Regarding: Lighthouse Instruments - Plan Review
Transmittal
Date: December 17, 2018
Job No.: 41210
We are sending you the following items: E. Attached ❑ Under separate cover via
❑ Shop Drawings ❑ Prints ❑ Plans ❑ Specifications
❑ Copy of Letter ❑ Change Order ❑ Other
lies Date
1 December 17, 2018
1 December 17, 2018
1 December 17, 2018
1 December 17, 2018
This information is transmitted as checked below:
Floodplain Development Permit
Comment Response Letter
FEMA FIRM
Letter from Craig
®
For Approval
❑
Approved as submitted
❑
For your use
❑
Approved as noted
®
As requested
❑
Returned for corrections
❑
For review/comment
❑
Other _
❑
Prints returned after loan to us
Remarks:
Copy to: RECE11W
DEC 19 pall
COMMUNny
DEVELOPMEN-
Received by:
Name (printed)
❑
Resubmit
❑
Submit
❑
Return
❑
for bids due
Signed:
Signature
copies for approval
_ copies for distribution
_ corrected prints
Aaron Mabee
Phone: 434.295.5624
If enclosures are not as noted, please notify us at once
s
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
December 11, 2018
Frank Pohl
Albemarle County
401 McIntire Rd
Charlottesville, VA 22902
608 Preston Avenue P 434.295.5624
Suite 200 F 434.295.8317
Charlottesville, VA 22903 www.timmons.com
RE: Lighthouse Instruments — Plan Review — FDP201800019 - Comment Response Letter
Dear Mr. Pohl:
We have reviewed all of your comments from September 17, 2018 and made the necessary
revisions. Please find our responses to the comments below in bold lettering.
Engineering Comments:
1. Refer to Albemarle County Design Standards Manual for permitting requirements.
Acknowledged.
2. Provide a set of drawings showing:
a. All proposed development/work to occur within the floodplain, including grading
(existing/proposed), improvements, etc.,
Sanitary Sewer work within the floodplain is shown on the Layout Plan, sheet C4.0 of
the VSMP plans and the Storm drain work within the floodplain is shown on Grading &
Drainage Plan, sheet C5.0 of the VSMP plans.
b. Flood Hazard Overlay District information (limits of floodplain, floodway, flood
elevations, FRIM panel #, and the flood zone).
Floodplain, floodway, and flood zone are shown on Existing Conditions, sheet C2.0.
FIRM and flood elevation has been added to the Cover, sheet C0.0.
3. Remove the County Engineers (CE) name from the application. Instead, state that what
you are proposing meets the floodplain regulations and why, not that the CE said it was
okay.
The application has been revised.
4. Submit a no -rise certification.
A no -rise certification letter has been provided.
S. Provide a�contact phone number as required on the application (or email address).
Agent's contact information has been added to the application.
•7. Fr4,iir;+..i..
::..ear,-,'�.
CIVIL ENGINEERINd f 'ENVItZONMENTAL SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
We have included PDF copies of the plans and calculations for your review. If you have any
questions or comments, please feel free to give me a call at 434.295.5624.
Sincerely,
Jonathan Showalter, PE
Project Engineer
Lighthouse Instruments
September 17, 2018 1A.514
o amn o.oss a®mr
5 i 0 6aS5 4; 1�
LLQr 674 krri
Jurisdictional
Boundary
Flood Insurance
Rate Map
(FIRM)
Letters of Map
• Amendment
(LOMAS)
LOMRs-.
Effectie
Base Flogd "' ; , :-
Elevation -
Regulatory
Floodway
7% Annual
Chance Flood
Hazard (all A
and V zones)
Area of Minimal
Flood Hazard
0.2% Annual
Chance Flood
Hazard
Source: Esr4 OgitWGIDbe,
GeoEye, EarthstarGeographics,
CNES/Airbus DS, USDA, USGS,
AeroGRR IGN, and the GISUser
Community
Cirmted rmm the V FR1S Map V
(emap2.yinaeduMeFb da."rWAt"
Center for
CoastaE
Resources
Management
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
December 11, 2018
Frank Pohl
Albemarle County
401 McIntire Rd
Charlottesville, VA 22902
FDP201800019 No -Rise Certification
Dear Mr. Pohl:
608 Preston Avenue P 434.295.5624
Suite 200 F 434.295.8317
Charlottesville, VA 22903 www.timmons.com
For the Lighthouse Instruments project disturbance in the flood plain is limited to utility trenching for
connection to a stormwater pipe outfall into Moores Creek and a sanitary connection to the existing
sanitary sewer main. All disturbed ground will be restored to the existing grade and revegetated when
work is complete. No fill will occur within the floodplain. It is my opinion that these activities will not
increase the flood elevation.