HomeMy WebLinkAboutWPO201600012 Bond WPO VSMP 2016-03-29 et'et" 1/1 ////26
internal UKOniv / A „[ / ' /
Date Received: Fee Paid: • 'ICI cC Y/4/4°
4// 4°
Received
Wake: Forward to Manage:::eot Anabil =.eta = I�fb_14 e
REQUEST TO ESTABLISH A BOND Mil ' 1
,Z0
it/APPROVED PLAN# PO,2Ottat9oo 1 2 tn ®
e1i0A-
��
/1/r (
PROJECT NAME: � n i.�.:� �,�f� �t'u.`��►a<) t cif l� ,'q � 6ayng64-c-e_
(As listed on the approved plan) J�
•
All parcels in the project,including any off-site work if easements are not provided,and current owners. Use a
separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
TAX MAPs/PARCELs: O3.2 _ (ppO OWNER'S NAME: e.. j j 1 ri.rlQ 'p")a I A .
SIGNATURE: date: a/q //(0
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs I PARCELs: OWNER'S NAME:
SIGNATURE: date:
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including,but not limited to the name of corporation,partnership,limited liability company,
trust,association,etc.,documents acceptable to the County must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
0 VESCP Erosion&Sediment Control per Water Protection Ordinance section 17-207;$0 fee
L1,/VSMP Erosion and Sediment Control,Stormwater Management and Mitigation per Water
Protection Ordinance section 17-208;$250 fee required
O Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
&Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner.;Please provide
contact information.Please also copy dodonohue@balzer.cc & rstrite@harmohaonstruction.com
EMAIL: l_.D%A.1 . e. e..r-,--# t c, --t �lC Pi k E-.
OR REGULAR MAIL ADDRESS: 5�tv�c 1-..f-� Pt�c,►.a-
� )c-61- b)vet oo
Revised 6/20/2014 N c. -1-5c 7'7 0
Date Recei%ed: q127-41 t•'ee Paid: a7) °:NLrr4"e `� Jv'
� / (f 7/
intalm: Fornard to Management.aaa!?.t M
4
t.
wfcrf:' •
ti1;r;tS1?* r'� , I) no
W&-) 714.04-ix-cat
BOND INSPECTION REQUEST Z
APPROVED PLAN ti WPO201600012 --fht.
PROJECT NAME: LANDMARK AVIATION HANGAR
(As listed on the approved plan)
This is to request that an inspection he perforated by the C'ounty. Where fees are assessed.a fee is required for
each inspection. Please check the inspections requested.
!'SMP/4'E SCP Erosion Control.Stormwater Management and/or Mitigation per
Water Protection Ordinance section 17-207 & 208 $250
L.! Subdivision (roads, drainage. etc )per Subdivision Ordinance section 14-435 and 14-438: S269
0 Water& Sewer per Subditii,,iou Ordinance section 14-435 $269
0 Site Development Performance bond(Incomplete Site Work& Landscape Maintenance) $301
TOTAL FEES$250
inspections for the purposes of bond reduction or release will require a separate fee for each bond.
�a;+rtit r:':iiles:s to: 1)ep:artsr.em of t :): selo mcnz,401 McIntire Road. North 1ti nk
. C'hatrlrttcat ilk,
VA 22i0':. �1t �;?1;+;�.. lla:: �,-, >i a:,•:t,,:r d5,11Xh.. . 434-97%4:
storm satyr re,i ire c n,t:t:ciii`;°. r. rJ Iral.ine.s. inspection reports. and .:,)crpi4imi prNesses
through VIK)I.or DEQ. Bonds l+ili Iltlt be reduced or released sNithout record drawings and inspection
documentation per the state requirements and county's published procedures. A minimum 29"'t,of the original
posting is held until nes:epta:ce of all bonded iitnprozements For Site Development Performance bonen, if
landscape installation is part of the bonded iliczim pl.te site.cork.a n:(111e i 111r reduction s?:o:riti ot;iy be made
once all site work is complete.
I he rerised estimate should he sent to;
EMAIL: Tom.Vliek@signatureffight.com
OR RH aVt.AR MAil. ALDRl:SS: 201 South Orange Avenue Suite 1100
Orlando, FL 32801
64;42
Sitnaitt;n:?;f()%ner. X%c'ist er
Tom Vliek 9/22/2017
h;i;li Name Dalt'