA LANDSCAPE AREA
LOD LIMIT OF DISTURBANCE
LF LINEAR FEET
LT LEFT
UTILITY
ARV AIR RELEASE VALVE
BOA BLOW OFF ASSEMBLY
CO CLEANOUT
CTV CABLE TELEVISION
DI DROP INLET
DIP DUCTILE IRON PIPE
ELEC ELECTRIC
FH FIRE HYDRANT
FM FORCE MAIN
F&C FRAME AND COVER
F&G FRAME AND GRATE
GT GREASE TRAP
GV GATE VALVE
HDPE HIGH DENSITY POLYETHYLENE
INV INVERT
A
PARKING COUNT
ic y 3
®
CROSSWALK
12 CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS.Alternatives
x
12° FL
NEW ASPHALT
X
ACCESSIBLE CURB RAMP
NIC NOT IN CONTRACT
tiro
HANDICAP PARKING
EC -2 BLANKET MATTING
X
VAN -ACCESSIBLE HANDICAP PARKING
N...
1. THE CONTRACTOR IS REQUIRED TO OBTAIN ANY/ALL PERMITS REQUIRED FOR CONSTRUCTION OF THESE PLANS.
2. ANY TIME WORK IS PERFORMED OFF-SITE OR 1MTHIN AN EXISTING EASEMENT, THE CONTRACTOR IS TO NOTIFY THE HOLDER OF SAID
EASEMENT AS TO THE NATURE OF PROPOSED WORK AND TO FOLLOW ANY GUIDLELINES OR STANDARDS WHICH AIRE ASSOCIATED WITH
OR REFERENCED IN THE RECORDED EASEMENT.
3. THE CONTRACTOR IS TO CHECK THAT ALL EASEMENTS, LETTERS OF PERMISSION, ETC, ARE RECORDED/OBTAINED (PRIOR TO THE START
OF ANY CONSTRUCTION.
4. CONTRACTOR TO VERIFIY ALL SITE PLANS AND PROFILES AND DETAILS FOR CONSISTENCY AND IF CONFLICTS DO M, CONTACT
ENGINEER FOR CLARIFICATION AND/OR DIRECTION. INTERPRETATION DETERMINED BY CONTRACTOR SHALL BE DONE: AT HIS/HER OWN
RISK.
5. THE CONTRACTOR IS TO VERIFY THAT THE RELOCATION OF ALL EXiSITiNG UTILITIES IN CONFLICT WITH PROPOSED (WORK HAS BEEN
COMPLETED INCLUDING U11UTY POLES.
6. CONTRACTOR SHALL COMPLY WITH FENCING AND TREE PRESERVA11ON SIGNAGE REQUIRED BY ALBEMARLE COUNTW CODE.
7. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND DATA FILES TiHAT ARE OBTAINED
FROM THE DESIGNERS, BUT SHALL VERIFY LOCATION OF PROJECT FEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE PLANS
AND SPECIFICATIONS THAT ARE SUPPLIED AS PART OF THE CONTRACT DOCUMENTS.
8. CONTRACTOR SHALL COMPLY WITH ALL WETLAND PERMIT REQUIREMENTS, IF A PERMIT EXISTS.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, (UNLESS OTHERWISE NOTED ON PLANS) INCLUDING, BUT NOT LIMITED TO,
ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS do POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH
GOVERNING AUTHORITIES REQUIREMENTS AND PROJECT SITEWORK SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST
SHALL BE INCLUDED IN BASE BID.
10. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OF SITE AREAS, AND
SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, iF ANY, AT NO COST TO OWNER.
ARAN ABANDON(ED)
ADJ ADJUST
AHD AHEAD
APRX APPROXIMATE
BC BACK OF CURB
BFE BASEMENT FLOOR ELEVATION
BIT BITUMINOUS
BK BACK
BM BENCHMARK
BS BOTTOM OF SLOPE
CB CATCH BASIN
CG12 ACCESSIBLE CURB RAMP
q CENTER LINE
CL CHAIN LINK
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CY CUBIC YARDS
C/C CENTER TO CENTER
C&G CURB AND GUTTER
DIA DIAMETER
EL ELEVATION
ELEV ELEVATION
ES END SECTION
EW END WALL
EX EXISTING
EXIST EXISTING
FDN FOUNDATION
FIFE FINISHED FLOOR ELEVATION
GM GRADE TO DRAIN
IFIRON FOUND
IS IRON SET
LA LANDSCAPE AREA
LOD LIMIT OF DISTURBANCE
LF LINEAR FEET
LT LEFT
UTILITY
ARV AIR RELEASE VALVE
BOA BLOW OFF ASSEMBLY
CO CLEANOUT
CTV CABLE TELEVISION
DI DROP INLET
DIP DUCTILE IRON PIPE
ELEC ELECTRIC
FH FIRE HYDRANT
FM FORCE MAIN
F&C FRAME AND COVER
F&G FRAME AND GRATE
GT GREASE TRAP
GV GATE VALVE
HDPE HIGH DENSITY POLYETHYLENE
INV INVERT
CONCRETE PAVEMENT / SIDEWALK
MAX MAXIMUM
Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May
through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf.
X
RIPRAP
12 CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS.Alternatives
x
12° FL
NEW ASPHALT
X
GRASS
NIC NOT IN CONTRACT
tiro
12°
EC -2 BLANKET MATTING
X
y ✓.
OC ON (ENTER
X
12° Bw
construction.
OH OVERHEAD
EC -3 TYPE A
GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS:
5. The maximum allowable slope is 2:1 (horizontal: vertical). Where reasonably obtainable,
EC -3 TYPE B
lesser slopes of 3:1 or better are to be achieved.
WETLAND
CONTRACTOR'S COORDINATION RESPONSIBILITIES
N...
1. THE CONTRACTOR IS REQUIRED TO OBTAIN ANY/ALL PERMITS REQUIRED FOR CONSTRUCTION OF THESE PLANS.
2. ANY TIME WORK IS PERFORMED OFF-SITE OR 1MTHIN AN EXISTING EASEMENT, THE CONTRACTOR IS TO NOTIFY THE HOLDER OF SAID
EASEMENT AS TO THE NATURE OF PROPOSED WORK AND TO FOLLOW ANY GUIDLELINES OR STANDARDS WHICH AIRE ASSOCIATED WITH
OR REFERENCED IN THE RECORDED EASEMENT.
3. THE CONTRACTOR IS TO CHECK THAT ALL EASEMENTS, LETTERS OF PERMISSION, ETC, ARE RECORDED/OBTAINED (PRIOR TO THE START
OF ANY CONSTRUCTION.
4. CONTRACTOR TO VERIFIY ALL SITE PLANS AND PROFILES AND DETAILS FOR CONSISTENCY AND IF CONFLICTS DO M, CONTACT
ENGINEER FOR CLARIFICATION AND/OR DIRECTION. INTERPRETATION DETERMINED BY CONTRACTOR SHALL BE DONE: AT HIS/HER OWN
RISK.
5. THE CONTRACTOR IS TO VERIFY THAT THE RELOCATION OF ALL EXiSITiNG UTILITIES IN CONFLICT WITH PROPOSED (WORK HAS BEEN
COMPLETED INCLUDING U11UTY POLES.
6. CONTRACTOR SHALL COMPLY WITH FENCING AND TREE PRESERVA11ON SIGNAGE REQUIRED BY ALBEMARLE COUNTW CODE.
7. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND DATA FILES TiHAT ARE OBTAINED
FROM THE DESIGNERS, BUT SHALL VERIFY LOCATION OF PROJECT FEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE PLANS
AND SPECIFICATIONS THAT ARE SUPPLIED AS PART OF THE CONTRACT DOCUMENTS.
8. CONTRACTOR SHALL COMPLY WITH ALL WETLAND PERMIT REQUIREMENTS, IF A PERMIT EXISTS.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, (UNLESS OTHERWISE NOTED ON PLANS) INCLUDING, BUT NOT LIMITED TO,
ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS do POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH
GOVERNING AUTHORITIES REQUIREMENTS AND PROJECT SITEWORK SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST
SHALL BE INCLUDED IN BASE BID.
10. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OF SITE AREAS, AND
SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, iF ANY, AT NO COST TO OWNER.
ARAN ABANDON(ED)
ADJ ADJUST
AHD AHEAD
APRX APPROXIMATE
BC BACK OF CURB
BFE BASEMENT FLOOR ELEVATION
BIT BITUMINOUS
BK BACK
BM BENCHMARK
BS BOTTOM OF SLOPE
CB CATCH BASIN
CG12 ACCESSIBLE CURB RAMP
q CENTER LINE
CL CHAIN LINK
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CY CUBIC YARDS
C/C CENTER TO CENTER
C&G CURB AND GUTTER
DIA DIAMETER
EL ELEVATION
ELEV ELEVATION
ES END SECTION
EW END WALL
EX EXISTING
EXIST EXISTING
FDN FOUNDATION
FIFE FINISHED FLOOR ELEVATION
GM GRADE TO DRAIN
IFIRON FOUND
IS IRON SET
LA LANDSCAPE AREA
LOD LIMIT OF DISTURBANCE
LF LINEAR FEET
LT LEFT
UTILITY
ARV AIR RELEASE VALVE
BOA BLOW OFF ASSEMBLY
CO CLEANOUT
CTV CABLE TELEVISION
DI DROP INLET
DIP DUCTILE IRON PIPE
ELEC ELECTRIC
FH FIRE HYDRANT
FM FORCE MAIN
F&C FRAME AND COVER
F&G FRAME AND GRATE
GT GREASE TRAP
GV GATE VALVE
HDPE HIGH DENSITY POLYETHYLENE
INV INVERT
GENERAL CONSTRUCTION NOTES:
MAX MAXIMUM
Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May
through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf.
X
12° BC
12 CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS.Alternatives
x
12° FL
Transportation (VDOT). This plan as drawn may not accurately reflect the requirements of
X
12° EOP
NIC NOT IN CONTRACT
x
12°
of VDOT unless otherwise noted.
X
12°TTN
OC ON (ENTER
X
12° Bw
construction.
OH OVERHEAD
4. All slopes and disturbed areas are to be fertilized, seeded and mulched.
GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS:
5. The maximum allowable slope is 2:1 (horizontal: vertical). Where reasonably obtainable,
PE POLYETHYLENE
N...
1. THE CONTRACTOR IS REQUIRED TO OBTAIN ANY/ALL PERMITS REQUIRED FOR CONSTRUCTION OF THESE PLANS.
2. ANY TIME WORK IS PERFORMED OFF-SITE OR 1MTHIN AN EXISTING EASEMENT, THE CONTRACTOR IS TO NOTIFY THE HOLDER OF SAID
EASEMENT AS TO THE NATURE OF PROPOSED WORK AND TO FOLLOW ANY GUIDLELINES OR STANDARDS WHICH AIRE ASSOCIATED WITH
OR REFERENCED IN THE RECORDED EASEMENT.
3. THE CONTRACTOR IS TO CHECK THAT ALL EASEMENTS, LETTERS OF PERMISSION, ETC, ARE RECORDED/OBTAINED (PRIOR TO THE START
OF ANY CONSTRUCTION.
4. CONTRACTOR TO VERIFIY ALL SITE PLANS AND PROFILES AND DETAILS FOR CONSISTENCY AND IF CONFLICTS DO M, CONTACT
ENGINEER FOR CLARIFICATION AND/OR DIRECTION. INTERPRETATION DETERMINED BY CONTRACTOR SHALL BE DONE: AT HIS/HER OWN
RISK.
5. THE CONTRACTOR IS TO VERIFY THAT THE RELOCATION OF ALL EXiSITiNG UTILITIES IN CONFLICT WITH PROPOSED (WORK HAS BEEN
COMPLETED INCLUDING U11UTY POLES.
6. CONTRACTOR SHALL COMPLY WITH FENCING AND TREE PRESERVA11ON SIGNAGE REQUIRED BY ALBEMARLE COUNTW CODE.
7. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND DATA FILES TiHAT ARE OBTAINED
FROM THE DESIGNERS, BUT SHALL VERIFY LOCATION OF PROJECT FEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE PLANS
AND SPECIFICATIONS THAT ARE SUPPLIED AS PART OF THE CONTRACT DOCUMENTS.
8. CONTRACTOR SHALL COMPLY WITH ALL WETLAND PERMIT REQUIREMENTS, IF A PERMIT EXISTS.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, (UNLESS OTHERWISE NOTED ON PLANS) INCLUDING, BUT NOT LIMITED TO,
ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS do POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH
GOVERNING AUTHORITIES REQUIREMENTS AND PROJECT SITEWORK SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST
SHALL BE INCLUDED IN BASE BID.
10. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OF SITE AREAS, AND
SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, iF ANY, AT NO COST TO OWNER.
ARAN ABANDON(ED)
ADJ ADJUST
AHD AHEAD
APRX APPROXIMATE
BC BACK OF CURB
BFE BASEMENT FLOOR ELEVATION
BIT BITUMINOUS
BK BACK
BM BENCHMARK
BS BOTTOM OF SLOPE
CB CATCH BASIN
CG12 ACCESSIBLE CURB RAMP
q CENTER LINE
CL CHAIN LINK
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CY CUBIC YARDS
C/C CENTER TO CENTER
C&G CURB AND GUTTER
DIA DIAMETER
EL ELEVATION
ELEV ELEVATION
ES END SECTION
EW END WALL
EX EXISTING
EXIST EXISTING
FDN FOUNDATION
FIFE FINISHED FLOOR ELEVATION
GM GRADE TO DRAIN
IFIRON FOUND
IS IRON SET
LA LANDSCAPE AREA
LOD LIMIT OF DISTURBANCE
LF LINEAR FEET
LT LEFT
UTILITY
ARV AIR RELEASE VALVE
BOA BLOW OFF ASSEMBLY
CO CLEANOUT
CTV CABLE TELEVISION
DI DROP INLET
DIP DUCTILE IRON PIPE
ELEC ELECTRIC
FH FIRE HYDRANT
FM FORCE MAIN
F&C FRAME AND COVER
F&G FRAME AND GRATE
GT GREASE TRAP
GV GATE VALVE
HDPE HIGH DENSITY POLYETHYLENE
INV INVERT
MH MANHOLE
PVC POLYVINYL CHLORIDE GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS:
RIM RIM ELEVATION 1. The plan approving authority must be notified one week prior to the pre -construction
conference, one week prior to the commencement of land disturbing activity, and one week
SAN SANITARY prior to the final inspection.
2. All erosion and sediment control measures will be constructed and maintained according to
SCC STORMWATER CONVEYANCE CHANNEL minimum standards and specifications of the Virginia Erosion and Sediment Control
SD STORM Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control
Regulations.
STIR DRAINAGE STRUCTURE 3• All erosion and sediment control measures are to be placed prior to or as the first step in
clearing.
TSV TAPPING SLEEVE & VALVE 4. A copy of the approved erosion and sediment control plan shall be maintained on the site at
all times.
UP UTILITY POLE 5. Prior to commencing land disturbing activities in areas other than indicated on these plans
(including, but not limited to, off-site borrow or waste areas), the contractor shall submit a
WL WATER LINE supplementary erosion control plan to the owner for review and approval by the plan
approving authority.
WM WATER METER 6. The contractor is responsible for installation of any additional erosion control measures
WV WAiERt VALVE necessary to prevent erosion and sedimentation as determined by the plan approving
authority.
60V 6' VALLVE 7. All disturbed areas are to drain to approved sediment control measures at all times during
land disturbing activities and during site development until final stabilization is achieved.
8. During dewatering operations, water will be pumped into an approved filtering device.
9. The contractor shall inspect all erosion control measures periodically and after each runoff producing
rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of
the erosion control devices shall be made immediately.
10. All fill material to be taken from an approved, designated borrow area.
11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert
materials only, free of roots, stumps, wood, rubbish, and other debris.
12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning
Ordinance section 5.1.28.
13. All inert materials shall be transported in compliance with section 13-301 of the Code of
Albemarle.
14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to
the hours of 7:00am to 9:00pm.
15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral
support, or order to minimize any hazard to persons, physical damage to adjacent land and
improvements, and damage to any public street because of slides, sinking, or collapse.
16. The developer shall reserve the right to install, maintain, remove or convert to permanent
stormwater management facilities where applicable all erosion control measures required
by this plan regardless of the sale of any lot, unit, building or other portion of the property.
17 Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75
11. THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS WITHIN THE VIRGINIA STORMWATER MANAGEMENT PROGRAM
(VSMP), GENERAL CONSTRUCTION PERMIT (GCP) PROGRAM AS ADMINISTERED BY THE VIRGINIA DEPARTMENT OF CONSERVATION AND)
GENERAL CONSTRUCTION NOTES:
MAX MAXIMUM
Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May
through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf.
MIN MINIMUM
1. Prior to any construction within any existing public right-of-way, including connection to
12 CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS.Alternatives
any existing road, a permit shall be obtained from the Virginia Department of
MON MONUMENT CONCRETE
Transportation (VDOT). This plan as drawn may not accurately reflect the requirements of
NTH OSHA STANDARDS AND LOCAL REQUIREMENTS.
the permit. Were any discrepancies occur the requirements of the permit shall govern.
NIC NOT IN CONTRACT
2. All materials and construction methods shall conform to current specifications and
ORDINANCES AND STATUTES.
of VDOT unless otherwise noted.
NTS NOT TO SCALEstandards
3. Erosion and siltation control measures shall be provided in accordance with the approved
OC ON (ENTER
erosion control plan and shall be installed prior to any clearing, grading or other
UTILITY REPRESENTATIVES.
construction.
OH OVERHEAD
4. All slopes and disturbed areas are to be fertilized, seeded and mulched.
GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS:
5. The maximum allowable slope is 2:1 (horizontal: vertical). Where reasonably obtainable,
PE POLYETHYLENE
lesser slopes of 3:1 or better are to be achieved.
moisture content. All fill material to be approved by a geotechnical engineer. Aimmediately.
6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the
PERF PERFORATED
County Engineer, or designee, it is deemed necessary in order to stabilize a drainage
2. Pipe and riser joints are to be watertight within stormwater management facilities.
channel.
PROP PROPOSED LOCATION
7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic
PRVD PROVIDED
Control Devices.
8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe -Class III.
PWW PAVED WATER WAY
9• All excavation for underground pipe installation must comply with OSHA Standards for
the Construction Industry (29 CFR Part 1926).
RCP REINFORCED CONCRETE PIPE
PRE -DEVELOPMENT % POST -DEVELOPMENT
BLIP0.00
DING S )
GENERAL CONSTRUCTION NOTES FOR STREETS:
REM REMOVE
. _.
0.001 AC 0.00% 1.57 AG
READ REQUIRED
1. Construction inspection of all proposed roads within the development will be made by the
TOTAL -
County. The contractor must notify the Department of Community Development (296 -
RET RETAIN
5832) 48 hours in advance of the start of construction.
MINIMUM REQUIRED AREA
2. Upon completion of fine grading and preparation of the roadbed subgrade, the contractor
RT RIGHT
shall have CBR tests performed on the subgrade soil. Three (3) copies of the test results
shall be submitted to the County. If a subgrade soil CBR of 10 or greater is not obtainable,
R/W RIGHTOF WAY
a revised pavement design shall be made by the design engineer and submitted with the test
results for approval.
R&D REMOiVE AND DISPOSE
3. Surface drainage and pipe discharge must be retained within the public right-of-way or
R&R REMOVE do RESET
within easements prior to acceptance by the County. All drainage outfall easements are to
REQUIRED
be extended to a boundary line or a natural watercourse.
SD SIGHT DISTANCE
4. Guardrail locations are approximate. Exact length, location and appropriate end treatments
will be field verified at the time of construction. Additional guardrail may be required at
SQ SQUARE
locations not shown when, in the opinion of the County Engineer, or designee, it is deemed
necessary. When guardrail is required, it shall be installed four (4) feet offset from the edge
STA STATION
of pavement to the face of guardrail, and roadway shoulder widths shall be increased to
seven (7) feet.
SW SIDEWALK
5. Where urban cross sections ore installed, all residential driveway entrances shall conform
SWEL SOLID WHITE EDGE LINE
to VDOT CG -9(A, B or C).
6. Where rural cross sections are installed, all residential driveway entrances shall conform to
SWILL SOLID WHITE LANE LINE
VDOT standard PE -1.
7. Compliance with the minimum pavement width, shoulder width and ditch sections, as
TBA TO BE ABANDONED
shown on the typical pavement section detail, shall be strictly adhered to.
8. Road plan approval for subdivisions is subject to final subdivision plat validation. Should
TBR TO BE REMOVED
the final plat for this project expire prior to signing and recordation, then approval of these
REQUIREMENT:
plans shall be null and void.
TC TOP OF CURB
9. All signs or other regulatory devices shall conform with the Virginia Manual for Uniform
TS TOP OF SLOPE
Traffic Control Devices and the Albemarle County Road Naming and Property Numbering
Ordinance and Manual.
TYP TYPICAL
10. Traffic control or other regulatory signs or barricades shall be installed by the developer
ADA REQUIREMENT.
when, in the opinion of the County Engineer, or designee, they are deemed necessary in
UG UNDERGROUND
order to provide safe and convenient access.
TOTAL ADA REQUIREMENT:
11. The speed limits to be posted on speed limit signs are 5 mph below the design speed, or as
VESCHVA. E&S CONTROL HANDBOOK
determined by VDOT for public roads.
12. VDOT standard CD -1 or CD -2 cross -drains under to be installed under the subbase
YDS YARDS
material at all cut and fill transitions and grade sag points as shown on the road profiles.
APARTMENT UNITS
13. A video camera inspection is required for all storm sewers and culverts that are deemed
TOTAL ADT
inaccessible to VDOT or County inspections. The video inspection shall be conducted in
LANDSCAPE NOTE
accordance with VDOT's video camera inspection procedure and with a VDOT or County
inspector present.
MH MANHOLE
PVC POLYVINYL CHLORIDE GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS:
RIM RIM ELEVATION 1. The plan approving authority must be notified one week prior to the pre -construction
conference, one week prior to the commencement of land disturbing activity, and one week
SAN SANITARY prior to the final inspection.
2. All erosion and sediment control measures will be constructed and maintained according to
SCC STORMWATER CONVEYANCE CHANNEL minimum standards and specifications of the Virginia Erosion and Sediment Control
SD STORM Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control
Regulations.
STIR DRAINAGE STRUCTURE 3• All erosion and sediment control measures are to be placed prior to or as the first step in
clearing.
TSV TAPPING SLEEVE & VALVE 4. A copy of the approved erosion and sediment control plan shall be maintained on the site at
all times.
UP UTILITY POLE 5. Prior to commencing land disturbing activities in areas other than indicated on these plans
(including, but not limited to, off-site borrow or waste areas), the contractor shall submit a
WL WATER LINE supplementary erosion control plan to the owner for review and approval by the plan
approving authority.
WM WATER METER 6. The contractor is responsible for installation of any additional erosion control measures
WV WAiERt VALVE necessary to prevent erosion and sedimentation as determined by the plan approving
authority.
60V 6' VALLVE 7. All disturbed areas are to drain to approved sediment control measures at all times during
land disturbing activities and during site development until final stabilization is achieved.
8. During dewatering operations, water will be pumped into an approved filtering device.
9. The contractor shall inspect all erosion control measures periodically and after each runoff producing
rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of
the erosion control devices shall be made immediately.
10. All fill material to be taken from an approved, designated borrow area.
11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert
materials only, free of roots, stumps, wood, rubbish, and other debris.
12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning
Ordinance section 5.1.28.
13. All inert materials shall be transported in compliance with section 13-301 of the Code of
Albemarle.
14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to
the hours of 7:00am to 9:00pm.
15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral
support, or order to minimize any hazard to persons, physical damage to adjacent land and
improvements, and damage to any public street because of slides, sinking, or collapse.
16. The developer shall reserve the right to install, maintain, remove or convert to permanent
stormwater management facilities where applicable all erosion control measures required
by this plan regardless of the sale of any lot, unit, building or other portion of the property.
17 Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75
11. THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS WITHIN THE VIRGINIA STORMWATER MANAGEMENT PROGRAM
(VSMP), GENERAL CONSTRUCTION PERMIT (GCP) PROGRAM AS ADMINISTERED BY THE VIRGINIA DEPARTMENT OF CONSERVATION AND)
`
lbs/acre, and in the months of September to February to consist a 50/50 mix of Annual
RECREATION (DCR) UNDER THE JURISDICTION OF THE EPA PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL FILE A GCP
NOTICE OF INTENT WITH THE DCR AND PREPARE A STORMWATER PREVENTION PLAN IN ACCORDANCE WITH THE VSMP REGULATiONSS,
Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May
through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf.
CHARLOTTESVILLE, VA 22906
MANAGEMENT SERVICES CORPORATION
102 S. FIRST STREET, SUITE 301
are subject to approval by the County erosion control inspector.
12 CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS.Alternatives
18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE
Agricultural grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4-6
NTH OSHA STANDARDS AND LOCAL REQUIREMENTS.
inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 nutrient
14. ONTRACTOR SHALL DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL REGUL.AiiONS,
mix. Permanent seeding shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or
Tall Fescue and 0-5% Perennial Ryegross or Kentucky Bluegrass. Straw mulch is to be
ORDINANCES AND STATUTES.
applied at 80lbs/1009f. Alternatives are subject to approval by the County erosion control
15 EXISTING UTILITiES SHALL BE TERMINATED, UNLESS OTHERWISE NOTED, IN CONFORMANCE WITH LOCAL, STATE AND INDIVIDUAL WTiLITY
inspector.
COMPANY STANDARDS SPECIFICATIONS, AND DETAILS. THE CONTRACTOR SHiLL COORDINATE UTILITY SERVICE DISCONNECTS WITH THE
19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage
UTILITY REPRESENTATIVES.
or clogging to structural measures is to be repair immediately. Silt traps are to be cleaned
.5
when 50% of the wet storage volume is filled with sediment. All seeded areas are to be
GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS:
reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes
which are collecting sediment to half their height must be cleaned and repaired
1. All dams and constructed fill to be within 95% of maximum dry density and 2% of optimum
moisture content. All fill material to be approved by a geotechnical engineer. Aimmediately.
20. All temporary erosion and sediment control measures are to be removed within 30 days of
geotechnical engineer is to be present during construction of dams.
final site stabilization, when measures are no longer needed, subject to approval by the
2. Pipe and riser joints are to be watertight within stormwater management facilities.
s
inspector,
County erosion control ins
3. For temporary sediment traps or basins which are to be converted to permanent stormwater
21. This plan shall be void the owner does not obtain a permit within 1 year of the date of
management facilities; conversion is not to take place until the site is stabilized, and
approval. (Water Protection Ordinance section 17-204G.)
permission has been obtained from the County erosion control inspector.
22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after
the date the land disturbing activity commences. (Water Protection Ordinance section 17-207B)
SITE TABULATIONS
OWNER
SOUTH PANTOPS 11 LAND TRUST
PC BOX 8147
1a
CHARLOTTESVILLE, VA 22906
MANAGEMENT SERVICES CORPORATION
102 S. FIRST STREET, SUITE 301
DEVELOPER
Cj
CHARLOTTESVILLE, VA 22902
RIVANNA ENGINEERING & SURVEYING, 01!0612005
TOPOGRAPHICAL INFORMATION BASED ON FIELD SURVEY BY
DCMINiON ENGINEERING & DESIGN, LLC JULY 2017, AND CONFIRMED
SOURCE OF BOUNDRY ,SURVEY
SOURCE OF TOPOGRAPHY
Carr'
IN THE FIELD BY THE DESIGN ENGINEER DECEMBER 2017.
A PORTION OF THiS PROPERTY IS LOCATED IN FLOOD ZONE AE AS SH(
FEDERAL EMERGENCY MANAGEMENT AGENCY. FLOOD INSURANCE Rr
FLOODPLAIN INFORMATION
(D8S
�
NUMBER: 51003CO289D, DATED: 02104/2005 NVGD 1988
is
AREA
78-20 13.31 AC
DEED BOOK 2913, PAGE 156
R15
MANAGED AND PRESERVED SLOPES OVERLAY DISTRICT
FRONT --MIN 5 FEET
FRONT -MAX 25 FEET
TAX MAPIPARCEL.
.5
ZONING INFORMATION
,_.
SETBACKS
M
SIDE _ ;.ZERO
REAR 20 FEET
65 FEET
FOR EACH STORY THAT BEGINS ABOVE 40 FEET IN HEIGHT OR FOR EA+
ABOVE THE THIRD STORY, WHICHEVER IS LESS, THE MINIMUM STEPBA
MAXIMUM BUIDLING HEIGHT
STEPBACKS
SHALL BE A MINIMUM OF 15 FEET. REFER TO ARCHITECTS PLAN FOR G
_
15 DUTAC
## OF UNITS 144 (96 2BD, 48 TBD)
GROSS DENSITY '10.82 DUTAC
MAXIMUM DENSITY
GROSS DENSITY
AND SCHEDULE
ND ti+OVER
PRE -DEVELOPMENT % POST -DEVELOPMENT
BLIP0.00
DING S )
AG ... .. 0.00% 1.32 AG
PAVED
. _.
0.001 AC 0.00% 1.57 AG
OPEN SPACE
13.76 AG 10&00% 10.87 AC
TOTAL -
13.76 AC 100.00% 13.76 AC
RECREATION REGULATION
MINIMUM REQUIRED AREA
200 SQFTIUNIT = 28,800 SQFT ;<5% GROSS SITE AREA
PROVIDED AREA
POOL AREA 3,490 SOFT
CLUBHOUSE AREA 5,334 SQFT
WORKOUT FACILITIES 1,778 SQFT
ONSITE NATURE TRAILS & WOODED AREAS 473,497 SQFT ......
NEW TOTAL 480,609 SQFT
MINIMUM FACILITIES
ONE TOT LOT SHALL BE PROVEDED FOR THE FiRST 30 UNITS AND FOR
REQUIRED
ADDITIONAL 50 UNITS SHALL CONTAIN EQUIPMENT WHICH PROVIDES At
ECUIVALENTTO-1 ONE SWING SET, ONE SLIDE, TWO CLIMBERS, ONE Elk,
TWO BENCHES.
1
1 HALF BASKETBALL COURT SHALL BE PROVIDED FOR EACH 100 UNITS
'3 TCT LOTS AND 1 HALF -BASKETBALL COURT IS REQUIRED PER 4.16.2.1
APPLICANT PROPOSES TO SUBSTITUTE THE MINIMUM REQUIRED F
THE AP ,
WITH THE FOLLOWING:
PROVIDED FACILITIES
ACTIVE RECREATION AREAS:
;SWIMMING POOL
WORKOUT FACILITY
DOM.PROJECT NO: 17.0110
CLUBHOUSE
PASSIVE RECREATION AREAS:
I S
TRAILS IN WOODED AREA AND CONNECTION
TO COUNTY TRAILS SYSTEM-GREENWAY
PARKING REQUIREMENTS
REQUIREMENT:
2 SPACES PER UNIT (2BD APT)
1.5 SPACE PER UN ITE (1 BD APT)
96 UNfTS X 2 - 19 SPACES
48UNITS X1-5 - 72 SPACES
264 SPACES TOTAL
ADA REQUIREMENT.
6 GARAGE SPACES (2 SPACES PER GARAGE)
6 SPACES SURFACE PARKING (6 VAN ACCESSIBLE)
TOTAL ADA REQUIREMENT:
12 ADA (2 VAN ACCESSIBLE)
PROVIDED:
266, INCLUDING 12 ADA SPACES OK
(9 VAN ACCESSIBLE)
ADT
APARTMENT UNITS
ITE USE GROUP 220 10 VPD/UNIT
TOTAL ADT
1144 UNITS 1440 VPD
LANDSCAPE NOTE
THE IMPERVIOUS AREA DOES NOT EXCEED 80% OF THE SITE AND IS NOT IN
AN ENTRANCE CORRIDOR (32_T9.2(b)).
LANDSCAPE PLAN WILL BE PROVIDED FOR FINAL SITE PLAN SUBMISSION.
� r Int I
II
I
Ii
1
�-'
1a
Cj
i?
Carr'
REMEN1-0,0001
(D8S
�
a
is
� Q *t V
.5
� r
`'
,_.
M
c
UJ
0
II
I
Ii
1
�-'
REMEN1-0,0001
111;
..4�
f
1
DOM.PROJECT NO: 17.0110
INDEX TITLE:
I S
TMP 78— 20 Q
.Ct)/TTN RdN'1'f)PS` f.Tll,(fTF.I} F+dRTNPRRN'lP
BOUNDARY CURVE TABLE
Curve
Length
Radius
Delta
Tangent
Chord
Chord Bearing
C1
80.40'
970.00'
4'44'57"
40.22'
80.38'
S 00'06'53" E
C2
494.99'
1029.99'
2732'06"
252.37'
490.24'
S 113446" E
c>�
c
s"
I
43!
43�
42!
42,
41:
41,
40,
40,
39
39
38
m
37
37
PROP 01',____)'ED NATURE TRAIL PLAN
EX.D) 2A 26 n2C
......
Q0
. .. .... .. ..
..... . .......
5!
-
----- - --- ----
15
tio
U)
■
�00
C95
1
*0
C85
4!80
G5
•
EXIS11NO GRADE -RAE
,�PROPOSED.C
E.
370
DOM. PROJECT NO:
17.0110
INDEX TITLE:
lSpb
SHEET NO:
6 OF 10
.
TROM
7
... .. .....
...... . ....
---lR*-EVC 00,53L
1111' EVC
----------
X
Lu
n -
cq
52t
. ................ . ...
CA
co
to
C4
ci
to,
F) oc
ui
0
+
0
- ---- ----------- ---------
yr
z
t50 10+00 11+00 12+00 13+00 14+00 15+00
PROPOSED SEWER PROFILE (E_)y, D 2j 1)
0ANtTARY 1�1
VERTICAL SCALE: I"=10' HORIZONTAL SCALE: C=30
of
.9
WMUL F. AIYM��_
Lic. No. 33028
03-05-2018
irk-',O_�
701
DATE: 03/06/2018
Q0
15
tio
■
�00
C95
1
*0
C85
4!80
G5
•
370
DOM. PROJECT NO:
17.0110
INDEX TITLE:
lSpb
SHEET NO:
6 OF 10
DATE: 03/06/2018
Project Name:
Date:
VRRM SPREADSHEET
South Pantops Vista
+03/C11/211 &
Design SpecificationsDraft Specs
"Site Information
',Land Cover (acres)
Impervious Cover (acres) I 2.89
*ForestlOpen Sp ace areas ranust be protected in accordance with the Virginia Runoff eduction Method13.76
Constants
Annual Rainfall (inches)
43
,Target Rainfall Event (inches)
1.00
"Total Phosphorus (TP) EMC(mg/L)
0.26
:,Total Nitrogen (TN) EMC (mg/L)
1.86
-'Target TP Load (Ib/acre/yr)
0.41
`,Pj (unitless correction factor)
0.90
Runoff Coefficients f Rvi
L,�ONAL
A soils
B sails
C Soils
D Soils
Forest/Open Space
0,02
0,03
0.04
0.05
Managed Turf
0,15
0.20
0.22
0.25
Impervious Cover
0.95
0.95
0.95
0.95
L,�ONAL
THE CARRIAGE HILL (SDP 2000-00013) POND COMPUTATIONS AND NARRATIVE SHOWS THAT THE 2 YEAR
AND 10 YEAR FLOWS LEA'VIN(G THE EXISTING 54" PIPE UNDER SOUTH PANTOPS IS 75 cfs AND 101 cfs
RESPECTIVELY. THE PRELIMINARY ANALYSIS ANTICIPATES THAT OUR 2 YEAR AND 10 YEAR PEAK FLOWS
WILL OCCUR BEFORE THE PEAK FLOWS LEAVING THE EXISTING 54" PIPE AND THEREFORE WILL SATISFY THE
2 YEAR VELOCITY AND 10 YEAR VOLUME REQUIREMENTS FOR ADEQUATE CHANNELS TO THE RIVANNA RIVER.
THE WATER QUALITY PORTIONS OF THIS PLAN WILL BE SATISFIED WITH PURCHASING 1.91 Ib/yr OF OFFSITE
NUTRIENT CREDITS IN THE SAME OR ADJACENT HYDROLOGIC UNIT CODE (02010204).
INDEX TITLE:
0
0
TP Load
Reduction Required (lb/yr) 1.9i
--------------------------------
-----------------
W
�
:z
LAND
• - SUMMARY
POST DEVELOPMENT
Land Cover Summary
Treatment Volume and Nutrient Loaid
Forest/Open Space Cover (acres)
9 44
Treatment Volume
(cre_f
0 2759
x
LU
L'
c
w
E-
T reatrner�t Volume (cubic feet)
12,08
A
% Forest
691a
TP toad (Ib/yr)
7 55
Managed Turf Cover (acres)
143
TN Load (Ib/yr)
Informational Purposes Onl
54 02
ui
Weighted Rv (turf)
0 20 I
G
__.
% I`v`:anaged Turf:
10.°,✓¢
T1"'1
Al 1�
Impervious Cover (acres)
2 89
W
Rv (impervious)
5
0 1::P:
% impervious
21%
Site Area (acres)
13 76
Ci
x
�
Site Rv
(} 24
E-
C)
QQ W
E.®,
STORMWATER NARRATIVE:
IF THE TOTAL DRAINAGE AREA TO A POINT ON THE EDGE OF THE DEVELOPMENT PROPERTY
IS LESS THAN
1% OF THE TOTAL DRAINAGE AREA TO
THAT POINT OF ANALYSIS, THEN THE CHANNEL AND
FLOOD
E--,
Cn
irZI
PROTECTION HAS BEEN MET IFOR THE
SITE. CONCENTRATED FLOWS MUST BE CONVEYED TO
AN ADEQUATE
>_4
CHANNEL. SITE AREA = 13.31 ACRES.
DRAINAGE AREA OF THE RIVANNA RIVER AT OUTFALL
OF PROPERTY
IS 472 SQUARE MILES BASED) ON THE
FEMA FLOOD INSURANCE STUDY APRIL 2, 2014 PAGE
15.
472 mit = 302,080 acres
J
1 % OF 302,080 acres = 3,021 acres
> 13.31 acres OK
W
LU
THE CARRIAGE HILL (SDP 2000-00013) POND COMPUTATIONS AND NARRATIVE SHOWS THAT THE 2 YEAR
AND 10 YEAR FLOWS LEA'VIN(G THE EXISTING 54" PIPE UNDER SOUTH PANTOPS IS 75 cfs AND 101 cfs
RESPECTIVELY. THE PRELIMINARY ANALYSIS ANTICIPATES THAT OUR 2 YEAR AND 10 YEAR PEAK FLOWS
WILL OCCUR BEFORE THE PEAK FLOWS LEAVING THE EXISTING 54" PIPE AND THEREFORE WILL SATISFY THE
2 YEAR VELOCITY AND 10 YEAR VOLUME REQUIREMENTS FOR ADEQUATE CHANNELS TO THE RIVANNA RIVER.
THE WATER QUALITY PORTIONS OF THIS PLAN WILL BE SATISFIED WITH PURCHASING 1.91 Ib/yr OF OFFSITE
NUTRIENT CREDITS IN THE SAME OR ADJACENT HYDROLOGIC UNIT CODE (02010204).
INDEX TITLE:
Ar CO
44,r
44(
43,'
43(
42.`
42(
41'
41(
40,
40(
39!
39(
38,'
38(
n
SIGHT LIK)TANCE PROFILE
VERTICAL WALE: 1"=10' HORIZONTAL SCALE: C-30'
450
445
440
435
430
425
420
415
410
405
400
395
390
385
380
y H of
MUM
Lie. No. 33028
10 03-05-201 R-
9NA
I
C;)
C
C 0 5:
43 0 b
(D smV
M co
0
kl,
PROPOSED RIGHT-OF-WAY
DEDICATION (WIDTH VARIES)
RICHT—OF—WAY VARIES If H Op
PROPERTY LINE�
F.
Lie. No. 33028
'd
PROPOSED PROPOSED EXISTING ROAD EXISTING 0305-2018
PROPOSED 5' 12' RIGHT TURN LANE 24' CURB TO EP 5'
GUARDRAIL CONC. SIDEWALK MATCH EXISTING CROSS CONC. SOA
{SEE PLAN FOR SLOPE SIDEWALK
SI TE LOCATION) 0.5' TYP 0.5' TYP
PROPOSED
PROPOSED 2.0% PROPOSED EXISTING EDGE —EXISTING GRADE
RETAINING WALL A; GRADE OF PAVEMENT
\CG -6 LU — — — — — — — — — — — — — — — — _T CG -6-,r
NEEDED (SEE PLAN -------------------- —P-;7.
LU
FOR LOCATION) :r
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 0
EXISTING GRADE MATCH EXISTING z z
PAVEMENT SECTION 0 0
DIMENSION IS 1' WHERE
THERE IS NO GUARDRAIL
>
SOUTH PANTOPS DRFVE C3
Lu
Cn
TYPICAL ROAD CRO',�_�)S "ECTION
M UJ
NOT TO SCALE
iii
VTOT TRAFFICCOUNT LEFT TURN LANE WARRANT' RIGHT TURN LANE WARRANT z
z
00
SUMMARY FIG'0-0 F I G, 3 -2_J'6
1. JT(v'NnuuJ,.Apartrn.ent Code 220, pg 308
Vi.,qin,a 0parevent of Transportation02
Trat,lic Enameerim- LAvislon
2016
oule A 7,
Annual Averaqe Daily Traffic Vo,ume Estimates By Soction of R Average Rate of traffic, 0,6R. (4-6,pm) �.,ttt; 7f7ti.
_1 t 20,
7
Altemarla Maintenance Area
T
4_
------------- Truck --------------- K Di
7 J;
Houte Lenqlh AADT QA 4hie duti QC QK AMNUr QW Year
2N;!@ 34AAa Mail -Mail Fa�iqr Fa,�['m Wilh 65% of traffic entering the Apartments and 35% leaving
_4\
00
TUU r. AND OR REQUI, ED
tS ?54) Rd 7
-%00 R NA NA 10,,M2012 Vehicles per hour Average rat(a x Dwelling unil:5
4
ml
0.62 x 144
Suwbi Pam Dr C.70 5100 R NA NA
1JJ
4,
------ ------- — ---
. .....to
89 VP1I
�N
HS
LL
............. . ....
z
I-owale Lalo- G. 20 940 R - -----
4
651,10 Vehicles entering Apartment 65% x 89 VPH C
NA NA
>
>
F`Qxvafe Lirm C,N 400 R NA NA
58 VPH 4(10 ArMYTTID
9
X
NA NA 04,U5.2012
01 11 9: t',` 49
-20 250 Fit z J.
2. VOOT2016 Traffic Oato Publication for South Pantops Drive N";
yI
An
az ,1 T 4
Fox Harr: Lana 0,11 110 R NA NA 04 D5120 2
1
AADT,; 5100
38
281
W I t42 I
E—
NA G4;05,,'2G!2 E
I n- - - L ..
Fox Hui n Ct iNo VURN LANES
0.08 go R NA
61 �1) C) IF," 7 — D
7. JR
I OR TAPFRS R FM,'
Cul X -Factor-, Not provided by I'll-affic Data Publication.
o eft- I urn,
Uyiie , -
Fox Crest ay ,09 140 e R q u, i r d SJA
4 WL. R NA RA GV05�2012 >
(r 1
Assume 0.base4% n average of 5 comparable road5,.
11 d a
4
Foxchaiie Rido
0.?tl
170
I
R
NA
NA
G015t2012
0.096
RT -250 Richmond Rd
._l
T15
0.104
Average
0.108
ac Rioters WAY
C 44
2700
R
NA
NA
1018`"?012
(D
r'Ul q�
PHV - Peak 14,,--)ur Volume iiabu Design Huvrly V;Aurne equivaleint)
M
& AIR
0A C
pFox Ct
:1.0
80
NA
NA
04,05,20 12
unn og
S. 1 CO- 1§8
114 1: 117
Runn aq Fox Lane
0 I'll
Iso
R
"I4,
NA
NA
RQUte
K -Factor
RT -40 Thurnas Jefferson Pkwy
0134
RT -240 Three. Natchid, Ad
0.102
RT -250 Grady Ave
0.096
RT -250 Richmond Rd
0.104
RT -1455 Whitewood Rd
0.104
Average
0.108
Ar,
LID I
PHY A "-HOACH TOTALWHICLIES FIER WUR
0
2 0 u�, 28' torj b U T) BU01 0
Appropriate. Rad'US requ'rpdaI all Inter5ections and Entrances (Commordarl or Privala).
V,� ADVANCING VOLAAAE fYPH)
LEGENO
�:D
(D
IF GURE 3-8
PHV - Peak 14,,--)ur Volume iiabu Design Huvrly V;Aurne equivaleint)
M
Adlustmen t for Riaht Turns
Leah iq Fox Ct Q 04 46 R NA NA 04,'05!2012 E ---i C--)
For poVed, speleds at or under 45 mph, PriV right tums > 40, and
PHV total < 300.
Mill GrLok Di 0.27 590 R NA NA 04,05�20,2 Dir�:cticnal factor � 0.5 Adjust . ed right zurns ;� PHV Right Turri s - 20
3. ,t5.4 r1i Cc If PHV is not known use fu( molal PHV =- ADT x K x 0
(D- N1111 geek Dr 4.07 970 R NA NA 00)&'2012 PHV AADT,-, K x D K m the pement of AAD,r accurring in t'�,e peak Flour
D !n the percent of tra1r, ill t 1 -0 E-4
Milli Drek Dr C,25 1400 R NA NA 04,'05,'2012 5100 X 0.11 X 0.5 he pe* dirrvZ n of flow
A— r� E...
Note; An avwage of 11% fur'K X D will SUMKAI�
NAR Reek Dr C, Ki 5400 R NA NA 041105f2012 .281 VPH Cn
IV, �o!,Vflh: Rd
tris'J940 yy" nVIOL:
X;:
L 58/281 21D.6%
Coppgrslone OF 1,03 320 R NA NA 0713112012FIGURE 3-26 FOR RIGHT TURN TREATMENT (2, -LANE HIGHWAY)
E—
z
Coppersione Or U8 220 R NA NA 07,?3112012 3. For Leftturnsf orage lones: Figuire 3-8 frorn Appeiilifix F, "Access tnanagement Desdgn,Storidards J,,)r P;� Z LL,
E..
Qopp-(stone Jr 1U5 45 R NA NA 07,q 112012 En tir ances' Rev. 1115
C,0 Jr
NA NA G4i05P2012 For ftht-turR �toraqe fones, Figure 326frurn Appen-(Iix F, `Acces� rrowragetner7t Desiqn.,Smincfard� lot- LLI
Mill Gf&,k Ct 0,10 180 R LLI
Fn trcynces'
4!M2017 58
Adjustment for Right turns, PHV Right Turn, 20 = 58 VPH -20 38 VPN DOM. PROJECT NO: 17.0110
INDEX TITLE:
I S P
TURN LANE W_/kRR_A`NT ANA'LYQt__-D` SHEET NO: 9 OF 10
DATE: 03/05/2018