Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutARB201800151 Action Letter 2019-01-25COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
January 25, 2019
Christopher R. Jaeger, P.E.
Talbert & Bright
10105 Krause Road
Chesterfield, Va. 23832
RE: ARB-2018-151: Airport Entry Pavilion Site Plan Amendment (TM/Parce103200000001000)
Dear Mr. Jaeger,
The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Tuesday,
January 22, 2019. The Board unanimously approved the request, pending staff administrative approval of the
following conditions:
1. Add the standard mechanical equipment note to the site and architectural plans: Visibility ofall mechanical
equipment from the Entrance Corridor shall be eliminated.
2. Provide a photometric plan showing the light levels at the ground around the entrance pavilion. Ensure that
light levels do not exceed 20 fc.
3. Include a luminaire schedule in the plan. Indicate a consistent color temperature for the fixtures.
4. Include the standard lighting note on the photometric plan: Each outdoor luminaire equipped with a lamp
that emits 3, 000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded
to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of
lightingfrom luminaires onto public roads and property in residential or rural areas zoning districts shall
not exceed one half footcandle.
5. Provide in the entrance pavilion site plan a landscape plan that includes trees and shrubs in the new
planting island located east of the pavilion.
Please provide:
1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision
dates on each drawing.
2. A memo including detailed responses indicating how each condition has been satisfied. If changes
other than those requested have been made, identify those changes in the memo also. Highlighting the
changes in the drawing with "clouding" or by other means will facilitate review and approval.
3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to
ensure proper tracking and distribution.
When staffs review of this information indicates that all conditions of approval have been met, a Certificate of
Appropriateness may be issued.
If you have any questions, please do not hesitate to contact me.
Sincerely, 1
,7/Z #i IX,
Margaret Maliszewski
Chief of Planning/Resource Management
434-296-5832 x3276
mmaliszewski@albemarle.org
Cc: Charlottesville -Albemarle Airport Authority
100 Bowen Loop
Suite 200
Charlottesville Va 22911
File ARB-2018-151
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff
has indicated below what they think will be required as a resubmission of revisions. If you need to submit
additional information please explain on this form for the benefit of the intake staff. All plans must be
collated and folded to fit into legal size files, in order to be accepted for submittal.
TO:
DATE:
PROJECT NAME: ARB-2018-151: Airport Entry Pavilion Site Plan Amendment
Submittal Type Requiring Revisions () indicates submittal Cade
County Project Number
# Copies
Erosion & Sediment Control Plan (E&S)
Mitigation Plan (MP)
Waiver Request (WR)
Stormwater Management Plan (SWMP)
Road Plan (RP)
Private Road Request, with private/public comparison (PRR)
Private Road Request — Development Area (PRR-DA)
Preliminary Site Plan (PSP)
Final Site Plan (or amendment) (FSP)
Final Plat FP
Preliminary Plat (PP)
Easement Plat (EP)
Boundary Adjustment Plat (BAP)
Rezoning Plan (REZ)
Special Use Permit Concept Plan (SP-CP
Reduced Concept Plan (R-CP)
Proffers (P)
Bond Estimate Request (BER)
Draft Groundwater Management Plan (D-GWMP)
Final Groundwater Management Plan (F-GWMP)
Aquifer Testing Work Plan (ATWP)
Groundwater Assessment Report (GWAR)
Architectural Review Board (ARB)
ARB201800151
Other: Please explain
(For staff use only)
Submittal Code
# Copies
Distribute To:
Submittal Code
# Copies
Distribute To:
ARB
2
Margaret Maliszewski